Comment

North East Cambridge Area Action Plan Issues and Options 2019

Representation ID: 33795

Received: 25/03/2019

Respondent: Trinity College

Agent: Bidwells

Representation Summary:

The area should be intensified as a general aspiration. The maximum benefits should be attained from the significant investment that is to take place in the area. A greater density of people (in homes or jobs) will help form a critical mass to be able to truly create a sustainable place with shops, services, facilities and high-quality public transport.

It is difficult to say at this time what ancillary uses should be included within the area. The AAP is set to undergo major change through, in particular, redevelopment and transport infrastructure. There should be a policy context formed that allows for flexibility for a wide range of supporting uses to come forward; but a policy basis that any such development has to present how it supports the objectives of the AAP area.

Full text:

Please see attached representation