Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/JH: New jobs and homes

Representation ID: 213478

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

CEG LP welcomes the consideration of the ‘high’ (or indeed, even higher) economic growth scenarios within the evidence base because economic growth is clearly an important factor in plan-making in Greater Cambridge and it is crucial that this is supported by commensurate housing and infrastructure growth.

For the ‘high’ scenario the labour-demand floorspace need is for 328,000sqm, 543,000sqm and 150,500sqm for each sector respectively. This shows that the amount of R&D floorspace being planned for exceeds the amount needed based on labour-demand under even the ‘high’ scenario.

This shows that based on GCSP Service’s own evidence, it is planning for a level of employment growth which substantially exceeds its ‘central’ scenario and which forms the basis of the housing requirement.

Whilst there is some flexibility also built into GCSP Services' housing supply, it would still fall short of the housing need under the ‘high’ economic growth scenario by around 7,400 homes over the plan period.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/DS: Development strategy

Representation ID: 213480

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

CEG LP considers that the approach to discounting sites based on Green Belt constraints has significantly hindered the plan’s ability to take advantage of the most sustainable development opportunities. The approach to Green Belt release represents a frustrating lack of ambition by Greater Cambridge, which, whilst recognising that all of this development is helpful for the continued growth of the Biomedical Campus, has not resulted in opening up the area to the expansion and development of other technology parks such as Peterhouse and Fulbourn Technology Parks. It is also evident that most sustainable methods of travel to work arise when people are close enough to walk/cycle. It is logical that the co-location of housing and employment will lead to the most sustainable outcomes. Placing more housing and employment in edge of centre locations is most likely to produce the most sustainable live-work patterns.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/GB: The Cambridge Green Belt

Representation ID: 213484

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

It appears that the policy is deliberately seeking to constrain the operation of national grey belt policy in a way that is not consistent with the NPPF. The evidence base for the dGCLP (Reg 19) as it relates to the Green Belt, is entirely predicated on the ‘three Cambridge Green Belt purposes’. Whilst there are similarities with parts a) to c) above with purposes a), b) and d) of the NPPF (2024) para 143, they are not consistent and go beyond what national policy is seeking to achieve. On this basis, the policy is unsound because it is not consistent with national policy as required by NPPF paragraph 36d).

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 213487

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. The GCSP Service’s total identified housing supply amounts to 52,032 homes, giving only an 8.2% buffer above the minimum requirement of 48,069 dwellings set out in Policy S/JH (which CEG LP has objected to). As a point of principle, 8.2% is unlikely to provide sufficient headroom to ensure delivery of the housing requirement. This is particularly relevant in the context that on adoption, this plan will have to adhere to the NPPF 2026 in setting out its 5YHLS position, which no longer allows for an inclusion of windfall sites, meaning an even greater buffer on larger-scale sites supply is required in order to be able demonstrate a 5YHLS.

Object

Greater Cambridge Local Plan: Proposed Submission

Chapter 2: Development strategy

Representation ID: 213489

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to a site submission (HELAA ref 40058b; 200790; 200795).

As part of an updated call for sites submission in March 2025 three individual sub-parcels within the site were submitted. Careful consideration was given to each and their extent reflected advice on parcels within the wider land holding which could be suitable for development in landscape terms and meet the definition of Grey Belt, thereby addressing the alleged harms to the purposes of the Green Belt.

The parcels are:
• Southern extension to Peterhouse College (A southern expansion to previously released Green Belt sites GB3/GB4) (HELAA Site ID 200790);
• Southern extension to Employment site E/3 (HELAA Site ID 200795, which incorrectly merges it with Site ID 200790 above); and
• An easterly expansion to the previously released Green Belt site GB1 (HELAA Site ID 40058b).

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/GB: The Cambridge Green Belt

Representation ID: 214010

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:


CEG LP is also mindful of the publication of the NPPF (August 2026) and the requirements at Annex A paragraphs 4 and 8 whereby this local plan will be examined under the NPPF (2024). However, the application of the NPPF (2026) will apply for decision-making purposes immediately, and therefore there are some elements of this policy that will ultimately be superseded on adoption. This will be the case for Policy S/GB because it states new development in the Green Belt will only be approved in accordance with Green Belt policy in the NPPF and having regard to the Cambridge Green Belt purposes. This is materially inconsistent with NPPF (2026) GB7, especially as it conflicts with purpose b) and further expands on what the NPPF states with regards to purpose d).

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214011

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. It is noted that the GCSP Service has sought to apply the ‘Liverpool’ method to its 5YHLS calculation, having the effect of offsetting shortfalls in delivery against the latest (2026) standard method over the whole plan period from adoption (in 2028), rather than over the five-year period only (the ‘Sedgefield’ method). The GCSP Service admits that using an alternative approach would have led to only being able to demonstrate a marginal (5.03 years) 5YHLS on adoption of the plan in 2028. The 5.47 years’ supply on adoption considered a tentative position which carries significant risk of being challenged when considered in the context of its optimistic assumptions about the future deliverability of allocated sites and inclusion of a windfall allowance.

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214012

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. Given that windfall sites account for 425 homes per annum in the trajectory, this would remove 2,125 homes from supply in a given five-year period. The effects of such a reduction in assumed supply means the Council would be unable to demonstrate a 5YHLS until 2036/37 based on the scenarios presented in the table at A.2 of the HDSA 2026. Even if assuming that a 425 home-per-annum windfall supply were forthcoming on specific sites for the first three years of a given 5YHLS period, this would still amount to an 850-unit reduction in assumed supply over a given five-year period which GCSP will need to make up for as a matter of urgency if the plan is to be effective and the presumptions at NPPF 2026 policies S5(1)(j) or GB7(1)(g) avoided. On the basis of the above, the proposed trajectory would not be effective in maintaining a supply of deliverable housing sites and is not sound with reference to NPPF 2024 paragraph 36(c).

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214013

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. The HDSA 2026 suggests that comparatively low delivery in the earlier years of the plan as sites tend to need the Local Plan to be adopted before they can come forward through the planning application process and can be delivered. Whilst this principle is not necessarily disputed, this assumption appears to have been carried through to assume a four-year lead-in time from adoption of the plan to completions on as many as eight newly-allocated sites in 2032/33 totalling 655 units: 56% of the total amount of anticipated oversupply in the whole 2028/29 to 2032/33 period. This is highly ambitious and demonstrates further the precarity upon which any future 5YHLS position rests (notwithstanding that one is unlikely upon adoption).

Object

Greater Cambridge Local Plan: Proposed Submission

Appendices

Representation ID: 214014

Received: 25/09/2026

Respondent: CEG Land Promotions Limited

Agent: Lichfields

Legally compliant? Yes

Sound? No

Representation Summary:

This representation relates to Appendix D - Housing trajectory and five-year housing land supply calculation. CEG LP has more general concerns around the extent to which the housing trajectory can be relied upon as a forecast of supply in Greater Cambridge. the HDSA fails to acknowledge the significant variations in market fragments around Greater Cambridge, and the impact this has on deliverability of sites, particularly when there is a blanket affordable housing policy across the whole area. The HDSA fails to acknowledge the decline in market absorption rates referred to, which is in-turn slowing down market housing delivery. On this basis, CEG LP’s view is that despite the additional evidence submitted, the fast lead-in times and the high build out rates of a number of the large-scale allocations are plainly unrealistic and therefore should be tempered.