Mitcham's Corner Development Framework SPD

Search representations

Results for Telereal Trillium search

New search New search

Object

Mitcham's Corner Development Framework SPD

4.3.20

Representation ID: 31406

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

It is suggested that the second sentence should encourage the specified connections rather than stating that they should be provided. This would better reflect the first sentence and the uncertainty.

Object

Mitcham's Corner Development Framework SPD

4.3.22

Representation ID: 31407

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

Suggest that smaller, more resilient features distributed throughout the development are 'encouraged' rather than 'should be used'. Until detailed assessment is undertaken, it cannot be known the level of mitigation and design credentials associated with the scheme. Flexibility is still required at this stage, although it is agreed that certain principles can be encouraged. In any event, having one larger management feature could be beneficial in the context of 4.3.23 which notes that there is an opportunity to create dynamic focal space that deals with water.

Object

Mitcham's Corner Development Framework SPD

4.3.28

Representation ID: 31408

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

Suggest that this refers broadly to 'landscaping' rather than specifically 'street trees' to provide some flexibility, depending on the final design intentions and relationship with highway design/safety.

Object

Mitcham's Corner Development Framework SPD

Figure 5: Vision and strategic objectives

Representation ID: 31409

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

The quote within the Emerging Local Plan refers to 'local centre' rather than District Centre. The SPD needs to ensure it quotes the Local Plan accurately.
It is not considered that the aim to 'ensure new development promotes healthy and active lifestyles' relates to the theme 'creating a connected place'.
Suggest 'residential' is inserted to the third bullet under Theme 2.
Also Change 'physical' to 'physically' at Theme 3.

Object

Mitcham's Corner Development Framework SPD

Figure 52: Development principles for Henry Giles House

Representation ID: 31410

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

The majority of the principles
are supported. However, it is suggested that reference to 'creation of pedestrian and cycle green links/lanes' is too fixed and fails to provide the necessary flexibility at this high level stage.
It is also suggested that the massing design principles are too cautious and don't seek to
maximise the opportunities at the site.
It is crucial that the SPD maximises the opportunities of the site rather than providing undue restriction. The full scale and massing would be subject to detailed modelling at the application stage.

Object

Mitcham's Corner Development Framework SPD

1.1.2

Representation ID: 31411

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

'Located to the north east of the City Centre...' rather than 'north west'.

Object

Mitcham's Corner Development Framework SPD

Figure 1 & 2: Mitcham's Corner Opportunity Area designated within the emerging Local Plan and location plan

Representation ID: 31412

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

A black line is meant to indicate 'Building frontage'. However, this is not the case. Grey lines mark the base layer of the plan. The only black line is associated with the 'Remnants of Historic High Street'. Suggest 'Building Frontage' is removed from key.
Key includes 'Opportunity for New Urban Space'. However, there is no such area shown on Figure 1. Suggest that this is removed from the Key.

Object

Mitcham's Corner Development Framework SPD

2.1.6

Representation ID: 31414

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

Final sentence does not make sense. Suggest updated to 'At the time, this was reported as Cambridge's Chaos Corner'.

Object

Mitcham's Corner Development Framework SPD

3.2.2

Representation ID: 31415

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

Suggest final sentence is updated to 'Stop-vehicle movement patterns and one way flows create perceptions of high traffic speeds'.

Object

Mitcham's Corner Development Framework SPD

4.2.2

Representation ID: 31419

Received: 17/10/2016

Respondent: Telereal Trillium

Agent: Savills

Representation Summary:

Should refer to 'within the Opportunity Area' rather than 'on the site'.

For instructions on how to use the system and make comments, please see our help guide.