Draft Greater Cambridge Local Plan for consultation

Search representations

Results for Cambridge Junction / Create Cambridge search

New search New search

Comment

Draft Greater Cambridge Local Plan for consultation

Policy I/DI: Digital and telecommunications infrastructure

Representation ID: 202327

Received: 28/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Create Cambridge in asking that:
• further development of the local plan refers to the Create Cambridge Insights Report as evidence base with regards to the development of Cambridge’s digital cultural infrastructure
• digital cultural infrastructure is recognised within infrastructure expectations/GCCIS
• commitment to common metrics, aggregated data and measurement tools
• digital capability is included within the definition of cultural infrastructure
• the Cultural Infrastructure Pipeline incorporates shared platforms, interoperable systems, aggregated data tools and organisational digital capacity
• low digital maturity is addressed, including that only 9.2% of venues currently use connected booking systems

Full text:

I support Create Cambridge in asking that:
• further development of the local plan refers to the Create Cambridge Insights Report as evidence base with regards to the development of Cambridge’s digital cultural infrastructure
• digital cultural infrastructure is recognised within infrastructure expectations/GCCIS
• commitment to common metrics, aggregated data and measurement tools
• digital capability is included within the definition of cultural infrastructure
• the Cultural Infrastructure Pipeline incorporates shared platforms, interoperable systems, aggregated data tools and organisational digital capacity
• low digital maturity is addressed, including that only 9.2% of venues currently use connected booking systems

Comment

Draft Greater Cambridge Local Plan for consultation

Wellbeing and social inclusion

Representation ID: 202329

Received: 28/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Cambridge Junction and Create Cambridge in asking that:
• the Cultural Infrastructure Strategy strengthens its focus on delivery pathways, not only mapping of need
• clearer links are made to planning obligations, capital funding routes and operating models
• partnership/shared-service capacity is resourced
• Creative Commons approaches are included as part of long-term stability, not only meanwhile use
• Create Cambridge is engaged as advisor/consultee on the further development of the Cultural Infrastructure Strategy

Full text:

I support Cambridge Junction and Create Cambridge in asking that:
• the Cultural Infrastructure Strategy strengthens its focus on delivery pathways, not only mapping of need
• clearer links are made to planning obligations, capital funding routes and operating models
• partnership/shared-service capacity is resourced
• Creative Commons approaches are included as part of long-term stability, not only meanwhile use
• Create Cambridge is engaged as advisor/consultee on the further development of the Cultural Infrastructure Strategy

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/MO: Monitoring

Representation ID: 202330

Received: 28/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Create Cambridge in asking that:
• Creative Industries data is disaggregated from the Cultural Sector in future monitoring
• assumptions about resilience and commercial success are tested separately for cultural infrastructure
• the Create Cambridge Insights Report is included as evidence base
This will ensure that future policies and plans are based on accurate economic diagnosis.

Full text:

I support Create Cambridge in asking that:
• Creative Industries data is disaggregated from the Cultural Sector in future monitoring
• assumptions about resilience and commercial success are tested separately for cultural infrastructure
• the Create Cambridge Insights Report is included as evidence base
This will ensure that future policies and plans are based on accurate economic diagnosis.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/C/CJ: Cambridge Junction and Cambridge Leisure, Hills Road

Representation ID: 202745

Received: 29/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Cambridge Junction in asking that (supported by Theatres Trust):
temporary provision for all cultural functions must be secured before any demolition or displacement
reprovision is delivered as an early phase; no gap in provision
any future Junction is at least equivalent in standard and capacity, including audience, back-of-house, technical capability, servicing
long-term operational/financial viability assessed alongside spatial design
delivery governed through a structured process (CJ/Council governance, RIBA stages, shared brief before developer engagement)
Agent of Change applied so residential development doesn’t restrict Junction operations
I cannot support this allocation unless continuity, equivalence and viable delivery mechanisms are secured.

Full text:

I support Cambridge Junction in asking that (supported by Theatres Trust):
temporary provision for all cultural functions must be secured before any demolition or displacement
reprovision is delivered as an early phase; no gap in provision
any future Junction is at least equivalent in standard and capacity, including audience, back-of-house, technical capability, servicing
long-term operational/financial viability assessed alongside spatial design
delivery governed through a structured process (CJ/Council governance, RIBA stages, shared brief before developer engagement)
Agent of Change applied so residential development doesn’t restrict Junction operations
I cannot support this allocation unless continuity, equivalence and viable delivery mechanisms are secured.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy WS/CH: Cultural and creative hubs

Representation ID: 202746

Received: 29/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Cambridge Junction in asking that:
operational sustainability (management, revenue, long-term viability) is explicitly required alongside spatial and design briefs
flexibility is embedded to allow culture to evolve over time
stronger links are made to delivery mechanisms, including the Cultural Infrastructure Strategy and partnership models
This ensures cultural hubs are viable, adaptable and resilient.
I support Create Cambridge in asking that:
the Agent of Change principle is explicitly embedded, placing responsibility for mitigation on new residential development, not existing venues
major developments demonstrate equitable access, including late-evening public transport, so hubs serve the wider region, not only immediate residents

Full text:

I support Cambridge Junction in asking that:
operational sustainability (management, revenue, long-term viability) is explicitly required alongside spatial and design briefs
flexibility is embedded to allow culture to evolve over time
stronger links are made to delivery mechanisms, including the Cultural Infrastructure Strategy and partnership models
This ensures cultural hubs are viable, adaptable and resilient.
I support Create Cambridge in asking that:
the Agent of Change principle is explicitly embedded, placing responsibility for mitigation on new residential development, not existing venues
major developments demonstrate equitable access, including late-evening public transport, so hubs serve the wider region, not only immediate residents

Comment

Draft Greater Cambridge Local Plan for consultation

Policy WS/NC: Meeting the needs of new and growing Communities

Representation ID: 202749

Received: 29/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Cambridge Junction and Create Cambridge in asking that:
• cultural infrastructure’s ongoing revenue and organisational capacity needs are recognised, not just physical buildings
• culture is embedded in cross-cutting outcomes (innovation, health, education, community resilience)
• partnership frameworks between councils, cultural organisations and communities are referenced as delivery mechanisms
This aligns community infrastructure with lived cultural use.

Full text:

I support Cambridge Junction and Create Cambridge in asking that:
• cultural infrastructure’s ongoing revenue and organisational capacity needs are recognised, not just physical buildings
• culture is embedded in cross-cutting outcomes (innovation, health, education, community resilience)
• partnership frameworks between councils, cultural organisations and communities are referenced as delivery mechanisms
This aligns community infrastructure with lived cultural use.

Comment

Draft Greater Cambridge Local Plan for consultation

Climate Change

Representation ID: 202750

Received: 29/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Cambridge Junction and Create Cambridge in asking that:
• cultural infrastructure’s contribution to climate outcomes (adaptive reuse, shared spaces, walkable places) is explicitly recognised
• culture is embedded within this chapter, not treated solely as a social outcome
Cultural venues support low-carbon placemaking and should be reflected in climate policy.

Full text:

I support Cambridge Junction and Create Cambridge in asking that:
• cultural infrastructure’s contribution to climate outcomes (adaptive reuse, shared spaces, walkable places) is explicitly recognised
• culture is embedded within this chapter, not treated solely as a social outcome
Cultural venues support low-carbon placemaking and should be reflected in climate policy.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy J/AW: Affordable workspace and creative industries

Representation ID: 202751

Received: 29/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Cambridge Junction and Create Cambridge in asking that:
• “Affordable Office Space” is clearly distinguished from “Cultural Production Space”
• genuinely affordable cultural production space is required (e.g. peppercorn, with rental charges well-below market rates and established based on evidence, ie Wysing Arts Centre’s research on affordable artist studios)
• rehearsal, making and sole-use studios are prioritised over generic co-working
• a minimum requirement (e.g., 10% in schemes over 1,000 sqm) is introduced
This safeguards usable creative space from being diluted.

Full text:

I support Cambridge Junction and Create Cambridge in asking that:
• “Affordable Office Space” is clearly distinguished from “Cultural Production Space”
• genuinely affordable cultural production space is required (e.g. peppercorn, with rental charges well-below market rates and established based on evidence, ie Wysing Arts Centre’s research on affordable artist studios)
• rehearsal, making and sole-use studios are prioritised over generic co-working
• a minimum requirement (e.g., 10% in schemes over 1,000 sqm) is introduced
This safeguards usable creative space from being diluted.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy WS/MU: Meanwhile uses during long term redevelopments

Representation ID: 202752

Received: 29/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Create Cambridge in asking that:
a Meanwhile Strategy is required at validation for Areas of Major Change and large phased developments
strategies set out activation of vacant sites, governance arrangements, exit pathways to permanent provision
cultural/community uses are embedded throughout long construction periods, not only at completion
long-term vacant units are proactively enabled for cultural use; artists involved in shaping terms
clear exit pathways prevent displacement when redevelopment proceeds
creative commons/Creative Land Trust-style models are explored to secure permanent affordable space
Create Cambridge is engaged as a key consultee on delivery models, drawing on national and international precedents

Full text:

I support Create Cambridge in asking that:
a Meanwhile Strategy is required at validation for Areas of Major Change and large phased developments
strategies set out activation of vacant sites, governance arrangements, exit pathways to permanent provision
cultural/community uses are embedded throughout long construction periods, not only at completion
long-term vacant units are proactively enabled for cultural use; artists involved in shaping terms
clear exit pathways prevent displacement when redevelopment proceeds
creative commons/Creative Land Trust-style models are explored to secure permanent affordable space
Create Cambridge is engaged as a key consultee on delivery models, drawing on national and international precedents

Comment

Draft Greater Cambridge Local Plan for consultation

Policy GP/QP: Establishing high quality landscape and public realm

Representation ID: 202753

Received: 29/01/2026

Respondent: Cambridge Junction / Create Cambridge

Representation Summary:

I support Create Cambridge in asking that:
• public art and cultural activation link to a Percent for Art initiative or Cultural Infrastructure Levy
• the Public Art SPD is explicitly referenced
• artists are appointed at RIBA Stage 2–3, embedded in masterplanning
• Create Cambridge is engaged as advisor/consultee/co-curator (with communities) in developing plans and strategies for public art and cultural activation
This ensures cultural value is designed in from the outset.

Full text:

I support Create Cambridge in asking that:
• public art and cultural activation link to a Percent for Art initiative or Cultural Infrastructure Levy
• the Public Art SPD is explicitly referenced
• artists are appointed at RIBA Stage 2–3, embedded in masterplanning
• Create Cambridge is engaged as advisor/consultee/co-curator (with communities) in developing plans and strategies for public art and cultural activation
This ensures cultural value is designed in from the outset.

For instructions on how to use the system and make comments, please see our help guide.