Waterbeach New Town Supplementary Planning Document

Representation ID: 167333

Received: 26/10/2018

Respondent: Mr Alistair Randall

Representation Summary:

6.2 INFRASTRUCTURE DELIVERY PLAN
It is essential that road infrastructure from the A10 to the new station location is in place before station construction is started. Under no circumstances should construction traffic be routed through residential areas of Waterbeach village, in particular Bannold Road and Cody Road.All A10 upgrades should be in place before construction of housing starts.

Full text:

It is essential that road infrastructure from the A10 to the new station location is in place before station construction is started. Under no circumstances should construction traffic be routed through residential areas of Waterbeach village, in particular Bannold Road and Cody Road.

All A10 upgrades should be in place before construction of housing starts.