Comment
Waterbeach New Town Supplementary Planning Document
Representation ID: 167435
Received: 26/10/2018
Respondent: Mr Andrew Ashworth
Representation Summary:
4.2 KEY STRUCTURING ELEMENTS (FIXES)
PUBLIC TRANSPORT
If station has to move, delay till it is needed.
Majority want station remain in the same location but with an upgrade.There is an innevitability about the move - so why is there not going to be a direct footpath/cycle way alongside the railway linking the 2 sites? If it has to move why can't it be delayed until there are communites build close to it?