Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57652

Received: 11/12/2021

Respondent: Endurance Estates - Balsham Site

Agent: Carter Jonas

Representation Summary:

Land to the east of Ridgeway and Old Pinewood Way, Papworth Everard (HELAA site 40439)

A capacity assessment should be undertaken of all villages in South Cambridgeshire to determine which potential housing sites might be deliverable or developable during the plan period to 2041, and the number of dwellings that might be delivered from each of those sites.

It is requested that the site size limits for each category of village are deleted and replaced with a general policy that supports development within existing settlement boundaries, in conjunction with a revised development strategy that allocates suitable sites on the edge of existing sustainable villages including at Balsham.

Full text:

OBJECT

Endurance Estates is promoting land off Old House Road in Balsham for residential development, and in representations has requested that the site is allocated in emerging GCLP. Balsham is defined as a Group Village in the settlement hierarchy for South Cambridgeshire, and Endurance Estates agree with the status of the village.

As set out in the representations to Policy S/SB: Settlement Boundaries, it is considered that there is limited capacity within the settlement boundaries of most villages. There are few outstanding development opportunities for up to 8 dwellings (or 15 dwellings on previously developed sites) within existing settlement boundaries in Group Villages, and Balsham is an example where there are no opportunities within the boundary for sites of 8 dwellings or more. It is likely that in most cases only small sites for one or two dwellings would be available. It is considered that the site size thresholds for each category of village are largely irrelevant and ineffective because very few sites are actually available, and those that are available would fall below the threshold where affordable housing is required e.g. less than 10 dwellings.

Requested Change

It is requested that a capacity assessment is undertaken of all villages in South Cambridgeshire to determine which potential housing sites might be deliverable or developable during the plan period to 2041, and the number of dwellings that might be delivered from each of those sites.

It is requested that the site size limits for each category of village are deleted and replaced with a general policy that supports development within existing settlement boundaries, in conjunction with a revised development strategy that allocates suitable sites on the edge of existing sustainable villages including at Balsham.