Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56625

Received: 25/11/2021

Respondent: Gamlingay Parish Council

Representation Summary:

A more strategic plan is required rather than a scattergun approach- as per planning application. A new community forest/strategic plan is needed with allocated sites for tree belts/mini forests within sub areas of the district. Gamlingay proposes a necklace of mini forests surrounding the parish to link with existing ancient woodland habitats, which can provide wildlife corridors ( 8 Western Gateway area)

Full text:

A more strategic plan is required rather than a scattergun approach- as per planning application. A new community forest/strategic plan is needed with allocated sites for tree belts/mini forests within sub areas of the district. Gamlingay proposes a necklace of mini forests surrounding the parish to link with existing ancient woodland habitats, which can provide wildlife corridors ( 8 Western Gateway area)