Draft Greater Cambridge Local Plan for consultation

Search representations

Results for Northstowe Town Council search

New search New search

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/NST: Northstowe New Town

Representation ID: 208072

Received: 29/01/2026

Respondent: Northstowe Town Council

Representation Summary:

3.3.69. 69.f. The AAP demanded 12 months subsidised/free bus travel, so this text is a significant weakening of that. In any case, this was not made available to later residents. We believe that no such subsidy exists currently. In fact, bus journeys boarded within Northstowe are priced higher than the same buses being boarded in adjacent settlements. This discourages use of public transport and locks-in private car use for Northstowe residents.

Full text:

Please see attached Northstowe Town Council's response to the Draft Greater Cambridge Local Plan.

Attachments:

Comment

Draft Greater Cambridge Local Plan for consultation

Policy I/ID: Infrastructure and delivery

Representation ID: 208073

Received: 29/01/2026

Respondent: Northstowe Town Council

Representation Summary:

13.2.1. "Facilities such as [...] Northstowe Community Centre offer integrated services, including libraries, leisure, health, and Early Years provision." We do not recognise this description. We note that all parties are currently in default of a S106 obligation providing for health and library facilities in Northstowe.
15.2. We note that delivery of a Swimming Pool for Northstowe has been secured and are highly supportive of it being realised in line with the Phase 2 S106 agreement. We would welcome early engagement with SCDC as they form their strategy plan for delivery of essential infrastructure.

Full text:

Please see attached Northstowe Town Council's response to the Draft Greater Cambridge Local Plan.

Attachments:

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/JH: New jobs and homes

Representation ID: 208074

Received: 29/01/2026

Respondent: Northstowe Town Council

Representation Summary:

2.52 This strategy relies heavily on Northstowe continuing to deliver homes. That reliance must be matched by equally clear, binding infrastructure delivery mechanisms for items like public transport upgrades, social and civic facilities, and timely delivery of healthcare facilities as assured by S106 planning obligations. Past and current failure to deliver these in line with obligations already jeopardises Northstowe’s sustainability and ability to support future housing growth. The master developer must pursue a strategy that leads to timely, visible, and quality infrastructure delivery which - in conjunction with quality, affordable and desirable homes - will improve delivery rates.

Full text:

Please see attached Northstowe Town Council's response to the Draft Greater Cambridge Local Plan.

Attachments:

Comment

Draft Greater Cambridge Local Plan for consultation

Policy I/ST: Sustainable transport and connectivity

Representation ID: 208075

Received: 29/01/2026

Respondent: Northstowe Town Council

Representation Summary:

The A1307 was intended as a special road for HGV access only; using it for a site with significant HGV movements would conflict with vulnerable road users and the cycleway, so an alternative access arrangement is required for Slate Hall Farm. In addition, the continuity of the cycleway must be retained and protected to avoid loss of priority. Therefore, we would require alternative access arrangements to be made for any development on the Slate Hall Farm location.

Full text:

Please see attached Northstowe Town Council's response to the Draft Greater Cambridge Local Plan.

Attachments:

Comment

Draft Greater Cambridge Local Plan for consultation

Policy I/SD: Servicing and last-mile deliveries

Representation ID: 208076

Received: 29/01/2026

Respondent: Northstowe Town Council

Representation Summary:

Uses supporting local needs for “last mile” delivery should be prioritised: A typical last-mile delivery to the Greater Cambridge area is currently served from a hub in Peterborough 33 miles away. Serving these from a more local hub would reduce traffic movements when viewed as a whole.

Full text:

Please see attached Northstowe Town Council's response to the Draft Greater Cambridge Local Plan.

Attachments:

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/SHF: Land north of A1307, Bar Hill (Slate Hall Farm)

Representation ID: 210842

Received: 29/01/2026

Respondent: Northstowe Town Council

Representation Summary:

Drainage: The applicant for one of these sites attended a meeting of our planning committee, and it became clear that the official government “Flood map for planning” does not account for the flood protection measures provided for Longstanton during the Northstowe development (aka the Hatton Road ponds). It is essential and mandatory for any developments upstream of this to be designed and considered only against accurate and up-to-date hydrological information.

Full text:

Please see attached Northstowe Town Council's response to the Draft Greater Cambridge Local Plan.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.