Draft Greater Cambridge Local Plan for consultation

Search representations

Results for Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust search

New search New search

Support

Draft Greater Cambridge Local Plan for consultation

Policy S/DS: Development strategy

Representation ID: 202484

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The Wildlife Trust supports the climate-led vision approach to the Local Plan.

Wildlife trust are concerned regarding the scale of growth placing further unsustainable demands on water resources to the detriment of our already depleted chalk aquifer and degraded chalk streams.

The proposed Fens Reservoir will not be completed until the late 2030s and the proposed pipeline from Grafham won't be in place until 2032. In the meantime, our chalk streams wont be able to recover in spite of proposed massive investment through Water Companies funding without sufficient supplies of good quality water. It is likely that the Cambridge Water abstraction from the chalk aquifer would have to reduce by half to recover near natural flows. However, the scale of development in the Local Plan will exacerbate the problem without radical solutions.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/DS: Development strategy

Representation ID: 202493

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The overall development strategy is inconsistent and not well enough thought out to deliver the needs of a growing population in Greater Cambridge. There are some aspects such as Cambridge East, Cambourne North and Cambridge North-East that make strategic sense. However, the proposals for the green belt releases south-east of Cambridge are piecemeal and fail to represent a holistic approach to sustainable development. Grange Farm, Abington is ill thought out and will become a mainly car commuter settlement given its proximity to the A11/M11 and ease of access south towards London. It is unlikely that the majority of new residents work in the southern research cluster.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/DS: Development strategy

Representation ID: 202510

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The Local Plan should be delivering a comprehensive plan for the south-east of Cambridge and the areas on the edge of Cherry Hinton, Queen Ediths and Biomedical Campus. A one-off targeted review of the inner green belt boundary coupled with securing the land to provide a large, accessible area of nature rich downland from Cherry Hinton and Queen Ediths to the Gog Magog Hills would set the long-term boundary to Cambridge in the south-east south-east, while delivering the nature-rich downland and strategic accessible natural greenspace that Cambridge is missing. This would complement the similar approach taken at Trumpington Meadows and Clay Farm nearly 20 years ago and deliver a legacy in sustainable development.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/DS: Development strategy

Representation ID: 202513

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The reality is that Cherry Hinton and Gog Magog downs will not be delivered unless the landowners' development aspirations are included in the Local Plan. A small targeted extension to the Peterhouse Business Park either side of Wort's Causeway (20-30 Ha of inaccessible Green Belt) would deliver 150-200 ha of new accessible rich countryside to support the growing city. With Wandlebury and Magog Downs and buffering of and connections to Nine Wells LNR this would provide the sub-regional natural greenspace missing from the Greater Cambridge area, right on the doorstep of Cambridge and in keeping with the vision for an internationally renowned biomedical campus. This needs to be undertaken now and not in the future, the opportunities are partially shown in figure 1 (see attached document).

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/DS: Development strategy

Representation ID: 202524

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The new town at Grange Farm, Abington is too large and inherently unsustainable and appears to have been purely placed there to "jump" the Green Belt. This hasn't worked for places like Bar Hill, which are almost completely car dependent. While a new village in this location might be justified a town that is too small to deliver most of the services residents need will result in high level of out-commuting which is unsustainable.

While public transport is planned and the development is nominally designed to serve the south cluster, the reality is it is located adjacent to the A11 and would provide an ideal location for commuting south towards London. Unless the housing is for employees who work at Granta Park, Babraham or Hinxton it is hard to see how it won't be unsustainable car dominated settlement.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy S/DS: Development strategy

Representation ID: 202526

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

There must be concerns as the delivery of parts of Cambridge North-East if the sewage treatment works cannot be moved. The planned sustainable development of the south-east edge of Cambridge would contribute housing and employment that might not be delivered there or could replace some of what is proposed at Grange Farm, Abington to achieve a smaller and more appropriately sized development.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy BG/BG: Biodiversity and geodiversity

Representation ID: 202808

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The Wildlife Trust strongly supports this policy subject to the following changes to clause 1, 2, 3 and 7 outlined in the attached document. We also recommend changes to the supporting text.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy BG/GI: Green and blue infrastructure

Representation ID: 202813

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The Wildlife Trust strongly supports inclusion of a GI policy and the reference to the Building with Nature Standards and the incorporation of the Greater Cambridge strategic green infrastructure initiatives. We are concerned about several aspects of the policy though acknowledge that it is a still working in progress.

While the policy may help to ensure that most major developments provide high quality GI onsite, there is concern that it will not contribute meaningfully to the delivery of strategic GI across Greater Cambridge. We are concerned that the policy by itself will not deliver strategic GI in the right locations and will fail to match needs without proactive policy and site allocations elsewhere in the Local Plan.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy BG/GI: Green and blue infrastructure

Representation ID: 202815

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

The Cambridge Nature Network sets out clear vision for where strategic green infrastructure and nature recovery can take place. The strategy identifies four areas as the priorities for the provision of Green infrastructure.

This Local Plan must facilitate delivery of the strategic GI required through both policy and appropriate site allocations now. The must be clear funding mechanisms and or enabling development in the right locations to ensure the Cambridge Nature Network of other strategic Green Infrastructure is provided to support the proposed population growth. Without a proactive approach, the local plan will not meet the strategic GI needs and will therefore not deliver sustainable development.

Comment

Draft Greater Cambridge Local Plan for consultation

Policy BG/GI: Green and blue infrastructure

Representation ID: 202819

Received: 23/01/2026

Respondent: Bedfordshire, Cambridgeshire & Northamptonshire Wildlife Trust

Representation Summary:

Some of the proposed locations for major new development are not well located to deliver the strategic green infrastructure Cambridge needs in the right locations. The proposed development at Grange Farm, Abington is a case in point. The site is too small to deliver strategic GI but large enough to add unsustainable pressures on nature sites and country parks. While this development is required to provide funding for strategic GI. the reality is that potential providers will not be able to acquire land required south and east of Cambridge due to current owners and development aspirations of those owners.

At this stage we believe that the local plan has failed to address the strategic GI requirements of Greater Cambridge area and will not do so unless land can be secured in the right locations. We acknowledge that the Councils are aware of this as noted in paragraph. However, addressing this missing aspect of the local plan will be critical in determining whether the plan is sustainable.

For instructions on how to use the system and make comments, please see our help guide.