Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 57173
Received: 10/12/2021
Respondent: Southern & Regional Developments Ltd
Agent: Claremont Planning Consultancy
Objection is made to the requirement for development to achieve a minimum 20% biodiversity net gain as this is considered too onerous and not achievable in all cases. The Environment Bill introduces a mandatory 10% minimum biodiversity net gain and it is considered that Greater Cambridge should not seek to double this requirement on all development sites.
Objection is made to the requirement for development to achieve a minimum 20% biodiversity net gain as this is considered too onerous and not achievable in all cases. The Environment Bill introduces a mandatory 10% minimum biodiversity net gain and it is considered that Greater Cambridge should not seek to double this requirement on all development sites.