Greater Cambridge Local Plan Preferred Options
Representation ID: 57336
Received: 10/12/2021
Respondent: HD Planning Ltd
Representation Summary:
This allocation is heavily reliant on major infrastructure either being relocated (the airport itself) or implemented such as the GCP Cambridge Eastern Access scheme. This allocation could leave the plan vulnerable at Examination stage due to deliverability and viability development risks.
Full text:
This allocation is heavily reliant on major infrastructure either being relocated (the airport itself) or implemented such as the GCP Cambridge Eastern Access scheme. This allocation could leave the plan vulnerable at Examination stage due to deliverability and viability development risks.