Object

Waterbeach New Town Supplementary Planning Document

Representation ID: 167430

Received: 26/10/2018

Respondent: RLW Estates

Agent: Boyer Planning

Representation Summary:

6.2 INFRASTRUCTURE DELIVERY PLAN
IDP is to be a working document. Must be clear that the IDP provisions within the SPD are not prescriptive at this point in time.
Reference to improved existing station facilities, access, safety and parking is not consistent with the Local Plan policy requirement to relocate the station.
Improved public transport link to Cambridge from Waterbeach" in the form of a "congestion free bus link" needs to be subject to review in the light of the potential of the relocated station and other sustainable transport measures to achieve the necessary modal shift.
Not clear why the Park and Ride at the A10 is to be funded by S106 and the rail based Park and Ride by direct funding.
Provision of foot/ cycle crossing from site to Cambridge Research Park (CRP)" it is not clear why RLW is listed within the "land holding" column.
Items that refer to A10 junction northern and southern access points should prioritise the provision of the southern A10 access.
New water recycling centre is the preferred solution of Anglia Water and should be specifically included in the IDP.
Specific triggers of numbers of homes specified for community facilities are too specific at this stage.
A more definite and binding framework must be established in this SPD to secure comprehensive development and comprehensive movement.