4.9.1

Showing comments and forms 1 to 4 of 4

Object

Mill Road Depot Draft Planning and Development Brief SPD

Representation ID: 30992

Received: 22/06/2016

Respondent: Abigail Wills

Representation Summary:

There is in no way enough detail here on what is going to happen with regards to school place provision. There is already a catchment 'black hole' by the railway where children are being sent to schools several miles away because of a lack of places at their local catchment school. This issue is going to become critical with this new development, and I see no real council engagement with the specifics of how it is going to be solved. I would like to see concrete suggestions, not vague promises to address the problem at some future point.

Full text:

There is in no way enough detail here on what is going to happen with regards to school place provision. There is already a catchment 'black hole' by the railway where children are being sent to schools several miles away because of a lack of places at their local catchment school. This issue is going to become critical with this new development, and I see no real council engagement with the specifics of how it is going to be solved. I would like to see concrete suggestions, not vague promises to address the problem at some future point.

Support

Mill Road Depot Draft Planning and Development Brief SPD

Representation ID: 31117

Received: 22/07/2016

Respondent: Sport England

Representation Summary:

Sport England would be happy to advise further on the financial contributions required to provide for sport and recreation needs as part of this development.

Full text:

See attachment

Object

Mill Road Depot Draft Planning and Development Brief SPD

Representation ID: 31119

Received: 21/07/2016

Respondent: NHS England

Representation Summary:

Table 1 provides a summary of the capacity position for the GP Catchment Practices once the additional floor space requirements arising from the development proposal are factored in, including an estimate of the costs for providing new floor space and/or related facilities.

There is a capacity deficit in the catchment practices and a developer contribution of £43,900 would be required to mitigate the 'capital cost' to NHS England for the provision of additional primary healthcare services arising directly as a result of the development proposal.

Full text:

See attachment

Object

Mill Road Depot Draft Planning and Development Brief SPD

Representation ID: 31154

Received: 15/07/2016

Respondent: Cambridgeshire County Council

Representation Summary:

Object - reason:

It is suggested that the following text is added after the sentence:

"It is also possible that in addition to the provision of the Chisholm Trail through the site, other transport improvements will be needed off site."

Add:

"Such transport improvements and other necessary mitigation measures will need to be identified through the Transport Assessment process that will accompany any planning applications submitted to develop the site."

Full text:

See Attachments