Draft Greater Cambridge Planning Obligations Supplementary Planning Document re-consultation - 2025

Search representations

Results for Ramblers Association Cambridge Group search

New search New search

Comment

Draft Greater Cambridge Planning Obligations Supplementary Planning Document re-consultation - 2025

Chapter 21: Public Rights of Way

Representation ID: 201123

Received: 07/10/2025

Respondent: Ramblers Association Cambridge Group

Representation Summary:

The SPD should include reference to the Cambridgeshire County Council 'Development and Public Rights of Way: Guidance for Planner and Developers v4' (July 2020) in the list of further guidance documents referenced in Chapter 21.

Comment

Draft Greater Cambridge Planning Obligations Supplementary Planning Document re-consultation - 2025

Chapter 21: Public Rights of Way

Representation ID: 201124

Received: 07/10/2025

Respondent: Ramblers Association Cambridge Group

Representation Summary:

The design and surfacing of PRoW needs to accommodate both soft green surfaces for recreational and leisure walking and hard surface for active travel. We would not want to see soft grassy footpaths resurfaced without due consideration of the impact of the change and we would like to ensure that developers are aware of the application process for a change of surface. The following reference should therefore be added 'Cambridgeshire County Council Change of Surface of PRoW Authorisation (March 2023)'.

Comment

Draft Greater Cambridge Planning Obligations Supplementary Planning Document re-consultation - 2025

Chapter 21: Public Rights of Way

Representation ID: 201125

Received: 07/10/2025

Respondent: Ramblers Association Cambridge Group

Representation Summary:

There is currently a very high level of participation in recreation walks in Cambridgeshire. Organised walks across different organisations typically attract between 8 and 30 people. It is therefore fundamental due to the scale of recreational walking in Cambridgeshire that PRoW's are managed appropriately.

Comment

Draft Greater Cambridge Planning Obligations Supplementary Planning Document re-consultation - 2025

Chapter 21: Public Rights of Way

Representation ID: 201127

Received: 07/10/2025

Respondent: Ramblers Association Cambridge Group

Representation Summary:

The SPD currently has a very modest requirement for developers to connect to the existing PRoW and while this may be acceptable for small developments it is not acceptable to the high number of large scale developments in Cambridgeshire. For example the CSET busway would not consider linking Gog Magog to Babraham Bridleway 2 because it is outside of the development area, so walkers have to use Haverhill road that has no pavement.

Comment

Draft Greater Cambridge Planning Obligations Supplementary Planning Document re-consultation - 2025

Chapter 21: Public Rights of Way

Representation ID: 201128

Received: 07/10/2025

Respondent: Ramblers Association Cambridge Group

Representation Summary:

The Ramblers Association supports the Access to Nature Bill. When improving access to the footpath network this should prioritise accessibility for the most urban deprived areas. The footpath network should also not only aim to connect urban areas with green spaces but to make connection corridors between green spaces. Footpaths should designed to be more than minimum specification for ease of travel and have space either side for planting.

Comment

Draft Greater Cambridge Planning Obligations Supplementary Planning Document re-consultation - 2025

Chapter 21: Public Rights of Way

Representation ID: 201129

Received: 07/10/2025

Respondent: Ramblers Association Cambridge Group

Representation Summary:

Consider funding mechanisms for public rights of way comparable to those proposed for open spaces in Chapter 14, covering both onsite and off‑site provisions.

Comment

Draft Greater Cambridge Planning Obligations Supplementary Planning Document re-consultation - 2025

Chapter 21: Public Rights of Way

Representation ID: 201130

Received: 07/10/2025

Respondent: Ramblers Association Cambridge Group

Representation Summary:

The SPD should reference the opportunities available under the Government’s Environmental Land Management Schemes for new footpaths and bridleways which are provided as a minimum period of 5 years. Landowners are rewarded for delivering environmental benefits. The schemes provide capital and revenue grants for landowners who provide permitted/permissive paths and/or open access land.