Comment

Draft North East Cambridge Area Action Plan

Representation ID: 55919

Received: 05/10/2020

Respondent: Network Rail

Representation Summary:

In relation to Policy 19, it is acknowledged that the proposed safeguarding of land is indicative
at this stage, however, as it is currently shown in Figure 38 the shaded area is wholly Network
Rail owned land including Network Rail’s station lease area and operational railway land. Any
proposed safeguarding of the land would need to be agreed with Network Rail and further
engagement with Network Rail is required on this matter as and when it progresses.

Attachments: