Support
Waterbeach New Town Supplementary Planning Document
Representation ID: 167307
Received: 18/10/2018
Respondent: Cambridgeshire County Council
4.2 KEY STRUCTURING ELEMENTS (FIXES)
Support transport objectives and principles with a strong emphasis on walking, cycling and public transport, and the strategic solutions and key infrastructure which will be required to be delivered in a timely manner.
Transport objectives and principles have a significant role in shaping New Town. Strong emphasis on walking, cycling and public transport.
Table 8 - key aspect of transport infrastructure is relocated railway station. Should come forward early, with trigger set by Transport Assessments submitted with both applications. This facility and associated access road should be provided as early as practicably possible.
SPD highlights key findings of the Ely to Cambridge Study strand 2 report and makes clear that the full development is critically dependent on strategic solutions.
Key infrastructure required for the town is set out in the Infrastructure and Delivery Plan in section 6. This will form the basis of a heads of terms for S106 agreements for each outline application.
Full representations in attached document