Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 57678
Received: 11/12/2021
Respondent: Mrs Jennifer Conroy
Representation Summary:
Supported: Note: Fulfillment of S/NEC Policy as a result of the requirement of CWWTP relocation to the Green Belt to fulfill it is contrary to this Policy
Full text:
Supported: Note: Fulfillment of S/NEC Policy as a result of the requirement of CWWTP relocation to the Green Belt to fulfill it is contrary to this Policy