Draft Greater Cambridge Planning Obligations Supplementary Planning Document Consultation

Search representations

Results for Cambridge University Hospital NHS Foundation Trust search

New search New search

Object

Draft Greater Cambridge Planning Obligations Supplementary Planning Document Consultation

Chapter 22: Healthcare

Representation ID: 200222

Received: 22/01/2025

Respondent: Cambridge University Hospital NHS Foundation Trust

Agent: Mr Michael Hendry

Representation Summary:

Paragraph 22.10 – the bullet points are misleading. The following section should be moved to the end of the bullet point list to aid clarity:
o “To note, there are two surgeries within the Greater Cambridgeshire boundary which do not fall within the Cambridgeshire & Peterborough ICS:
▪ Bassingbourn Surgery – branch surgery of the Ashwell Surgery which falls under Hertfordshire and West Essex ICS
▪ Gamlingay Surgery – branch surgery of Greensand Medical Practice which falls under Bedfordshire, Luton and Milton Keynes ICS”

Full text:

Paragraph 22.10 – the bullet points are misleading. The following section should be moved to the end of the bullet point list to aid clarity:
o “To note, there are two surgeries within the Greater Cambridgeshire boundary which do not fall within the Cambridgeshire & Peterborough ICS:
▪ Bassingbourn Surgery – branch surgery of the Ashwell Surgery which falls under Hertfordshire and West Essex ICS
▪ Gamlingay Surgery – branch surgery of Greensand Medical Practice which falls under Bedfordshire, Luton and Milton Keynes ICS”

Attachments:

Object

Draft Greater Cambridge Planning Obligations Supplementary Planning Document Consultation

Chapter 22: Healthcare

Representation ID: 200223

Received: 22/01/2025

Respondent: Cambridge University Hospital NHS Foundation Trust

Agent: Mr Michael Hendry

Representation Summary:

Paragraph 22.10 – the bullet point referencing the hospitals within the ICS should be reworded to read “Three Hospitals (Addenbrooke’s Hospital, Rosie Hospital and Royal Papworth Hospital)”

Full text:

Paragraph 22.10 – the bullet point referencing the hospitals within the ICS should be reworded to read “Three Hospitals (Addenbrooke’s Hospital, Rosie Hospital and Royal Papworth Hospital)”

Attachments:

Object

Draft Greater Cambridge Planning Obligations Supplementary Planning Document Consultation

Chapter 22: Healthcare

Representation ID: 200224

Received: 22/01/2025

Respondent: Cambridge University Hospital NHS Foundation Trust

Agent: Mr Michael Hendry

Representation Summary:

Paragraph 22.36, bullet point 2 (New build health facilities), line one to read “this may be either on-site or off-site depending…”

Full text:

Paragraph 22.36, bullet point 2 (New build health facilities), line one to read “this may be either on-site or off-site depending…”

Attachments:

Comment

Draft Greater Cambridge Planning Obligations Supplementary Planning Document Consultation

Chapter 1: Introduction

Representation ID: 200225

Received: 22/01/2025

Respondent: Cambridge University Hospital NHS Foundation Trust

Agent: Mr Michael Hendry

Representation Summary:

We ask that the Planning Obligations SPD is left suitably flexible to allow contributions to be sought from a broader spectrum of healthcare impacts, recognizing we have not yet established a defined methodology.

In recognition of the above need to look at all forms of health infrastructure it is proposed that the definition is considered in its widest form as part of the SPD. We acknowledge that contributions could only be sought based on a robust evidence base and a clear method of calculation for any financial contributions, or on-site provision sought. Our intention is to develop this framework during 2025.

Full text:

See attached letter

Attachments:

For instructions on how to use the system and make comments, please see our help guide.