Comment
Cambridge Northern Fringe East AAP - Issues and Options
Representation ID: 30532
Received: 02/02/2015
Respondent: Cambridge City Council
Representation Summary:
The site must be viewed as one comprehensive scheme, carefully planned and phased, with opportunities taken to maximise the capacity of the site but in a sustainable way. Much of the phasing and works will be market driven as and when demand is available and there needs to flexibility to recognise this. This should, however, reflect a medium to long term view, not short term. The transport strategy is a key part of this. Piecemeal and incremental infrastructure improvement should be avoided to bring the whole site forward in a timely and cohesive way.
Full text:
See attached document