Support
Grafton Area of Major Change SPD 2017
Representation ID: 32029
Received: 06/11/2017
Respondent: Heather Coleman
Representation Summary:
This whole area was chopped up when the Grafton Centre was built and many public rights of way were entirely privatised. As either a pedestrian or cyclist, the area is confusing and has poor permeability, forcing people to take long detours along often upleasant routes (eg East Road).
Full text:
This whole area was chopped up when the Grafton Centre was built and many public rights of way were entirely privatised. As either a pedestrian or cyclist, the area is confusing and has poor permeability, forcing people to take long detours along often upleasant routes (eg East Road).