Comment
Cambridge Northern Fringe East AAP - Issues and Options
Representation ID: 30407
Received: 04/02/2015
Respondent: Milton Parish Council
Representation Summary:
Safeguard the old Network Rail (Lafarge) track on the south side of the First Public Drain as a dedicated cycle path to the station.
It would be good to have more connections to the North and East of the area: a cycle tunnel under the A14 near the railway into Milton Country Park, and a level crossing link to Fen Road and onwards to the River Cam via Grassy Corner.
Full text:
See attached document