18 Boxworth End, Swavesey
It is noted that this development will be constructed during 2021/22.
This development will require the provision of infrastructure possibly including a telemetry system to control the discharge into the adjacent Award Drain. The Board considers it appropriate that its requirements are met before work commences on site.