Comment
North East Cambridge Area Action Plan Issues and Options 2019
Representation ID: 33038
Received: 25/03/2019
Respondent: Cambridge Water
Representation Summary:
Cambridge Water has experience of collaboration at the design stage for implementing a site wide, dual pipe water recycling scheme at Eddington, and would welcome similar engagement for this development. We are committed to supporting developments with water efficiency standards above those required by planning.
Full text:
Cambridge Water has experience of collaboration at the design stage for implementing a site wide, dual pipe water recycling scheme at Eddington, and would welcome similar engagement for this development. We are committed to supporting developments with water efficiency standards above those required by planning.