North East Cambridge Area Action Plan Issues and Options 2019

Search representations

Results for Railfuture East Anglia search

New search New search

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 1: Do you agree with changing the name of the plan to the 'North East Cambridge Area Action Plan'?

Representation ID: 33516

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

The name should identify strongly with "Cambridge". However, we believe this area should also strongly identify as a "transit based" development and thus should be linked to the already well known "Cambridge North" rail and bus stations. The name should reflect this 'transit basis' and be known as the Cambridge North Area Action Plan and ultimately just as "Cambridge North".
In other words
"A place with a strong identity that successfully integrates into Cambridge, bringing economic growth and prosperity that is delivered with social justice and equality.
A high quality, healthy, biodiverse place which will be a major contributor to achieving zero carbon in Greater Cambridge by 2050."
Historic Cambridge must be protected by a series of strong identifiable districts. It must become poly centric.

Object

North East Cambridge Area Action Plan Issues and Options 2019

Question 2: Is the proposed boundary the most appropriate one for the AAP?

Representation ID: 33517

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Fen Road East and River Cam towpath has been excluded between the level crossing and the A14 river bridge. This slither of land NE of the AAP (as the map shows clearly) is central to it as access to the river bank will be needed and be carefully managed and planned.

Leaving out the community established along Fen Road East is neither socially inclusive nor inclusive in terms of the physical planning for the AAP.
The success of the new AAP development may well depend on not creating "left behind" communities along its eastern edge.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 4: Have we identified all relevant constraints present on, or affecting, the North East Cambridge area?

Representation ID: 33518

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Fen Road Level Crossing could become a real problem to train service development. Without further train service development that enables more services to serve North Station those aims cannot be met. The level crossing should be closed with pedestrian and cycle traffic diverted by way of the adjacent riverside underpass. Road traffic along Fen Road East should be upgraded by way of a new road that bridges the railway further and crosses the AAP to join Cowley Road. The suggested bridge could be used jointly by the users of the bridge suggested in Q17.

Increasing the capacity of Cambridge North Station should also be considered.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 5: Do you agree with the proposed Vision for the future of the North East Cambridge area? If not, what might you change?

Representation ID: 33519

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Yes, agree.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 6: Do you agree with the overarching Objectives? If not, what might you change?

Representation ID: 33520

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Yes, we do agree.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 7: Do you support the overall approach shown in the Indicative Concept Plan? Do you have any comments or suggestions to make?

Representation ID: 33521

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Yes, we do agree

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 8: Do you agree that outside of the existing business areas, the eastern part of the North East Cambridge AAP area (i.e. the area east of Milton Road) should provide a higher density mixed us

Representation ID: 33522

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Yes, we do.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 13: Should the AAP require developments in the North East Cambridge AAP area to apply Healthy Towns principles?

Representation ID: 33523

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Yes, it should together with active travel principles that show the development of pleasantly/interestingly designed footpaths and cycleways centres on North Station.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 14: How should the AAP recognise and make best use of the existing and potential new links between the AAP area and the CRC?

Representation ID: 33524

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Way mark the cycleways paralleling the Busway from the North Station together with a cycleway protected crossing of Milton Road. See question 16 also.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 15: Should clusters of taller buildings around areas of high accessibility including district and local centres and transport stops form part of the design-led approach to this new city distr

Representation ID: 33525

Received: 24/03/2019

Respondent: Railfuture East Anglia

Representation Summary:

Yes they should. Places of employment of high quality design should focussed on transport hubs in particular near North stations.

For instructions on how to use the system and make comments, please see our help guide.