Greater Cambridge Local Plan: Proposed Submission

Search representations

Results for Hobson's Conduit Trust search

New search New search

Object

Greater Cambridge Local Plan: Proposed Submission

Chapter 4: Climate change

Representation ID: 213008

Received: 24/09/2026

Respondent: Hobson's Conduit Trust

Legally compliant? Yes

Sound? No

Representation Summary:

The plan is unsound because development envisaged is not made conditional on the delivery of water supplies from Grafham Water (2032?) and the Chatteris (Fens) Reservoir (2016?). Water targets for housing require changes in national legislation and regulations.

The plan is also unsound because at Policy S/CBC 22 c. an attempt is made to make occupation of any major development on Phases 3 and 4 of the Biomedical Campus conditional upon CSET Phase 2 scheme being in place. This is wrong. The CSET Phase 2 scheme as proposed is not located to conveniently serve Phases 3 or 4.

For instructions on how to use the system and make comments, please see our help guide.