Comment

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 30292

Received: 02/02/2015

Respondent: Turnstone Estates Limited

Agent: Carter Jonas

Representation Summary:

The AAP must recognise existing cycle infrastructure which exists in the area, and must consider the scope that may exist for enhancing this. There are important links to the CNFE area from the north, via the Jane Costen Bridge, and possibly up from the River Cam corridor. It is not only a case of ensuring that adequate provision is made in terms of wide cycle paths, etc, but also that these gateways are made as attractive as they possibly can be, therefore encouraging cycle usage.

Full text:

The AAP must recognise existing cycle infrastructure which exists in the area, and must consider the scope that may exist for enhancing this. There are important links to the CNFE area from the north, via the Jane Costen Bridge, and possibly up from the River Cam corridor. It is not only a case of ensuring that adequate provision is made in terms of wide cycle paths, etc, but also that these gateways are made as attractive as they possibly can be, therefore encouraging cycle usage.