Object

North East Cambridge Area Action Plan Issues and Options 2019

Representation ID: 32741

Received: 22/03/2019

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The concept plan is severely lacking in green infrastructure provision and ability to deliver a measurable net gain in biodiversity on site. If the river corridor is added to the AAP this would increase the scope of provide better strategic green infrastructure solutions as well as deliver more by way of biodiversity enhancement associated with the site, rather than having to provide biodiversity offsetting elsewhere in the county.

Full text:

The concept plan is severely lacking in green infrastructure provision and ability to deliver a measurable net gain in biodiversity on site. If the river corridor is added to the AAP this would increase the scope of provide better strategic green infrastructure solutions as well as deliver more by way of biodiversity enhancement associated with the site, rather than having to provide biodiversity offsetting elsewhere in the county.