Greater Cambridge Local Plan: Proposed Submission

Search representations

Results for Haslingfield Parish Council search

New search New search

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/RE: Renewable energy projects and infrastructure

Representation ID: 213716

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

Point 1(d) and paragraph 4.48 inaccurately treat renewable development on agricultural land as an inherent negative trade-off requiring "significant sustainability benefits" to outweigh the loss. This understates real-world evidence: dual-use schemes can actively improve crop yields in hot/dry conditions, enhance livestock welfare through shading, and deliver genuine biodiversity gains (e.g., 41% increases in Suffolk Wildlife Trust studies). Dr Jonathan Scurlock, the NFU's Chief Adviser for Renewable Energy, has stated in his professional capacity that the NFU encourages multi-purpose land use.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/FM: Managing flood risk

Representation ID: 213718

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

Point 1 is not consistent with national policy because it universally applies the sequential test to "change of use" applications. NPPF (2024) paragraph 176 and Footnote 62 explicitly exempt most changes of use and householder extensions from this test. While some changes (e.g., basement care homes) do increase flood risk, the Regulation 19 text fails to reflect the targeted approach recommended by the Environment Agency, resulting in sweeping inconsistency.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/IW: Integrated water management, sustainable drainage and water quality

Representation ID: 213720

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

Point 6(a) is not positively prepared or effective because it conflates securing a water connection with demonstrating actual wastewater treatment capacity. Paragraph 4.36 states applicants need only "secure a connection" with Anglian Water. Since water companies have heavily restricted legal grounds to refuse connections, a connection agreement does not establish that treatment capacity exists when required. Given the Plan's scale of growth and acknowledged infrastructure constraints, relying on connection paperwork risks allocating and approving development without demonstrating that necessary wastewater infrastructure will be available to support sustainable development.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/WE: Water efficiency in new developments

Representation ID: 213724

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

This policy is not effective because point 1(a) mandates water reuse or recycling to achieve 80 l/p/d without any practicability fallback. The Drinking Water Inspectorate has actively blocked greywater recycling models locally at Eddington. While non-residential targets have an "unless demonstrated not practicable" test, residential schemes facing absolute regulatory roadblocks have no lawful route to compliance, making the policy undeliverable.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/NZ: Net zero carbon new buildings

Representation ID: 213729

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

The policy is not explicitly consistent with national policy. PM13 requires stricter local energy standards to be expressed as a percentage improvement on SAP "or other approved calculation methodology.". While we support the Plan's ambitious use of TM54/PHPP modelling over SAP (which only checks legal minimums), the Plan fails to explicitly categorize this modelling as an approved alternative. This leaves its compliance with PM13 implicit rather than explicit.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy CC/DC: Designing for a changing climate 

Representation ID: 213734

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

This policy is not effective because it lacks a maintenance mechanism for green infrastructure intended as overheating mitigation (e.g., green roofs, tree canopy). Mitigation delivered at construction often fails to persist; national data shows ~22% of saplings are lost to heat scorch and drought stress, meaning watering-only maintenance is insufficient. Furthermore, national policy (NPPF 182(c)) already acknowledges this gap by requiring maintenance arrangements for SuDS.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy BG/BG: Biodiversity and geodiversity

Representation ID: 213735

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

We strongly support this policy's ambition for a 20% biodiversity net gain for major development, which is well justified. However, this policy is not effective because paragraph 6 fails to specify how habitat enhancement measures will be monitored in practice, how frequently, by whom, or what enforcement action follows non-compliance. The Councils' reliance on after-the-fact reporting (such as the Biodiversity Duty report) does not address how non-delivery will be proactively caught or corrected, creating significant compliance risks.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy BG/GI: Green infrastructure

Representation ID: 213739

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

This policy is not effective because major infrastructure progressed outside the Local Plan can bypass and undermine its priorities. The Gog Magog Hills are a strategic green infrastructure priority, yet the proposed CSET busway threatens this area. The Councils assert CSET is outside Local Plan processes, reflecting a structural gap also seen with East West Rail. A policy cannot be effective if major infrastructure capable of undermining the Plan's own green priorities is completely outside its control.

Object

Greater Cambridge Local Plan: Proposed Submission

Policy BG/UGF: Urban greening factor

Representation ID: 213741

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

We support this policy, but it cannot be effective because green infrastructure delivered through the Urban Greening Factor relies entirely on the Operation and Maintenance Plan under paragraph 3. As raised regarding Policy BG/GI, this mechanism includes no provision for checking compliance and states no consequence for a failure to maintain the infrastructure. Without functional enforcement, the policy's aims are undermined

Object

Greater Cambridge Local Plan: Proposed Submission

Policy BG/TC: Tree cover and the tree population

Representation ID: 213745

Received: 25/09/2026

Respondent: Haslingfield Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

This policy is not effective as it fails to prevent pre-application clearance. Trees and hedgerows can be removed with no planning oversight simply by acting before an application is submitted. We are aware of local mature orchards pre-emptively felled prior to sale unrecorded. While Schedule 14 of the Environment Act 2021 allows setting the baseline at pre-degradation value, neither this policy nor BG/BG references how such evidence will be captured or applied locally.

For instructions on how to use the system and make comments, please see our help guide.