Greater Cambridge Local Plan: Proposed Submission

Search representations

Results for Environment Agency search

New search New search

Comment

Greater Cambridge Local Plan: Proposed Submission

Policy BG/BG: Biodiversity and geodiversity

Representation ID: 214658

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

We support the inclusion of Policy BG/BG, but we recommend that either the policy or supporting paragraphs also include a clear requirement for biosecurity measures to prevent the spread of invasive species. Development proposals must demonstrate implementation of recognised protocols such as ‘Check, Clean, Dry’ to minimise the risk of transferring invasive non-native species. This aligns with national biosecurity best practice and the increasing need to protect waterways and safeguard native biodiversity.

Comment

Greater Cambridge Local Plan: Proposed Submission

Policy BG/RC: River corridors

Representation ID: 214659

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

We believe this policy to be sound as it pertains to water quality.

Comment

Greater Cambridge Local Plan: Proposed Submission

Policy CC/CE: Supporting a circular economy and sustainable resource use

Representation ID: 214660

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

Waste Management

We welcome the reference to CL:AIRE Definition of Waste Development Industry Code of Practice (DoWCoP) in Policy CC/CE: Supporting a circular economy and sustainable resource use, Operational waste management point 8.

Comment

Greater Cambridge Local Plan: Proposed Submission

Policy CC/FM: Managing flood risk

Representation ID: 214661

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

You may wish to further define what is considered as safe access, change the hights for floor levels and that reference is made to the need for development proposals in flood risk areas

Support

Greater Cambridge Local Plan: Proposed Submission

Policy CC/IW: Integrated water management, sustainable drainage and water quality

Representation ID: 214662

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

SuDS should be considered at an early stage

Support

Greater Cambridge Local Plan: Proposed Submission

Policy CC/WE: Water efficiency in new developments

Representation ID: 214663

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

The area covered by this Local Plan is defined as being in an area of serious water stress including progress against key strategic supply schemes and demand management measures, will therefore be important to ensure that the assumptions underpinning the Local Plan remain valid.

Comment

Greater Cambridge Local Plan: Proposed Submission

Chapter 10: Infrastructure

Representation ID: 214665

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

We have engaged with yourselves and your consultants on the WCS evidence base. We previously, recommended that more detailed assessment be included in an updated detailed WCS. We will continue to review and update these statements regularly, as well as consider the need for position statements in other WWTW catchments, as our understanding of available information and evidence evolves.

Comment

Greater Cambridge Local Plan: Proposed Submission

Policy I/AD: Aviation development

Representation ID: 214666

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

Land contamination should be considered, particularly PFAS contamination as a major potential risk to the groundwater environment.

Comment

Greater Cambridge Local Plan: Proposed Submission

Policy I/ID: Infrastructure and delivery

Representation ID: 214667

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

we recommend that the plan is updated throughout the lifetime of the Local Plan Period to ensure assumptions around delivery of wastewater infrastructure are still valid.

the plan places heavy reliance on Anglian Water Services’ (AWS’) next Drainage and Wastewater Management Plan (DWMP) (2030-2055) to deliver the required infrastructure upgrades needed to meet the planned growth.

Concerning Uttons Drove, which is listed as a Critical Priority in Table 8-1 (Summary of Strategic Wastewater Projects): The Greater Cambridge Integrated Water Management Study – Detailed Water Cycle Study (October 2025) sets out that Uttons Drove is already exceeding its permitted Dry Weather Flow.

Comment

Greater Cambridge Local Plan: Proposed Submission

Policy I/EI: Energy infrastructure masterplanning

Representation ID: 214668

Received: 25/09/2026

Respondent: Environment Agency

Representation Summary:

Policy I/EI: mentions the possibility of battery storage facilities. There is potential for pollution of the water environment in the case of emergency situations. Highly polluting chemicals in batteries could present risks to groundwater and surface water. We recommend that the policy requires that applicants should ensure mitigation is in place for containment and propose appropriate mitigation measures.

For instructions on how to use the system and make comments, please see our help guide.