Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57348

Received: 10/12/2021

Respondent: Bloor Homes Eastern

Agent: Carter Jonas

Representation Summary:

Summary: Land east of Ridgeway and Old Pinewood Way, Papworth Everard (HELAA site 40439)

Small scale housing allocations should be made in the more sustainable villages within the rest of the rural area, because those villages are accessible by sustainable modes of transport, there is a need to support the existing services and facilities within those villages, and there is an identified need for affordable housing in those villages which would not be met via other means.

Full text:

OBJECT

Bloor Homes Eastern is promoting land east of Ridgeway and Old Pinewood Way, Papworth Everard for residential development, and in representations has requested that the site is allocated in emerging GCLP. These representations to Policy S/DS are focussed on the preferred development strategy for the rest of the rural area, and specifically the decision to allocate a very limited amount of development to the more sustainable villages.

The overall development strategy is very reliant on the delivery of extensions to an existing new settlement (Cambourne West + an additional 1,950 dwellings at Cambourne), planned new settlements (Northstowe, Waterbeach and Bourn Airfield) and new communities on the edge of Cambridge (North East Cambridge and Cambridge East). It is acknowledged that the principle of development at most of these strategic sites is already established through adopted development plan documents; the additional dwellings at Cambourne is proposed through emerging GCLP and associated with East West Rail. However, it is considered that there are a number of risks associated with the preferred development strategy, which relate to housing delivery rates and whether these can be increased at some new settlements, the relocation of existing uses from some sites, and the delivery of affordable housing.

The most recent housing trajectory for Greater Cambridge (published April 2021) already predict high average annual housing delivery rates for the new settlements; Northstowe and Waterbeach are predicted to deliver 250 dwellings per annum, and Cambourne West and Bourn Airfield are predicted to deliver a combined total of 300 dwellings per annum. Cambourne has historically delivered approximately 230 dwellings per annum. Hampton (in Peterborough) has historically delivered 259 dwellings per annum. Cranbrook (in East Devon) which has the highest annual delivery rate of current new settlements is delivering at 295 dwellings per annum). The Inspector for the Huntingdonshire Local Plan recommended that the combined housing delivery rates for Alconbury Weald (the former Alconbury Airfield and Grange Farm) should be no higher than 300 dwellings per annum, and for St Neots East (Loves Farm and Wintringham Park) should be no higher than 200 dwellings per annum. The predicted average housing delivery rates at Northstowe, Waterbeach and Cambourne West/Bourn Airfield already appear to be at levels comparable to or higher than other new settlements elsewhere. It is likely that current predicted delivery rates are already optimistic, but there is no credible evidence that faster housing delivery rates can be achieved at Northstowe or Waterbeach. It is noted that Cambourne, Hampton and Cranbrook all had multiple housebuilders on site at the same time and delivered affordable and market housing in conjunction with one another. It is requested that predicted housing delivery rates for the new settlements take into account the above comments, and the assumption that faster housing delivery rates can be achieved at Northstowe and Waterbeach should be deleted from the development strategy.

North East Cambridge and Cambridge East are allocated in both Local Plans as strategic sites. It is acknowledged that these sites involve the re-use of previously developed land. However, the redevelopment of these sites is complex and involves the relocation of the existing uses; the relocation of a sewage treatment works and existing businesses in the case of North East Cambridge, and the relocation of airport related uses and businesses in the case of Cambridge East. It is considered that the delivery of development at these sites will need to be realistic, taking into account all of the challenges that need to be overcome prior to the commencement of development. It is requested that realistic assumptions about delivery are applied for North East Cambridge and Cambridge East.

It is noted that most of the new settlements will deliver less affordable housing than the normal policy requirement of 40%, mainly because of the need for these developments to also deliver significant levels of new transport and community infrastructure in initial phases. The affordable housing contributions are as follows: 20% at Northstowe, 30% at Waterbeach, 30% at Cambridge East (Wing), 30% at Cambourne West and 40% at Bourn Airfield, although all are subject to a review mechanism that could result in adjustments to the level of affordable housing. The proportion of affordable housing that will be provided from the developments at North East Cambridge and Cambridge East are unknown at this stage, but because of the costs associated with the relocation of existing uses and the delivery of new transport infrastructure it is very unlikely that 40% affordable housing will be provided at least in the initial phases. It is clear that the existing and planned new settlements and new communities in the edge of Cambridge are not and will not provide enough affordable housing, which should be a concern in an area such as Greater Cambridge which has significant housing affordability issues. It is requested that, in order to address the under-delivery of affordable housing from Northstowe, Waterbeach, Cambourne West, North East Cambridge and Cambridge East, the development strategy should allocate additional sites that are capable of providing policy compliant levels of affordable housing including small and medium sites in the villages.

The preferred development strategy for the rest of the rural area is based on the assumption that the villages in this area are unsustainable because existing and future residents would need to travel by car to access services and facilities and employment opportunities. It is considered that this assumption is incorrect for some villages, including Papworth Everard, which contain a good range of services and facilities and is accessible by sustainable modes of transport. In addition, the preferred development strategy for the rest of the rural area provides no support for existing services and facilities in villages and provides no strategy to meet current identified affordable housing needs of villages. Bloor Homes Eastern are not advocating a dispersed development strategy whereby most development is directed to the villages, but is requesting that a sufficient amount of land is allocated at the more sustainable villages to support services and ensure that identified affordable housing needs are met.

There are three paragraphs in the NPPF that suggest a different approach is required in the development strategy for the rest of the rural area. Paragraph 105 seeks to ensure that development is located where the need to travel will be minimised and the use of sustainable transport modes can be maximised, but acknowledges that the opportunities will be different in urban and rural areas. Paragraph 79 seeks to promote sustainable development in rural areas by locating housing where it will enhance or maintain the vitality of rural communities and enable villages to grow and thrive. Paragraph 62 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders.

Papworth Everard is defined as a Minor Rural Centre in South Cambridgeshire District Council's current settlement hierarchy, and no amendment is proposed to this by the current consultation document. The settlement therefore sits towards the top of the Council’s settlement hierarchy. Papworth Everard contains an extensive range of services and facilities including a convenience store, hairdressers, fish and chip shop, coffee shop and a restaurant, a primary school, children’s nurseries, post office, library, doctor’s surgery/health centre, veterinary surgery, churches and village hall. Development has also commenced to deliver a bakery, microbrewery and Public
House on the former print works site, south of Church Lane. This demonstrates the site is very well connected to existing services and facilities within the village.

Papworth Hospital has previously been the main employer in the village although the facilities and functions of the hospital have now been relocated. The former hospital site is however positively promoted within the adopted plan for future employment generating uses. The First Proposals consultation document maintains this policy approach. Papworth Business Park, located at the southern edge of the village, is the main employment area. The services, facilities and employment opportunities which exist within Papworth Everard are all reflective of its designation as a Minor Rural Centre.

Where people do need to travel out of the village, there is access to an established bus service which provides connections from the village to Cambourne, St Neots, Cambridge, Huntingdon and St Ives. The main bus route is provided by the X3 bus. While this currently provides an hourly service, there are gaps in the timetable during the AM and PM peak hour. As a result, it is difficult for residents of Papworth to utilise this as a commuter service. It was therefore agreed with the operator during the consideration of the previous applications on the site that the development would deliver enhancements to the service to provide additional services in the AM and PM peak hours.

However, an enhanced bus network was discussed at the Greater Cambridge Partnership’s Executive Board committee meeting on 30 September 2021. The report pack associated with this meeting identifies Papworth Everard as being within the Northstowe to St Ives corridor and states that the proposals could include a new hourly service for Papworth Everard with potential implementation in 2023.

Cambridgeshire County Council are also currently delivering a cycle and pedestrian link from Papworth to Cambourne. This will provide a 2m wide cycle path along the eastern side of the A1198 to provide a link between the existing cycle path located north of the A1198/A428 junction, and the existing footpath network at the southern point of Papworth. The works are currently scheduled to be completed by February 2022. This will provide a direct cycle link to Cambourne, and all of the facilities provided within it.

East West Rail is a major infrastructure project which is proposed to connect Oxford and Cambridge.
Consultation took place from March to June 2021 on route alignment. All of the five routes proposed for the Bedford to Cambridge section of the route include a new station at Cambourne. Although the exact location of this is to be determined, this would provide significantly improved rail connections to the residents of Papworth Everard.

Upgrades are also proposed to the A428 between the Black Cat roundabout and Caxton Gibbet roundabout with a new 10-mile dual carriageway and a number of junction improvements. A Development Consent Order application was submitted on 26 February 2021. This entered the examination stage on 18 August 2021 and the draft examination timetable has now been published and it is currently anticipated that the examination will close in February 2022.

Papworth Everard and land to the east of the Ridgeway and Old Pinewood Way, Papworth Everard are sustainably located to accommodate much needed new housing development which will also ensure the existing facilities and services within the village are supported. The proposed development would also deliver a number of benefits including significant areas of public open space, green infrastructure and biodiversity enhancements. The protected trees within the site would be retained and significant new woodland planting would take place.

The proposals would also include for the benefits that were associated with the previous proposal for the site including: reserve land for a pre-school facility; contributions towards primary and secondary school provision; library contribution; contribution for improvements to Papworth Surgery; enhancements to off-site public footpaths; enhancements to bus services to deliver an additional service in the peak hour.

The Masterplan submitted with these representations also demonstrates how additional benefits could be delivered including a scout hut/community facility. The proposed development is landscape led, with significant areas of open space and planting. Bloor Homes Eastern are also committed to ensuring the suitability of the proposed development, not just in terms of its location, but also through the inclusion of EV charging points, air source heat pumps, PV panels and a car club with associated car club spaces throughout the proposed development.

South Cambridgeshire District Council's 'Housing Statistical Information Leaflet' (December 2019) identified a need for 41 affordable dwellings in Papworth Everard. This identified need would not be met without allocations in Papworth Everard. It is noted that there is no neighbourhood plan being prepared for the village, no community land trust, and rural housing exception schemes are typically very small and are reliant on a landowner willing to offer land up at existing use value. The promoted development by Bloor Homes Eastern at land east of Ridgeway and Old Pinewood Way, Papworth Everard would include market housing and affordable housing to meet local needs of the village. Given the age of the document referenced above it is also likely that affordable housing need in the village is now greater than that stated above.

For all these reasons, small scale housing allocations should be made in the more sustainable villages within the rest of the rural area, because those villages are accessible by sustainable modes of transport, there is a need to support the existing services and facilities within those villages, and there is an identified need for affordable housing in those villages which would not be met via other means.