Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57793

Received: 11/12/2021

Respondent: Mr Jon Pavey

Representation Summary:

In addition to requiring that the risk of flooding is not increased elsewhere as a result of new development (including peak runoff rate should be no greater for the developed site than it was for the undeveloped site), in setting out the approach to runoff rates, the Plan should be clear there should be no reduction in runoff rates under non-flood circumstances.
This is to ensure biodiversity in downstream watercourses that is dependent on such flows is not adversely impacted, and similarly the amenity of flowing streams and rivers is not compromised by upstream developments.

Full text:

In addition to requiring that the risk of flooding is not increased elsewhere as a result of new development (including peak runoff rate should be no greater for the developed site than it was for the undeveloped site), in setting out the approach to runoff rates, the Plan should be clear there should be no reduction in runoff rates under non-flood circumstances.
This is to ensure biodiversity in downstream watercourses that is dependent on such flows is not adversely impacted, and similarly the amenity of flowing streams and rivers is not compromised by upstream developments.