Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168409

Received: 14/10/2019

Respondent: Middle Level Commissioners

Representation Summary:

Land south of Fen Drayton Road, Swavesey

It is noted that this development will be constructed during 2020/23.

This development will require the provision of infrastructure possibly including a telemetry system to control the discharge into the adjacent Flood Risk Management System. The Board considers it appropriate that its requirements are met before work commences on site.

Whilst a meeting has been held with the developer's consultant and discussion has occurred the developer has not yet provided any meaningful proposals or sought the Board's approval.