Object
Waterbeach New Town Supplementary Planning Document
Representation ID: 167438
Received: 26/10/2018
Respondent: Mr Michael Richmond
Representation Summary:
1. INTRODUCTION
The SPD lacks vision.
Route motor traffic around the outside of the development, not through the middle.
Give cycle routes priority over motor routes.
Locate schools away from primary motor routes.
Require a cycle / foot path alongside the railway southwards to Cambridge.
Don't relocate the station until the new development is larger than the existing village.
Ban contruction traffic from the existing village.