Policy J/AW: Affordable workspace and creative industries
Representation ID: 213649
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
Policy J/AW sets out stringent requirements, yet the evidence base does not demonstrate why these requirements are appropriate for Greater Cambridge. The policy relies heavily on London comparators despite materially different market conditions and does not adequately assess reasonable alternatives such as higher thresholds, fixed-term affordability periods or more flexible viability-led approaches. The accompanying Viability Representations (Bidwells, Sept 2026) identify significant flaws in the LPA Viability Assessment, which when combined with the cumulative impact of other planning obligations, raise serious doubts over the delivery of office, laboratory, R&D and industrial floorspace that underpins Greater Cambridge's economic growth ambitions.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy S/AMC/NEC: North East Cambridge Area of Major Change
Representation ID: 213655
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
Stanhope support the ambition expressed by S/AMC/NEC but it is often seeking too much from all developments across the whole of NEC with several requirements unachievable for smaller scale developments. Additional wording should be added to Criterions 3,16, 19 and 20 to state these requirements should be met “where relevant and appropriate”. There is also a lack of clarity and flexibility provided around the “agreed NEC trip budget” in Criterion 17(a) should be amended to ensure it remains relevant and applicable for the whole plan period.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy CC/DC: Designing for a changing climate
Representation ID: 213672
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
Stanhope objects to this policy because it does not adequately recognise the specialist operational and technical requirements of R&D and laboratory uses. In particular, Criterion (d), is overly prescriptive and may constrain the appropriate design and operation of specialist R&D development. The Policy requires balance; sustainability is of great important, but equally the economic, environmental and social benefits of a scheme are of equal importance.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy CC/NZ: Net zero carbon new buildings
Representation ID: 213683
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
Parts A and B impose energy performance standards that significantly exceed national requirements, including Passivhaus and LETI Net Zero benchmarks. While ambitious, these targets risk increasing costs and technical constraints for developers. The requirement for CIBSE TM54 modelling may also duplicate existing energy assessments. The policy lacks robust evidence demonstrating that these standards are deliverable, viable, and will not adversely affect housing supply. In light of PM13 of the NPPF (2026), any standards exceeding national requirements should be fully justified. The policy should therefore be revised to align with national standards and adopt a proportionate, evidence-based approach.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy GP/ST: Skyline and tall buildings
Representation ID: 213690
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
GP/ST is overly restrictive and lacking flexibility, particularly in its approach to tall buildings. While building height should be assessed carefully, taller buildings can support commercial growth, intensification and efficient use of constrained sites in appropriate locations. GP/ST should be amended to recognise that, in appropriate locations, taller buildings can make a positive contribution to sustainable development and economic growth. Criterion e’s requirement to demonstrate “no adverse impact” on neighbouring buildings and open space is unreasonable, as some impacts are inherent to development and should be balanced against benefits; the wording must be changed to “no unacceptable impact” instead.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy BG/BG: Biodiversity and geodiversity
Representation ID: 213700
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
The proposed requirement for 20% Biodiversity Net Gain (BNG) on major development is unsound as it is not sufficiently justified, evidenced or demonstrated to be deliverable. The Environment Act 2021 establishes a clear statutory requirement for 10% BNG, and there is no compelling evidence within the Plan evidence base to justify a blanket increase to 20%. Furthermore, it is unclear whether the viability implications of a 20% requirement have been adequately assessed alongside other policy costs. The policy should therefore be amended to require qualifying development to achieve the statutory minimum 10% BNG in accordance with national legislation.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy BG/EO: Providing and enhancing open spaces
Representation ID: 213717
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
Stanhope supports the principle of enhancing open space but objects to the prescriptive approach to commercial development. Criterion 4’s requirement for developments over 2,000sqm GIA to provide 2.0 hectares of open space per 1,000 employees is considered overly rigid, particularly for constrained urban sites. BG/EO doesn't adequately account for existing open space provision such as at Cambridge Science Park, previously delivered green infrastructure, or alternative forms of amenity space. It also lacks clarity on how requirements apply to phased developments, creating uncertainty for planning and viability. Overall, the policy places an unnecessary burden on commercial development and sustainable economic growth.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy BG/UGF: Urban greening factor
Representation ID: 213721
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
Stanhope object to Policy BG/UGF, advocating for its total deletion from the Local Plan. Achieving 10% Biodiversity Net Gain under the Environment Act 2021 is already an effective, established measure for securing ecological enhancements on development sites. Adding a mandatory Urban Greening Factor target (e.g. 0.4 for residential developments) introduces an unnecessary, locally untested burden. There are serious viability concerns layered through the Plan, noting that the Local Plan Viability Assessment does not appear to evaluate the cumulative cost impact of UGF alongside extensive sustainability policies, making the policy unjustified and inconsistent with national policy.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy WS/NC: Meeting the needs of new and growing communities
Representation ID: 213740
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
Stanhope objects to Policy WS/NC because it places disproportionate obligations on commercial development, lacks certainty over infrastructure requirements, and may affect viability and delivery. Criterion 2 sets an unreasonably low 5,000sqm threshold, requiring developers to assess community needs without sufficient clarity on likely contributions. Criteria 6, 7 and 9 impose onerous and insufficiently justified requirements for community, cultural, sports and recreational facilities, without adequately considering existing provision or actual demand. Criterion 11 lacks clarity on the timing of infrastructure delivery and should allow delivery to be determined case-by-case based on development scale and phasing.
Object
Greater Cambridge Local Plan: Proposed Submission
Policy CC/CE: Supporting a circular economy and sustainable resource use
Representation ID: 213746
Received: 25/09/2026
Respondent: Stanhope PLC
Agent: Bidwells
Legally compliant? Yes
Sound? No
The policy contains several requirements that are insufficiently justified, inconsistent with national policy, and risk placing unnecessary burdens on development. The requirement to reduce embodied carbon lacks clear parameters, creating uncertainty over implementation and viability. Requiring full justification of demolition conflicts with permitted development provisions and places excessive weight on carbon considerations beyond NPPF requirements. Embodied carbon should be considered alongside other material planning considerations, instead of as a determining factor. Mandatory submission of Circular Economy Statements for larger residential schemes is onerous and exceeds national information requirements. CC/CE should therefore be amended to provide greater flexibility and consistency.