Comment
Cambridge Northern Fringe East AAP - Issues and Options
Representation ID: 29955
Received: 02/02/2015
Respondent: Cambridgeshire County Council
Representation Summary:
Viability calculations will need to factor in the very real transport challenges as well as those associated with redesigned/relocated water recycling works.
Full text:
Viability calculations will need to factor in the very real transport challenges as well as those associated with redesigned/relocated water recycling works.