Greater Cambridge Local Plan: Proposed Submission

Search representations

Results for Horseheath Parish Council search

New search New search

Object

Greater Cambridge Local Plan: Proposed Submission

Chapter 1: About the Plan

Representation ID: 213191

Received: 24/09/2026

Respondent: Horseheath Parish Council

Legally compliant? Yes

Sound? No

Representation Summary:

There is one single issue which we believe undermines the utility of this plan; the situation with regard to regional water supplies. There is no detail or certainty with regard to these proposals; the pipeline from Graffam Water is not projected for completion until 2032 and details on available supply quantities are not provided. This lack of water impacts all policies, from mitigating climate change and biodiversity loss to proposals for the construction of new settlements. We believe the draft cannot be considered to have been positively prepared given the lack of a detailed and credible strategy to resolve the water scarcity issue which is apparent now but can only deteriorate in the intervening year. We remain very concerned about the impact on the local environment, most particularly the chalk streams. We remain very concerned about policies on water. We believe the ambition to reduce water use in larger new developments to 80L per person per day, whilst being noble is not evidence based. It is unlikely to be effective.

Attachments:

Object

Greater Cambridge Local Plan: Proposed Submission

Policy S/GF: Land adjacent to A11 and A1307 at Grange Farm

Representation ID: 213994

Received: 24/09/2026

Respondent: Horseheath Parish Council

Legally compliant? Not specified

Sound? Not specified

Representation Summary:

Policy S/GF – water is one of three major issues with this proposal, the others being traffic and transport and impact on the surrounding environment. The proposal is:
• Not positively prepared – this site will damage the village of Abington and the landscape; the strategy for water is dubious and there is no likelihood that necessary new access roads can be built within the plan period. There is no funding for the proposed bridge over A11 that would connect to the travel hub and biomedical facilities.
• Not justified – it would be cheaper and provide better access to both the transport network and biomedical campuses if a new village was constructed south west of Babraham, the other side of A11. This would reduce impact on A1307 and provide better traffic flows.
• Not Effective – Given the infrastructure uncertainties there is no evidence this site could deliver the required contribution to housing and commercial development targets required.
A sensitive site such as this should have a credible costed and integrated infrastructure plan supporting the initial proposals; without this policy cannot be supported.

Attachments: