Policy CC/WE: Water efficiency in new developments

Representation ID: 201578

Received: 21/01/2026

Respondent: Cambridge Water (South Staffs Water)

Representation Summary:

The final Water Resources Management Plan (WRMP) for 2025-2050 has been published, with reviews every 5 years to adapt to changes.

Demand forecasts for water are based on current local plans and strategic developments, with significant reductions in abstractions planned for 2033 and 2037.

Increased growth beyond adopted plans may raise demand above forecasts, necessitating additional supply and demand options to maintain water supplies.

Non-household connections are restricted to below 20m3/day, and there is advocacy for domestic water consumption standards of 110 litres per person minimum.

The growth forecast to 2032 aligns with previous plans, providing stability, while growth from 2032-2045 is elevated, with strategic sites beyond 2045 being considered. The Grafham transfer will help with supply concerns, but additional growth is challenging until the Fens Reservoir is operational.

Certainty on growth proposals is needed for the revised draft WRMP due in 2028, with potential new water supply options to be developed if cumulative growth requires it. Significant water resources infrastructure has long lead times and must be considered in a regional context.