Policy 12A (Object)
The Policy refers to Trinity Hall Farm Industrial Estate creating up to 1500m2 additional B1 floor area. This figure should be slightly more flexible allowing for a net increase up to 2500m2. The current emerging scheme show an increase of just under 2000m2 net increase, but it is sensible to build in some flexibility. This figure figurer (1500m2 is referred to elsewhere) and should be updated accordingly. The existing site is a low density development comprising circa 5000m2, so it is reasonable to assume the site can easily accommodate a net increase of 2500m2.
Policy 12A (Object)
The Policy refers to Trinity Hall Farm Industrial Estate creating up to 1500m2 additional B1 floor area. This figure should be slightly more flexible allowing for a net increase up to 2500m2. The current emerging scheme show an increase of just under 2000m2 net increase, but it is sensible to build in some flexibility. This figure figurer (1500m2 is referred to elsewhere) and should be updated accordingly. The existing site is a low density development comprising circa 5000m2, so it is reasonable to assume the site can easily accommodate a net increase of 2500m2.