Full text:
These representations are submitted by David Lock Associates on behalf of Urban&Civic (U&C). U&C now own the Barracks and Airfield site at Waterbeach, which
forms the major part of the Waterbeach New Town allocation. Prior to the purchase of the site U&C were development partner to the previous owners, the Defence
Infrastructure Organisation.
As master developer, U&C are delivering the redevelopment of the Barracks and Airfield,
primarily under Outline Planning Permission S/0559/17/OL (The OPP) (dated 25 September 2019). Outline Planning Permission for redevelopment is also in place on
the remaining part of the allocation, in separate ownership.
U&C is proud of the progress made in delivering Waterbeach New Town and remains fully committed to realising its long-term vision.
The emerging Local Plan still has a very important role to play in this endeavour. The new Plan provides a vital driver. While the principle of the development is established and embedded in extant outline planning permissions across the whole site, there remain some significant challenges to accelerating delivery and achieving full build-out.
U&C very much appreciate the further evolution of the Waterbeach Policy since Regulation 18 and the proactive engagement of officers to clarify and update the Policy.
U&C does broadly support the Policy, but submits objections on a number of detailed points, where the Policy is not clear in relation to what is expected, or inaccurate, or risks ambiguity to the extent of misinforming those less familiar with the details of the planning position.
U&C remain hopeful that many, if not all, of these issues can be resolved through further engagement with officers in advance of Examination.
The Policy and supporting text do not acknowledge that the entirety of the Waterbeach New Town Allocation is now subject to Outline Planning Permissions for development, under which implementation is progressing.
In the case of other allocations in the Local Plan, where comparable permissions are already in place, such as Hinxton Genome Campus, this important context is very clearly set out in the text accompanying the Policy. The drafting of this Policy rather implies that an outline planning permission is still to be granted or that permissions are partial. For example, paragraph 3.382 includes reference to matters that are ‘to be secured under
S106 Agreement’ in circumstances where those matters are very much already secured under the existing permissions.
This context is especially important because the extant planning permissions are not entirely consistent with the emerging Policy and cannot be retrospectively amended to be so. The Policy will be relevant to future reserved matters applications or, should it ever be necessary, different outline planning applications. However, for now,
development is progressing under the extant outline planning permissions. Accordingly, matters such as viability, infrastructure funding, Section 106 obligations, subsequent planning requirements and practical delivery considerations are governed by those
permissions.
Either the Policy needs to reflect what is permitted, or there needs to be a clear explanation that the development is progressing under extant outline planning
permissions.
Part 8a of the policy indicates that Waterbeach is ‘allocated for’ a range of uses. In principle, this is acceptable: a site can be allocated for a wide range of uses, and subsequent Planning Applications then address what is to be delivered, which may be some or all of what the Policy permits.
The issue with the drafting as it stands is that the Policy expresses key land use requirements (homes, employment and retail) as ‘approximate’ amounts and, in the case of homes, includes precise details, which, as explained in the supporting text, are now defined as requirements; specifically, 24 Gypsy and Traveller Pitches and 1050 units of specialist accommodation.
The current relevant Outline Planning Permissions express land use requirements as maxima and set ‘up to’ limits. Some uses are defined and required (not least those that are subject to obligations, such as schools); others represent ‘opportunity’ that may or may not be delivered in full or may fall short of the ceiling figures. The amount of employment or retail floorspace will, for example, depend entirely upon demand. The degree to which priority is afforded to housing delivery is also important.
Policy Part 9 states that ‘the above use will need to be delivered in a timely way’, which establishes an expectation that the uses will all be delivered, give or take a margin that is reflective of an ‘approximate’ figure. This is not the case and not the basis on which the OPPs have been granted. U&C are strongly of the opinion that clarification is needed to ensure that this does not create false expectations or misunderstandings.
U&C and its partners have delivered specialist key worker accommodation for nurses on site and affordable homes, alongside market homes. The precise composition of the
residential provision is not defined. However, in the relevant Outline Planning Permission, it is for determination phase by phase, in response to the Applicant’s proposal and the Policy in the Adopted Local Plan. The only Outline Planning Permission obligations are to deliver affordable housing and a minimum quantity (5%) of accessible homes: these requirements are fully factored into viability and the U&C delivery plans.
A precise quantity of Gypsy & Traveller and a precise quantity of specialist accommodation is not an obligation under the Outline Planning Permission, and was not
a requirement under the extant South Cambridgeshire Local Plan Policy or the Waterbeach SPD in place at the time the Outline Planning Permission was granted.
Gypsy & Traveller pitches are not expressly permitted under the OPP. Neither, for that matter, are other uses now included in this Policy, such as burial space. The Local Plan does not demonstrate that these requirements are now deliverable.
U&C can bring forward a range of dwelling types and tenures under the Outline Planning Permission and are working with the local planning authority to achieve a broad mix including specialist housing where delivery partners can be identified, and viability permits; U&C are not obligated or working towards a target number of specialist units, delivery of all types of housing or Gypsy & Traveller pitches. The SPD did not address how or where Gypsy & Traveller pitches might be accommodated on site, and the use has not been factored into parameter plans or subsequent more detailed plans. It is not easy to incorporate this need now, especially given the ‘edge’ location requirement. As the supporting text to the proposed Policy H/GT states: ‘New communities that
accommodate Gypsies and Travellers and the settled community from their conception allows for the different land uses to be considered in a co-ordinated and integrated manner through the masterplanning and design process.’ This did not happen as the Waterbeach proposals were shaped, as there was no requirement for it to happen.
Waterbeach is now significantly beyond the point of ‘conception’, and it is not possible to revert to reshape development that is in progress.
Directing any residential (Use Class C3) housing land to Gypsy and Traveller use will reduce the number of dwellings delivered against the 6,500 dwelling allocation. To maintain viability and the current Affordable Housing commitment, which remains below policy target, development land could only now be reassigned to uses not currently permitted, at greater than market residential land value, to redress the loss of land for market and affordable homes. This is not an approach which U&C is willing to support.
Policy Part 10 is generally supported, subject to two further proposed amendments:
Policy Part 10d -
Runway Park is not a historic feature – it is a linear area of grass, alongside the former runway that is proposed for amenity, as a green corridor: it is a feature of the proposals coming forward, not an asset to be protected.
Policy Part 10g -
Reference to ‘village’ does not make sense – the SEA is related directly to, and north of, the Town; it is not related to the existing village, so it is not protecting ‘village character’.
Policy Part 12 -
It is not entirely clear what is meant by ‘built form’ being in accordance with the indicative Spatial Framework diagram. The diagram does not show built form. We assume the intention is to limit the built development area and suggest drafting that would correspond to this, as long as it can be suitably keyed on the Spatial Framework Plan.
Policy Part 17 -
A minor addition to this section has been suggested to reflect the fact that not all features on the site can be retained or make a positive contribution. Recent practical
experience of seeking to maintain plantation trees on site is a good example of where maintaining older, lower-quality stock is not successful, and new planting is preferable.
Policy Part 22 -
It would be helpful to have greater consistency between the text and Spatial Framework Plan with regard to the location of park and ride, mobility hubs and a full multi-modal interchange at the proposed new Station. The Plan uses a symbol that combines all these elements together.
Policy Part 22a -
This is related to design on site, so (i) should refer to ‘town’, not ‘village’.
Policy Part 23 -
Refers to an ‘agreed master plan’ and the need for a ‘transport mitigation plan’. It is not clear if either of these things exist at present. The Waterbeach SPD provides an
overarching form of master plan – is this what is being referred to?
With regard to transport, the OPP establishes a bespoke ‘monitor and manage’ based mechanism for transport mitigation. It is not clear whether this is still aligned with the ‘strategic and local transport mitigation plan’ referred to in the emerging Policy. If the policy is signalling something new/different in relation to a master plan and transport mitigation plan, it should be clear in what circumstances these are required and how they differ to that which is already in place and guiding delivery. It should only apply in circumstances where the mitigation approach is not already settled. Otherwise, it is
unclear how and when an applicant should respond to this Policy requirement.
Policy Part 26 -
A minor correction is suggested to reflect that not all development is subject to design code requirements and that Reserved Matters Approvals (RMAs) are the primary
determinant of delivery.
Indicative Spatial Framework Plan for Waterbeach New Town
The status of this Plan remains somewhat unclear, but U&C welcome the fact that it is now more closely aligned with the existing SPD and Outline Planning Permissions. To better align with the drafting of the Built Development, it would be beneficial if the yellow area was labelled as the ‘Area for Built Development’. Simplification means that
important distinctions are lost, such as the difference between a small mobility hub at the northern entrance and a major interchange at the station (both have the same labelling). It is important that there is clarification somewhere in the Plan that these Diagrams are high-level and indicative or the plan needs a further level of granularity to be accurate.