Greater Cambridge Local Plan: Proposed Submission
Search representations
Results for Cambridge Past, Present and Future search
New searchObject
Greater Cambridge Local Plan: Proposed Submission
Policy J/VA: Visitor accommodation, attractions and facilities
Representation ID: 212674
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
Legally compliant? Yes
Sound? No
CPPF finds Policy J/VA unsound, ineffective, unjustified, and inconsistent with national policy. It lacks a comprehensive tourism strategy, day-visitor forecasts, or carrying-capacity evaluations for central Cambridge. Unmanaged tourism and day-visitor traffic exacerbate city centre congestion, degrading the public realm, community well-being, and overall liveability necessary to attract global innovation talent. CPPF proposes commissioning a visitor capacity study, requiring pedestrian management and spatial routing, investigating local funding tools like visitor levies for street maintenance, and reframing policy criteria to protect town centre liveability and residential amenity.
Support
Greater Cambridge Local Plan: Proposed Submission
Policy WS/PH: Public houses
Representation ID: 212692
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
CPPF strongly supports Policy SW/PH for its robust protection of public houses across Greater Cambridge. Public houses act as essential social, historical, and architectural anchors in urban and rural communities. They preserve tangible links to local land-use history and heritage while serving as landmark structures that define streetscape character and distinctiveness. Beyond their architectural value, pub spaces foster critical community interaction and local identity. CPPF endorses the policy’s strict criteria, which prevent unjustified loss or insensitive redevelopment by requiring rigorous justification and proof of non-viability before any public house can be lost.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy I/ST: Sustainable transport and connectivity
Representation ID: 212701
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
Legally compliant? Yes
Sound? No
CPPF considers Policy I/ST unsound, ineffective, unjustified, and inconsistent with national policy. The policy references vehicular trip budgets without operational mechanics, monitoring frameworks, or legal enforcement. Subjective terminology creates developer uncertainty and land overvaluation, risking sustainable infrastructure delivery during viability assessments. Furthermore, the policy fails to mandate mode-shifting ahead of road capacity expansion and uses disjunctive phrasing ("or") instead of combining sustainable measures. CPPF proposes establishing a standardised trip budget and monitoring framework, defining objective standards (e.g., 400m walking distance to transit), citing Healthy Streets Indicators, enforcing combined transport packages, and prioritising mode-shift over road expansion.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy I/MH: Mobility Hub facilities
Representation ID: 212703
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
Legally compliant? Yes
Sound? No
CPPF considers Policy I/MH unsound, unjustified, and ineffective due to internal policy contradictions and loose parking criteria. A conflict exists between the Glossary—which explicitly excludes private car parking from mobility hubs—and Policy I/MH's supporting text, which conflates hubs with major Park & Ride car parks. Furthermore, allowing parking "only as necessary" lacks scale limits or thresholds, permitting unbounded surface parking under the guise of modal interchange. CPPF proposes aligning the Glossary with policy text, distinguishing local hubs from strategic Park & Rides, clarifying drop-off terminology, and requiring car parking to reflect a demonstrated, assessed transportation need.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy I/EI: Energy infrastructure masterplanning
Representation ID: 212705
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
Legally compliant? Yes
Sound? No
CPPF finds Policy I/IE unsound, ineffective, and not positively prepared for failing to make spatial provision for high-voltage grid connections required by the region's academic and commercial R&D sectors. Rapid AI integration, data centres, and advanced laboratories exponentially increase baseline energy demands. Heavy reliance on a single connection at Burwell creates network capacity constraints and severe single-point-of-failure risks for mission-critical research. CPPF proposes amending Policy I/IE to explicitly acknowledge the high power density demands of AI and R&D clusters, and providing explicit policy support and criteria for delivering an additional National Grid connection point in South Cambridgeshire.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy S/PRIA/OPML: Old Press/Mill Lane
Representation ID: 212726
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
Legally compliant? Yes
Sound? No
CPPF objects to Policy S/PRIA/OPML due to internal policy conflict regarding the non-designated heritage asset (the historic mill/warehouse building) on the eastern side of Mill Pond. While Clauses 1a and 1b rightly support heritage-led enhancement, Clause 1d is ambiguously drafted and could be interpreted to justify the demolition of the mill/warehouse to create open space. This building is a vital reminder of Cambridge’s waterborne trading history, groups with the Anchor PH, and contributes significantly to the setting of Queen’s College, King’s College Chapel, and Coe Fen. The policy is unsound as it is not justified or effective.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy S/C/OPM: Old Press/Mill Lane
Representation ID: 212729
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
Legally compliant? Yes
Sound? No
Policy S/COPM is unsound as drafted due to what appears to be a drafting error. The policy appears to incorrectly includes requirements for an all-weather astro pitch, four tennis courts, a MUGA, Community Use Agreements, and school privacy/noise mitigations. These criteria do not relate to the dense, historic Old Press / Mill Lane site in central Cambridge and have clearly been erroneously copied over from another policy. The policy is not justified or effective. Sub-clauses b–e must be deleted and replaced with site-appropriate parameters focusing on heritage, university redevelopment, and public realm
Support
Greater Cambridge Local Plan: Proposed Submission
Policy BG/BG: Biodiversity and geodiversity
Representation ID: 212732
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
CPPF strongly supports Policy BG/BG as sound, positively prepared, justified, effective, and consistent with NPPF Paragraphs 187 and 192. It endorses the 20% Biodiversity Net Gain (BNG) requirement for major developments to address severe local nature depletion and align with the Local Nature Recovery Strategy. The policy is backed by viability evidence. CPPF commends targeted protections for Natural England Impact Risk Zones and Important Invertebrate Areas, alongside mandatory integrated nesting features (swift bricks/bat boxes) and long-term management regimes to secure enduring ecological restoration across Greater Cambridge
Object
Greater Cambridge Local Plan: Proposed Submission
Policy BG/GI: Green infrastructure
Representation ID: 212734
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
Legally compliant? Yes
Sound? No
CPPF considers Policy BG/GI unsound due to failing the effectiveness test. It relies on delivering 14 strategic green infrastructure (GI) initiatives—including the Cambridge Nature Network—without securing necessary land via allocations or policy mechanisms. Off-site developer contributions fail when land is unavailable due to inflated speculative values. Delivering major growth without precursor GI risks over-burdening existing protected sites. CPPF proposes allocating strategic GI land, introducing enabling development policies, establishing a dedicated land acquisition fund, and publishing an evidence-based GI Delivery Strategy demonstrating landowner willingness and realistic delivery timelines.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy BG/UGF: Urban greening factor
Representation ID: 212737
Received: 23/09/2026
Respondent: Cambridge Past, Present and Future
Legally compliant? Yes
Sound? No
CPPF supports introducing an Urban Greening Factor (UGF) but considers Policy BG/UGF unsound due to an unevidenced exemption in Clause 1c. Waiving the 0.5 UGF standard for major developments outside Cambridge where accessible greenspace exceeds 50% creates an ambiguous loophole. Large open spaces do not replace integrating nature-based solutions—such as green roofs, rain gardens, and street trees—within built residential fabric. Bypassing urban greening risks increased surface water run-off and heat stress. CPPF proposes removing Clause 1c's exemption and applying UGF targets directly to built areas regardless of adjoining open space.