Draft Greater Cambridge Local Plan for consultation

Search representations

Results for Cambridge Junction search

New search New search

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/C/CJ: Cambridge Junction and Cambridge Leisure, Hills Road

Representation ID: 202291

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Cambridge Junction in asking that (supported by Theatres Trust):
temporary provision for all cultural functions must be secured before any demolition or displacement
reprovision is delivered as an early phase; no gap in provision
any future Junction is at least equivalent in standard and capacity, including audience, back-of-house, technical capability, servicing
long-term operational/financial viability assessed alongside spatial design
delivery governed through a structured process (CJ/Council governance, RIBA stages, shared brief before developer engagement)
Agent of Change applied so residential development doesn’t restrict Junction operations
I cannot support this allocation unless continuity, equivalence and viable delivery mechanisms are secured.

Full text:

I support Cambridge Junction in asking that (supported by Theatres Trust):
temporary provision for all cultural functions must be secured before any demolition or displacement
reprovision is delivered as an early phase; no gap in provision
any future Junction is at least equivalent in standard and capacity, including audience, back-of-house, technical capability, servicing
long-term operational/financial viability assessed alongside spatial design
delivery governed through a structured process (CJ/Council governance, RIBA stages, shared brief before developer engagement)
Agent of Change applied so residential development doesn’t restrict Junction operations
I cannot support this allocation unless continuity, equivalence and viable delivery mechanisms are secured.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy WS/CH: Cultural and creative hubs

Representation ID: 202295

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Cambridge Junction in asking that:
operational sustainability (management, revenue, long-term viability) is explicitly required alongside spatial and design briefs
flexibility is embedded to allow culture to evolve over time
stronger links are made to delivery mechanisms, including the Cultural Infrastructure Strategy and partnership models
This ensures cultural hubs are viable, adaptable and resilient.
I support Create Cambridge in asking that:
the Agent of Change principle is explicitly embedded, placing responsibility for mitigation on new residential development, not existing venues
major developments demonstrate equitable access, including late-evening public transport, so hubs serve the wider region, not only immediate residents

Full text:

I support Cambridge Junction in asking that:
operational sustainability (management, revenue, long-term viability) is explicitly required alongside spatial and design briefs
flexibility is embedded to allow culture to evolve over time
stronger links are made to delivery mechanisms, including the Cultural Infrastructure Strategy and partnership models
This ensures cultural hubs are viable, adaptable and resilient.
I support Create Cambridge in asking that:
the Agent of Change principle is explicitly embedded, placing responsibility for mitigation on new residential development, not existing venues
major developments demonstrate equitable access, including late-evening public transport, so hubs serve the wider region, not only immediate residents

Comment

Draft Greater Cambridge Local Plan for consultation

Wellbeing and social inclusion

Representation ID: 202298

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Cambridge Junction and Create Cambridge in asking that:
• cultural infrastructure’s ongoing revenue and organisational capacity needs are recognised, not just physical buildings
• culture is embedded in cross-cutting outcomes (innovation, health, education, community resilience)
• partnership frameworks between councils, cultural organisations and communities are referenced as delivery mechanisms
This aligns community infrastructure with lived cultural use.

Full text:

I support Cambridge Junction and Create Cambridge in asking that:
• cultural infrastructure’s ongoing revenue and organisational capacity needs are recognised, not just physical buildings
• culture is embedded in cross-cutting outcomes (innovation, health, education, community resilience)
• partnership frameworks between councils, cultural organisations and communities are referenced as delivery mechanisms
This aligns community infrastructure with lived cultural use.

Comment

Draft Greater Cambridge Local Plan for consultation

Climate Change

Representation ID: 202300

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Cambridge Junction and Create Cambridge in asking that:
• cultural infrastructure’s contribution to climate outcomes (adaptive reuse, shared spaces, walkable places) is explicitly recognised
• culture is embedded within this chapter, not treated solely as a social outcome
Cultural venues support low-carbon placemaking and should be reflected in climate policy.

Full text:

I support Cambridge Junction and Create Cambridge in asking that:
• cultural infrastructure’s contribution to climate outcomes (adaptive reuse, shared spaces, walkable places) is explicitly recognised
• culture is embedded within this chapter, not treated solely as a social outcome
Cultural venues support low-carbon placemaking and should be reflected in climate policy.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy J/AW: Affordable workspace and creative industries

Representation ID: 202302

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Cambridge Junction and Create Cambridge in asking that:
• “Affordable Office Space” is clearly distinguished from “Cultural Production Space”
• genuinely affordable cultural production space is required (e.g. peppercorn, with rental charges well-below market rates and established based on evidence, ie Wysing Arts Centre’s research on affordable artist studios)
• rehearsal, making and sole-use studios are prioritised over generic co-working
• a minimum requirement (e.g., 10% in schemes over 1,000 sqm) is introduced
This safeguards usable creative space from being diluted.

Full text:

I support Cambridge Junction and Create Cambridge in asking that:
• “Affordable Office Space” is clearly distinguished from “Cultural Production Space”
• genuinely affordable cultural production space is required (e.g. peppercorn, with rental charges well-below market rates and established based on evidence, ie Wysing Arts Centre’s research on affordable artist studios)
• rehearsal, making and sole-use studios are prioritised over generic co-working
• a minimum requirement (e.g., 10% in schemes over 1,000 sqm) is introduced
This safeguards usable creative space from being diluted.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy WS/MU: Meanwhile uses during long term redevelopments

Representation ID: 202303

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Create Cambridge in asking that:
a Meanwhile Strategy is required at validation for Areas of Major Change and large phased developments
strategies set out activation of vacant sites, governance arrangements, exit pathways to permanent provision
cultural/community uses are embedded throughout long construction periods, not only at completion
long-term vacant units are proactively enabled for cultural use; artists involved in shaping terms
clear exit pathways prevent displacement when redevelopment proceeds
creative commons/Creative Land Trust-style models are explored to secure permanent affordable space
Create Cambridge is engaged as a key consultee on delivery models, drawing on national and international precedents

Full text:

I support Create Cambridge in asking that:
a Meanwhile Strategy is required at validation for Areas of Major Change and large phased developments
strategies set out activation of vacant sites, governance arrangements, exit pathways to permanent provision
cultural/community uses are embedded throughout long construction periods, not only at completion
long-term vacant units are proactively enabled for cultural use; artists involved in shaping terms
clear exit pathways prevent displacement when redevelopment proceeds
creative commons/Creative Land Trust-style models are explored to secure permanent affordable space
Create Cambridge is engaged as a key consultee on delivery models, drawing on national and international precedents

Comment

Draft Greater Cambridge Local Plan for consultation

Policy GP/QP: Establishing high quality landscape and public realm

Representation ID: 202305

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Create Cambridge in asking that:
• public art and cultural activation link to a Percent for Art initiative or Cultural Infrastructure Levy
• the Public Art SPD is explicitly referenced
• artists are appointed at RIBA Stage 2–3, embedded in masterplanning
• Create Cambridge is engaged as advisor/consultee/co-curator (with communities) in developing plans and strategies for public art and cultural activation
This ensures cultural value is designed in from the outset.

Full text:

I support Create Cambridge in asking that:
• public art and cultural activation link to a Percent for Art initiative or Cultural Infrastructure Levy
• the Public Art SPD is explicitly referenced
• artists are appointed at RIBA Stage 2–3, embedded in masterplanning
• Create Cambridge is engaged as advisor/consultee/co-curator (with communities) in developing plans and strategies for public art and cultural activation
This ensures cultural value is designed in from the outset.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/NEC: North East Cambridge

Representation ID: 202308

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Create Cambridge in asking that:
• delivery of a cultural anchor (venue, arts centre or artist studios) is required in Phase 1
• cultural provision is not deferred to later phases, where it is at risk of non-delivery
• Create Cambridge is engaged as an advisor/consultee on plans and proposals for cultural infrastructure as part of new developments
Early cultural infrastructure is essential to avoid dormitory development and support identity, cohesion and liveability.

Full text:

I support Create Cambridge in asking that:
• delivery of a cultural anchor (venue, arts centre or artist studios) is required in Phase 1
• cultural provision is not deferred to later phases, where it is at risk of non-delivery
• Create Cambridge is engaged as an advisor/consultee on plans and proposals for cultural infrastructure as part of new developments
Early cultural infrastructure is essential to avoid dormitory development and support identity, cohesion and liveability.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/CE: Cambridge East

Representation ID: 202311

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Create Cambridge in asking that:
• delivery of a cultural anchor (venue, arts centre or artist studios) is required in Phase 1
• cultural provision is not deferred to later phases, where it is at risk of non-delivery
• Create Cambridge is engaged as an advisor/consultee on plans and proposals for cultural infrastructure as part of new developments
Early cultural infrastructure is essential to avoid dormitory development and support identity, cohesion and liveability.

Full text:

I support Create Cambridge in asking that:
• delivery of a cultural anchor (venue, arts centre or artist studios) is required in Phase 1
• cultural provision is not deferred to later phases, where it is at risk of non-delivery
• Create Cambridge is engaged as an advisor/consultee on plans and proposals for cultural infrastructure as part of new developments
Early cultural infrastructure is essential to avoid dormitory development and support identity, cohesion and liveability.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy I/ID: Infrastructure and delivery

Representation ID: 202312

Received: 28/01/2026

Respondent: Cambridge Junction

Representation Summary:

I support Cambridge Junction/Create Cambridge in asking that:
cultural infrastructure is recognised as core civic infrastructure
cultural venues are integrated into infrastructure planning, phasing and investment pathways
a partnership-owned Cultural Infrastructure Pipeline is established for new provision and renewal
despite hight cultural participation (classed as “low cultural need”), the Plan recognises that significant investment is required
coordinated public/private/philanthropic investment is enabled, including visitor-linked and locally retained funding, with findings embedded in infrastructure planning
community asset transfer is strengthened with governance support, capital access, enabling genuine community ownership
Create Cambridge is engaged as an advisor on cultural infrastructure, strategy development

Full text:

I support Cambridge Junction/Create Cambridge in asking that:
cultural infrastructure is recognised as core civic infrastructure
cultural venues are integrated into infrastructure planning, phasing and investment pathways
a partnership-owned Cultural Infrastructure Pipeline is established for new provision and renewal
despite hight cultural participation (classed as “low cultural need”), the Plan recognises that significant investment is required
coordinated public/private/philanthropic investment is enabled, including visitor-linked and locally retained funding, with findings embedded in infrastructure planning
community asset transfer is strengthened with governance support, capital access, enabling genuine community ownership
Create Cambridge is engaged as an advisor on cultural infrastructure, strategy development

For instructions on how to use the system and make comments, please see our help guide.