Greater Cambridge Local Plan Preferred Options

Representation ID: 59884

Received: 09/12/2021

Respondent: Jen Waterfield

Representation Summary:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Full text:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59885

Received: 10/12/2021

Respondent: ms polly waterfield

Representation Summary:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base. I support the letter of objection sent to you by Friends of the Cam, available here; https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.p

Please confirm that you have received my objection.

Full text:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base. I support the letter of objection sent to you by Friends of the Cam, available here; https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.p

Please confirm that you have received my objection.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59887

Received: 12/12/2021

Respondent: Erica Wayne

Representation Summary:

Dear Sir/ Madam,

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection, and that this individual submission is noted, recorded, counted and made available.

Full text:

Dear Sir/ Madam,

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection, and that this individual submission is noted, recorded, counted and made available.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59888

Received: 08/12/2021

Respondent: Nicola Willis

Representation Summary:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Full text:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59889

Received: 12/12/2021

Respondent: Lalita Ramakrishnan

Representation Summary:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection, and that this individual submission is noted, recorded, counted and made available.

Full text:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection, and that this individual submission is noted, recorded, counted and made available.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59890

Received: 08/12/2021

Respondent: Elizabeth Reid

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59891

Received: 12/12/2021

Respondent: Ms Kirsten Rennie

Representation Summary:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base.


I support the letter of objection sent to you by Friends of the Cam, available here
https://www.friendsofthecam.org/content/friends-cam-object-draft-local-plan

Full text:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base.


I support the letter of objection sent to you by Friends of the Cam, available here
https://www.friendsofthecam.org/content/friends-cam-object-draft-local-plan

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59892

Received: 13/12/2021

Respondent: Fiona Crawford

Representation Summary:

Dear Sir/ Madam,

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base . I support the letter of objection sent to you by Friends of the Cam.

Please confirm that you have received my objection, and that this individual submission is noted, recorded, counted and made available.

Full text:

Dear Sir/ Madam,

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base . I support the letter of objection sent to you by Friends of the Cam.

Please confirm that you have received my objection, and that this individual submission is noted, recorded, counted and made available.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59893

Received: 08/12/2021

Respondent: Kathleen Reti

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59894

Received: 10/12/2021

Respondent: Renee Savage

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59895

Received: 12/12/2021

Respondent: Mr Alan Sharpe

Number of people: 2

Representation Summary:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59897

Received: 10/12/2021

Respondent: Mrs Ruth Cushing

Representation Summary:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Kind regards,

Full text:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Kind regards,

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59958

Received: 10/12/2021

Respondent: Dr Natalia Deja

Representation Summary:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Full text:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59959

Received: 12/12/2021

Respondent: L C Driver

Representation Summary:

Objects to Draft Local Plan on the grounds of:
inadequate water supply,
effect on national food security,
failure to minimise climate change,
likely irreparable damage to ecosystems,
carbon emissions resulting from construction,
lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and
a democratic deficit in the process and evidence base.
Request Draft Local Plan is rejected, rewritten and re-submitted for full public consultation.

Full text:

Dear Sir/ Madam,
I am writing in a personal capacity as a farmers daughter and a countryperson aware of ecological difficulties and having lived all over the world experiencing many things that this draft is likely to directly cause – so I object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .
Inadequate Water Supply Cambridge City and South Cambridgeshire already have an unsustainable supply of potable water. In August 2020, the Environment Agency, in response to a query on the viability of water supply to Northstowe Phase 3A wrote to Monica Hone that 'current levels of abstraction are causing environmental damage. Any increase in use within existing licenced volumes will increase the pressure on a system that is already failing environmental targets', and 'many waterbodies did not have the flow to support the ecology.' On the 1st July 2021, DEFRA announced that chalk streams would be given enhanced environmental protection, and published the Environment Agency document titled “Water stressed areas – final classification 2021” which included the fact that the supply areas of Cambridge Water and Anglian Water are areas of serious water stress, page 6. According to Appendix 3, Cambridge Water needs to reduce abstraction by 22 megalitres per day from levels current at 1st July 2021, and Anglian Water needs to reduce abstraction by 189 megalitres per day from levels current at 1st July 2021. Friends of the Cam contact@friendsofthecam.org Yet, one of Anglian Water’s proposed ‘solutions’ to this problem is to pump water from North Lincolnshire, which is also classified by the Environment Agency in the above report as a water stressed area. Inadequate Wastewater Infrastructure Nearly all the growth suggested in the Draft Local Plan will lead to new building with an associated increase in the area of artificial surfaces. Of course the developers will claim this can be off-set by the use of badly designed Sustainable Drainage Systems, SuDS. These are often artificial bodies of pondwater constructed close to developments. It is essential that safe and effective, design and implementation of SuDs is adequately enforced. The local sewage system is currently inadequate. The inadequacy of the sewage system is evidenced by the number of sewage spills by smaller Anglian Water sewage works into the Cam Valley. Currently, there are no plans to improve failing combined sewer overflows (csos), just promises to monitor them more accurately. The Cam Valley upstream of Cambridge saw 622 hours of untreated waste water enter the rivers in 2020, yet Anglian Water is proposing to move the one sewage works in the area which has been upgraded and has sufficient capacity until 2050, the main Cambridge works, into the Green Belt and to spend at least £227 million of public money to do so. To date there have been no upgrades at any of the smaller works in the area while more and more taps are still being connected. The Environment Agency has already warned at least one Cambridgeshire local planning authority, East Cambs District Council, that they must stop looking at the sewage requirements of single planning applications and instead look at the cumulative effects.

Threat to National Food Security According to the government the UK currently imports 45% of its food, however, some sources estimate this to be as much as 8 0%. An accepted value used frequently in the press is 60%. According to the NFU, the Fens produce one third of England’s fresh vegetables, 20% of England’s potatoes, more than 20% of England’s flowers and bulbs, 20% of England’s sugar beet as well as a significant percentage of the country’s cereal, oilseed rape and protein crops. Agriculture employs 80,000 people and produces £3bn pa for the rural economy. Farmers can only produce this food if there is water available for irrigation, if the land is protected for food security and is not sold to developers or covered in solar panels. The national food supply will be severely reduced and much of it completely lost if there is further inward migration to Cambridgeshire. Firstly, there will be a tragic loss of the best and most versatile land due to building and secondly, there will be a further demand on the available water supply. Both effects will be due to the proposed unsustainable growth as a further 100,000+ people (based on the addition of 49,000 houses multiplied by average UK household of 2.4) are drawn to the area using a further 16 megalitres of water per day, (based on a realistic 140 litres per person per day). Furthermore, the Fens are at increasing risk of annual and eventually permanent flooding. See next section below. As can be seen from NFU figures, when the Fens do flood, the national food supply will be reduced by an estimated 20 – 25%. Sea level rise Large areas of Cambridgeshire, including parts of the City of Cambridge, are subject to continuously increasing flood risk. Indeed, not only is sea level rising, the rate of sea level rise is increasing rapidly. For many years, since measurement began, sea level in the Wash was rising at a rate of 3mm per year. In 2019 it was measured by the Environment Agency in the Wash, and confirmed by IPCC figures globally, that the annual rate was now 3.3mm per year. In 2014, the IPCC report estimated a sea level rise of 1 metre by 2100. In 2019, the IPCC increased this estimate to 1.1 metres by 2100. In 2021, the IPCC has increased its estimate again, to a terrifying 2.4 metres by 2100. Meanwhile, the meteorological partnership Climate Central estimates a 4.7 metre sea level rise by 2100 if global temperatures rise by 2°C. Both the IPCC 2021 and the COP26 leadership have confirmed that the world is currently on track for a 2.4°C global temperature rise. The other solution to Cambridgeshire’s water shortages being proposed by Water Resources East and Anglian Water is to build two reservoirs in the Fens, one in South Lincolnshire, the other in Cambridgeshire near the River Great Ouse. However, there is little point in building reservoirs in the Fens when it is clear that there is a high risk they will be flooded by saline water within decades. This greenwash simply won’t wash. As flood risk increases, the Fens will initially be subject to occasional and then annual flooding caused by water in its tidal rivers meeting increased volume of run-off from development. Eventually, the tidal inflow will prevail and flooding will become permanent as the sea level inexorably increases. However, even the first stage will have a significant negative effect on agriculture. The Treasury Green Book assumes loss of cropping for one year if sea water inundation occurs. In fact, as was found in the 1947 and 1953 floods, reduced crop yields last up to seven years due to the presence of a nematode in sea water. Irreparable Damage to Ecosystems Contrary to the widely touted propaganda that somehow 'development will help nature thrive', evidence shows that any increase in artificial surfaces, such as buildings and roads, leads to a decrease in water in the environment. Development also leads to a decrease in the amount of land that can absorb rainwater and recharge water bodies. According to the Royal Horticultural Society, 70% of ponds have been lost from the UK countryside since 1970. The River Cam has lost on average half its flow. In 2019, the River Granta dried up completely. Freshwater biodiversity populations have declined by 84%. Concepts such as 'doubling nature', Biodiversity Net Gain (BNG) and Natural Capital Accounting (NCA) are being used as bargaining chips in the developers' casino that broadly amounts to saying, 'No development means no funding for nature'. This is the antithesis of John Lawton's 2010 plea in 'Making Space for Nature' of significant funding for Nature conservation without any strings attached. The concept of doubling nature is ill-defined - doubling what, exactly? The Draft Local Plan needs to define exactly how the concept will be understood and measured. The global experience of Biodiversity Net Gain, reviewed by zu Ermgassen of DICE, University of Kent, is that it fails twice as often as it succeeds, even though it had the lower bar of No Net Loss, NNL rather than BNG. The same group more recently showed that 95% of early-adopters of BNG practices in England are carrying out on site offsetting (something not covered at all in the new Environment Law), where the developer is the judge, jury and executioner of any offsetting plans. In any case, on site offsetting will not encourage many forms of wildlife and will be prone to the dog-fouling and trampling that harms many wildlife areas, even those remote from housing. Meanwhile, off-site off-setting is already damaging local communities in some rural areas. Natural Capital Accounting is an untested concept. The monetary assessment of ecosystem services (the 'yields') is recognised as being inadequate at present, while assessing the monetary value of ecosystem stocks is more or less impossible (Ian Bateman, communicated to David Rogers). Yet the resulting monetary assessments may be used to trade away environmental for economic assets with a greater yield, for example a factory in a water meadow. The natural environment is our vital life support system, and it is a dangerous delusion to imagine that it can be rendered easily into any economic framework, let alone the pre Dasgupta framework that gives GDP/GVA primacy over all other forms of stocks and yields. Dasgupta defines wealth as the sum of natural, human and economic capitals and yields, and sustainability as the condition where this sum is either stable or increasing. Economic growth at the expense of natural capital and yields is therefore unsustainable. We request that the Cambridge Local Plan adopts the Dasgupta definition of sustainability, i.e. definitely not the NPPF's false definition of 'sustainability', with the caveats mentioned above, especially the false or under-valuation of natural capital. This would provide a better starting point, and the Plan should be reworked in this context. Carbon Emissions arising from Development The Draft Local Plan does not follow a 'brownfield first' approach. It is therefore not consistent with national government policy as expressed repeatedly, recently by the Prime Minister. Greenfield building maximises carbon emissions. The Local Plan should be encouraging Cambridge businesses to move north where there are up to 1 million empty homes and space for 1.3 million more on registered brownfield sites. Old airfields such as those being developed in Cambridgeshire are not true brownfields; only their disused run-ways and any associated buildings are and the former could be easily cleared and used as a source of recycled aggregate. Most of the former Bourn airfield is productive farmland. The massive building and infrastructure programme contained in the Draft Local Plan breaches all obligations for sustainable development. Embodied carbon emissions are ignored in the Plan. Cement manufacture contributes 8% of global carbon emissions which is more than three times the impact of aviation fuel. Iron and steel production accounts for another 8%. Between them they account for more emissions than the USA and are second only to China as greenhouse gas emitters. According to the recent Cambridge and Peterborough Climate Commission report, at the present rate the Region will have used up all of its carbon budget, allocated to meet its legal obligation to reach zero carbon by 2050, in less than six years; due to the level of planned growth, emissions will accelerate further. The obvious conclusion is that all unsustainable growth has to be curbed. The Climate Change Committee has argued in its 2018, 2019 and 2020 Annual Reports to Parliament that UK local and imported emissions arising from construction (the UK imports most of its building materials, even the bricks are made in Belgium or Holland), must be reduced if the UK is to meet its now legal emission targets. No Plan for Integrated Public Transport Climate change should be the single most important consideration in all aspects of transport planning and operation, and the Draft Local Plan fails to do this. Indeed, the current local government structure in Cambridge and South Cambridgeshire with four different authorities claiming responsibility for some aspects of transport planning and delivery, coupled with the divided responsibility for rail infrastructure between Network Rail and East West Rail Company Ltd, is an impediment to any form of joined up thinking about transport. Annual Reports to Parliament by the Climate Change Committee have consistently made the point that ‘Surface Transport’ is the greatest source of greenhouse gas emissions in the UK. Therefore, all transport planning should: (a) seek to minimise all forms of travel by discouraging commuting and leisure travel and encouraging use of digital communications, (b) where travel is essential, encourage active travel and/or use of public transport, (c) provide carbon efficient forms of public transport, particularly light rail and heavy rail on the most heavily used routes. Road widening and road building proposals should be abandoned with immediate effect. The only consideration for any road layout changes, other than road safety, should be the question “Will it reduce net carbon emissions from construction and use?”. Clearly, some small schemes which ease traffic flow will reduce emissions from acceleration, but those that increase road use will not. Levelling Up Major investment in the Cambridge area contradicts government policy to ‘level up’, even within Cambridgeshire. Whilst it is true that some of the most affluent areas include some of the most deprived communities, it is disingenuous to claim that ‘levelling up’ should be about decreasing inequality within economically successful areas, at the expense of other regions of the country where there is far more deprivation. Re-using and upgrading the approximately 1 million empty homes, many of which are in deprived areas such as the former industrial towns and cities in the North, and building another 1.3 million homes on the registered brownfield sites across the country, will reduce carbon emissions from construction massively and speed up delivery - on average by around six months for brownfield sites according to research by CPRE. Democratic deficit in the process and evidence basis Water Resources East have stated that their regional water plans align with the Government's plans for growth. Sewage in rivers and chalk streams is a matter of national concern, yet Water Resources East say that sewage is not part of their remit. Meanwhile, the public consultation for the Draft Local Plan is taking place now, yet the consultation for the Regional Water Plan is not due until summer 2022. The public and councillors are forced to respond to Local Plan proposals with no idea whether, and if so, how, the water and sewage challenges can be resolved or what trade-offs have been proposed. South Cambs. MP Anthony Browne has rightly expressed concerns about the Local Plan process and about water issues and transparency. Water Resources East was established by Anglian Water which, is under investigation for sewage pollution. Anglian Water is also promised £227 millions of tax-payers’ money to re-locate a fully functioning, recently modernised, sewage treatment plant into the Green Belt. This move is not for operational reasons, but to facilitate employment-led growth which requires taking the Green Belt from three medieval Cam Valley villages. This will be the subject of only a partial public inquiry because it has been submitted as a National Infrastructure project in order to minimise public scrutiny. The Draft Local Plan has been prepared by the Greater Cambridge Shared Planning Service, but it appears to be inordinately influenced by the unelected Greater Cambridge Partnership which has business interests and ambitions represented on its board and but no counteracting residents’ interests. Much of the text of the Draft Local Plan appears to be consistent with announcements made by the selfappointed Arc Leaders Group promoting the so-called Ox-Cam Arc. This flawed concept has been criticised for lack of transparency or accountability right across the five affected counties and one county, Buckinghamshire, has withdrawn entirely from this completely undemocratic, self-selecting, body. Conclusion This is the wrong Plan at the wrong time. There are climate, biodiversity and water emergencies globally and locally. Local government should not be planning more economic and population growth in this area or more housing than current government targets require, but prioritising social housing and new water infrastructure to reduce stress on our rivers and wildlife. It should be supporting the national ‘levelling up’ policy. It should be consistent with the government’s ‘brownfield first’ objective which will deliver badly needed homes faster. It should take into account the growing flood risk to large parts of the county and the consequences for national food supply. It needs to take into account the as yet, unknown, long-term effects on employment and travel behaviours of the COVID pandemic. We request that this flawed Draft Local Plan is rejected, rewritten and re-submitted for full public consultation. Kind regards, Steering Group of Friends of the Cam

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59960

Received: 08/12/2021

Respondent: Susan Sharples

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59961

Received: 11/12/2021

Respondent: Schia Sinclair

Representation Summary:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

I would also like to emphasise that, above all, I think we need to protect our green belt and shouldn't be building on it. The proposed relocation of the Newmarket Road Park and Ride, the sewage works and the extensive housing that is planned on greenbelt is really not OK.

Full text:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

I would also like to emphasise that, above all, I think we need to protect our green belt and shouldn't be building on it. The proposed relocation of the Newmarket Road Park and Ride, the sewage works and the extensive housing that is planned on greenbelt is really not OK.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59962

Received: 10/12/2021

Respondent: Risa Sorkin

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here:

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here:

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59963

Received: 09/12/2021

Respondent: Franziska Spalding

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59964

Received: 13/12/2021

Respondent: Natural England

Representation Summary:

Natural England’s key comments
We are pleased that many of our comments at the Issues and Options stage are reflected in the First Proposals Plan, helping to strengthen the Plan’s approach to the ‘big themes’ including climate change, biodiversity and green spaces, wellbeing and social inclusion. Natural England supports the general thrust of the Plan in directing development to where it will have least environmental impact and provide opportunities for enhancements. We therefore welcome that the First Proposals Plan recognises the challenges in identifying long-term and interim solutions to the current water resource crisis to enable sustainable development without further detriment to the natural environment. We support the Plan’s progress, through the Green Infrastructure Recommendations (LUC, September 2021), in presenting opportunities for the Plan to deliver /contribute towards delivery of strategic green infrastructure. Notwithstanding the above, Natural England believes significant additional work is required through the next stages of Plan preparation to progress these ‘solutions’ and demonstrate that development can be delivered sustainably. We have major concerns with the scale of proposed Plan development, and the 2041 timeframe for delivery, given the damage already being inflicted on the natural environment and the lengthy lead-in time for identification and delivery of measures to address the water resource issue and to implement strategic green infrastructure.

Full text:

Thank you for consulting Natural England on the above in your letter dated 1 November 2021.

Natural England is a non-departmental public body. Our statutory purpose is to ensure that the natural environment is conserved, enhanced, and managed for the benefit of present and future generations, thereby contributing to sustainable development.

Natural England’s key comments
We are pleased that many of our comments at the Issues and Options stage, in our letter dated 24 February 2020 (ref. 304246), are reflected in the First Proposals Plan, helping to strengthen the Plan’s approach to the ‘big themes’ including climate change, biodiversity and green spaces, wellbeing and social inclusion. Natural England supports the general thrust of the Plan in directing development to where it will have least environmental impact and provide opportunities for enhancements.

Natural England’s previous advice highlighted the need for the Plan to address uncertainties relating to water resources and infrastructure needed to support new growth, in light of evidence that current levels of abstraction are already damaging the natural environment. We also signalled the need for the establishment of a strategic green infrastructure network that is resilient to the scale of proposed Plan development, capable of meeting people’s needs and addressing adverse impacts to the natural environment. We therefore welcome that the First Proposals Plan recognises the challenges in identifying long-term and interim solutions to the current water resource crisis to enable sustainable development without further detriment to the natural environment. We support the Plan’s progress, through the Green Infrastructure Recommendations (LUC, September 2021), in presenting opportunities for the Plan to deliver /contribute towards delivery of strategic green infrastructure.

Notwithstanding the above, Natural England believes significant additional work is required through the next stages of Plan preparation to progress these ‘solutions’ and demonstrate that development can be delivered sustainably. We have major concerns with the scale of proposed Plan development, and the 2041 timeframe for delivery, given the damage already being inflicted on the natural environment and the lengthy lead-in time for identification and delivery of measures to address the water resource issue and to implement strategic green infrastructure. Some of this Plan development is already progressing, through the adopted strategy, prior to solutions being identified and implemented; the natural environment is already being impacted. The Plan should consider how these impacts and spiralling environmental deterioration can be retrospectively

mitigated.

The section on ‘Ensuring a Deliverable Plan – Water Supply’ recognises the challenge relating to water resources; however, the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions to ensure any level of proposed development is delivered sustainably. There are currently no measures in place to mitigate the adverse effects of current development on the natural environment i.e., more water is being abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat.

Potential solutions to address Greater Cambridge’s green infrastructure deficit, and the recreational pressure effects of development, lie within the Green Infrastructure Initiatives identified in LUC’s Opportunity Mapping Recommendations Report. Natural England fully supports the Initiatives identified; however, these aspirational areas must be progressed into real projects that are happening on the ground by the time the Plan is adopted. Robust Plan policy requirements should secure funding for the delivery and long-term management of these projects from all major development.

We have provided additional comments on the Plan’s key themes and policies below; however, reference should be made to the detailed advice provided in our response to the Issues and Options consultation.

Vision and aims
We support the Plan vision and aims for decreases in our climate impacts and increase in quality of life for communities, minimising carbon emissions and reliance on the private car, increases in nature, wildlife, greenspaces and safeguarding landscapes focusing on what is unique to Greater Cambridge embracing bold new approaches.

Natural England strongly recommends that the vision should advocate a more holistic approach to securing multi-functional benefits through the protection and enhancement of the natural environment. In accordance with paragraphs 17 and 109 of the National Planning Policy Framework (NPPF) the Plan should encourage multiple benefits from the use of land in urban and rural areas, recognising that land can deliver a wide range of ecosystem services required for sustainable development including climate change mitigation, flood management, improved water resources and water quality, biodiversity net gain, accessible high quality green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

The Plan should contribute to and enhance the natural and local environment by recognising the wider benefits of ecosystem services, considering a natural capital evidence approach and making strong links to the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

Development Strategy
The Plan will deliver around 44,400 new homes and provide for approximately 58,500 new jobs. We welcome that the new development strategy aims to meet our increased need for new homes in a way that minimises environmental impacts and improves the wellbeing of our communities.
The strategy proposes 19 additional sites for development, along with sites already allocated in the adopted 2018 Local Plans, along with associated infrastructure including green spaces.

We support proposals to direct development to where it has the least climate impact, where active and public transport is the natural choice, where green infrastructure can be delivered alongside new development, and where jobs, services and facilities can be located near to where people live. The vision includes creating new city neighbourhoods which have the critical mass of homes, jobs and services to create thriving communities, making best use of brownfield and safeguarded land and making the most of public transport links.

Natural England welcomes the use of evidence including the Employment Land and Economic Development Evidence Study and the Greater Cambridge Housing and Employment Relationships

Report to understand the relationship between future jobs and housing growth. We note that these studies found that planning for the standard method housing figure set by government would not support the number of jobs expected to arise between 2020 and 2041. Planning for this housing figure would risk increasing the amount of longer distance commuting into Greater Cambridge, with the resulting impacts on climate change and congestion. On this basis planning for a higher jobs figure and planning for government’s standard method local housing need figure have been rejected as reasonable alternatives.

We note that high-level consideration has been given to the potential impacts of COVID-19 on the economy of Greater Cambridge, to inform this First Proposals consultation. We support the proposal to gather evidence to consider the potential longer-term quantitative impacts of COVID- 19 prior to the Draft Plan stage to understand any implications for the objectively assessed need for jobs and homes for the plan.

Natural England has no objection in principle to the proposed Plan development strategy; however, this is subject to: 1) the identification of strategic water supply solutions and / or interim measures; and 2) development of deliverable strategic GI initiatives and developer requirements and funding mechanisms being secured through the Plan.

Policy S/DS: Development strategy
Figure 6: Map shows proposed sites to be included in the Plan including existing planning permissions alongside a limited number of new sites in the most sustainable locations. We welcome that the sustainability merits, opportunities and constraints for each of the nine potential strategy choices have been considered through the Sustainability Appraisal. Alongside considering the best locations for new homes and jobs, consideration has also been given to the best locations to restore the area’s habitat networks and provide more green spaces for people providing health and wellbeing benefits. Natural England fully supports the identification of 14 Strategic Green Infrastructure Initiatives, through the Green Infrastructure evidence, to help achieve this. We welcome the approach to preparing the preferred development strategy / draft allocations and green infrastructure initiatives in parallel.

We support the general policy direction to focus development where it will have the least climate impact, where it can be aligned with active and public transport, opportunities for delivery of green infrastructure and where jobs, services and facilities can be located nearby whilst ensuring all necessary utilities can be provided in a sustainable way. We support the approach to using less land for development to reduce carbon emissions and allow more space for nature and wildlife.
The strategy focuses on opportunities to use brownfield land and opportunities created by proposed major new infrastructure.

We note that delivery of the adopted strategy is progressing well with development permitted/underway /completed at the edge of Cambridge sites and new settlement sites including Northstowe and Waterbeach New Town. Natural England is aware that these schemes are being delivered in the absence of adequate sustainable water supply infrastructure to serve the development without adverse impact to the natural environment including statutorily designated sites. Many of these schemes are also unlikely to deliver sufficient level of accessible high quality green infrastructure to meet the needs of new residents without adverse recreational pressure impacts to the existing ecological network including statutorily designated sites. These issues need to be addressed urgently through further stages of Plan preparation as discussed in our advice above and below.

Ensuring a deliverable plan – water supply
We welcome the Councils’ recognition that water supply is a significant issue for the deliverability of the Local Plan and we fully support preparation of the Integrated Water Management Study: Outline Water Cycle (WCS) by Stantec (August 2021) to address this. The WCS has identified the need for new strategic water supply infrastructure, such as a new fens reservoir, to provide for longer term needs, and to protect the integrity of the chalk aquifer south of Cambridge, in addition to a range of interim demand management measures. The draft Sustainability Appraisal also identifies significant environmental impacts if the issue is not resolved. This is a major concern for

Natural England in light of proposed growth levels and the damaging effects that groundwater abstraction is already having on the natural environment including water-dependent designated sites and important chalk stream habitats. Natural England has provided its detailed advice on this matter, and highlighted the statutorily designated sites potentially affected, in our response to the consultation on the WCS. These ‘Designated Sites of Concern’ are listed in Appendix B of the August 2021 report.

We are aware that Water Resources East is currently preparing its Water Management Plan for the region and that this will help to identify long-term measures to address the issue. However, these strategic measures, including a new fens reservoir, are unlikely to be available until the 2030’s hence interim measures are required to enable some level of sustainable growth. We welcome the suggestion of including Plan policies to phase delivery of development that can be supported by a sustainable water supply until new strategic infrastructure is in place; however, it will need to be clearly demonstrated that interim solutions are sustainable and will not cause further environmental decline. The risk is that it may not be possible to demonstrate delivery of the full objectively assessed needs within the plan period.

Natural England appreciates that pressure on water supplies is a regional issue. We share the Councils’ aspirations that the water industry, supported by government, will set out its intentions for positively addressing this key infrastructure issue at an early point in the ongoing plan making process, to provide confidence that adequate water supply will be available to support delivery of the preferred options allocations, before the next stage of a full draft Local Plan. In our view the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions, including demand management measures, to ensure any level of proposed development is delivered sustainably.

We have serious concerns that Plan development is already being progressed, through the adopted strategy, without sustainable water supply measures in place. More water will be abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat. The Plan will need to consider the impacts of this development and identify measures to address adverse environmental impact.

Natural England fully supports the concerns raised by the Environment Agency, as lead authority on this matter, including the high degree of uncertainty as to whether sufficient sustainable water supplies can be provided for the proposed growth over the plan period without further detriment to the natural environment. Further development of the WCS, informed by evidence from regional and water company water resource plans, will need to demonstrate that appropriate deliverable mitigation measures can support sustainable growth until new strategic water supply infrastructure becomes operational. We agree with the Environment Agency that it in the face of current challenges it may be appropriate to consider an extended timeframe for delivery of Plan development to limit further environmental degradation until new strategic measures become available. This would allow further time for the identification of truly sustainable options that build in resilience to climate change and robust mitigation and monitoring measures to address impacts to the natural environment and restore habitat condition.

Duty to Cooperate
Natural England welcomes consideration of how the Plan fits with other plans and strategies including cross boundary projects such as the Ox Cam Arc. We support recognition of the Plan to be prepared within a wider regional context noting the Councils’ legal duty to cooperate with key stakeholders and surrounding areas of cross boundary issues. We agree that the development of a clear and positive vision for the future of the Greater Cambridge area can help to shape the proposals for the Ox Cam Arc, noting that the outcome of the Oxford-Cambridge framework is currently awaited.

We particularly support the Councils’ recognition that the water supply challenge discussed above is a serious issue to be resolved.

Natural England will be pleased to engage with the Councils in the preparation and development of a draft Statement of Common Ground.

Transport Strategy
Natural England welcomes that the proposed strategy is heavily informed by the location of existing and committed public transport schemes. We support the use of transport modelling to understand whether additional infrastructure and policies are required to address the transport impacts of the preferred development strategy.

Transport policies should include requirements for projects to undertake robust ecological impact assessment and application of the ecological mitigation hierarchy.

Site allocation policies
Proposed site allocation policies are described through sections 2.2 – 2.5. Natural England has no objection in principle to the existing and new allocations, areas of major change or opportunity areas being taken forward for development. However, this is subject to:
• identification of strategic water supply infrastructure and/or feasible interim solutions to demonstrate that development can be delivered sustainably and without adverse impact to the natural environment;
• establishment of a framework and robust plan policies to deliver the 14 Strategic Green Infrastructure initiatives ahead of development, to meet development needs and to address the effects of recreational pressure on sensitive sites and habitats.

The site allocation policies will need to include robust requirements to secure delivery of biodiversity net gain and on-site accessible green infrastructure to meet people’s need and to contribute towards the Plan’s 20% BNG targets and delivery of the Nature Recovery Network / Cambridge Nature Network. Our advice is that major allocation policies should set a framework for development to maximum opportunities for environmental gains.

Climate Change
We welcome the proposed policies relating to net zero carbon and water efficiency, designing for climate change, flooding and integrated water management, renewable energy projects, reducing waste and supporting land-based carbon sequestration. We particularly support the proposed requirement for residential developments to be designed to achieve a standard of 80 litres/person/ day; however, we support the Environment Agency’s concerns as to whether the Plan is likely to achieve the reductions in demand required to support sustainable growth. As indicated above the WCS will need to demonstrate how water, to meet growth needs, will be supplied sustainably without adverse impact to the natural environment.

Proposed requirements for developments to provide integrated water management, including sustainable drainage systems (SuDS) where possible and for SuDS and green /brown roofs to provide multiple benefits (including biodiversity and amenity) are welcomed.

We support requirements for renewable energy projects to consider impacts on biodiversity, geodiversity, landscape and water quality.

Natural England welcomes a proposed policy to support the creation of land and habitats that play a role as carbon sinks and protect existing carbon sinks from development, particularly peatlands such as those remaining in the north of South Cambridgeshire district. We welcome recognition of the importance of peatlands as a carbon store and the role of other habitats such as woodlands and grasslands, noting loss and degradation of natural habitats results in the direct loss of carbon stored within them.

As indicated above we recommend that the Plan takes a more holistic approach to securing multi- functional benefits for climate change, flood management, water resources and water quality through the protection and enhancement of the natural environment. Natural solutions can achieve significant additional benefits for biodiversity, green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

Biodiversity and green spaces
We strongly support the proposed biodiversity and green spaces policies and the inclusion of Figure 53 depicting the existing Greater Cambridge green infrastructure network including designated sites.

We welcome that these policies will help to deliver the aims of the Ox Cam Arc of doubling the area of land managed primarily for nature and to deliver a minimum 20% biodiversity net gain on development sites, beyond the mandatory 10% biodiversity net gain requirements of the Environment Act 2021. We agree that Greater Cambridge has a relatively low level of designated sites and priority habitats, highlighting the need for development to deliver net gains beyond the 10% proposed nationally, hence we are fully supportive of minimum 20% BNG ambitions. Our advice is that the Councils, working with key partners, should identify BNG opportunities through the next phases of Plan preparation. This should take the form of a BNG opportunities / requirements map building on the foundations of the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

The Councils should also set a landscape / GI framework for the Site Allocations to maximise opportunities for delivery of GI and BNG within the development sites.

BG/BG: Biodiversity and geodiversity
Natural England fully supports this policy and requirements for development to achieve a minimum 20% biodiversity net gain, delivered on site where possible and calculated using the Defra Metric
3.0 or its successor. Requirements for off-site measures to be consistent with the strategic aims of the Greater Cambridge green infrastructure network strategic initiatives are welcomed.

The policy should take a natural capital evidence approach and recognise the wider benefits of ecosystem services for climate change, flood risk management, green infrastructure and health and wellbeing, in addition to biodiversity. They main thrust of this policy should be the Plan’s contribution to the Nature Recovery Network / Cambridge Nature Network and the establishment of a framework for the development of a Local Nature Recovery Strategy.

We support proposed requirements for development to avoid adverse impact to site of biodiversity or geological importance and development to mitigate recreational pressure on statutorily designated sites, applying Natural England’s SSSI Impacts Risk Zones (IRZs). The Plan’s biodiversity policy should recognise the hierarchy of international, nationally and locally designated sites across Greater Cambridge. This should be accompanied by a map of the existing ecological network and enhancement opportunity areas to guide site allocations / development away from more sensitive areas and to identify opportunities for developers to deliver net biodiversity gain enhancements.

We welcome that the policy will seek wider environmental net gains. These should focus on measures to restore ecological networks, enhance ecological resilience and provide an overall increase in natural habitat and ecological features.

Reference should be made to the detailed advice provided in our response to the Issues and Options consultation with regard to protecting and enhancing biodiversity including designated sites, priority habitats, ecological networks and priority and/or legally protected species populations. This includes additional detailed advice on embedding biodiversity net gain into the Greater Cambridge Local Plan policies.

BG/GI: Green infrastructure
We welcome the comprehensive and thorough approach taken in developing the GI evidence base for the Greater Cambridge Local Plan, including the Opportunity Mapping and the identification of 14 Strategic GI initiatives. The multifunctional benefits of GI are fully recognised, as well as the links between GI provision and the delivery of other strategic policy areas including the wider natural environment, sustainable transport and social inclusion. These threads/links

should continue through future drafts to ensure the value of GI for people and the natural environment is fully reflected in the Local Plan.

The Strategic GI initiatives are comprehensive and capture a wide variety of GI opportunities within the 14 proposals; this range of GI elements and habitats will help to maximise benefits for people and nature through the strategic planning and delivery of GI across Greater Cambridge. We support the emphasis given to blue infrastructure in Strategic Initiatives 1 and 2 given the considerable pressures on Cambridgeshire’s chalk streams and aquifer from agriculture and development. The Chalk Stream Strategy Report1 recently published by CaBA identifies a number of recommendations to protect/restore chalk stream habitats, including those in areas of high population density such as Cambridge. This report may be a useful reference in planning and progressing strategic blue infrastructure initiatives as part of the Greater Cambridge Local Plan.

We support the proposed approach to have a distinct GI policy within the Local Plan, rather than a stand-alone SPD. As noted in the Topic Paper, we agree that the policy should require all developments to contribute towards GI and that it should be incorporated into design from an early stage and through all phases of development, with a longer-term plan in place for its management and maintenance. As well as a GI policy, Green Infrastructure should be integrated into other strategic policy areas and Local Plan themes where relevant. This will give weight to the multifunctional role of GI and demonstrate where it can contribute to policy delivery and outcomes (e.g., in climate change adaptation, supporting healthy communities etc). It will also support the role of GI in implementing other mechanisms and tools, such as Biodiversity Net Gain, and may help in targeting and prioritising opportunities for GI creation and enhancement.

In addition to securing GI within individual developments, the Local Plan should also provide a framework for proposals to contribute to / link up with the wider Strategic Initiatives, including the ‘dispersed initiatives’ 10-14 (e.g., ‘Expanding the Urban Forest’). Consideration should also be given to potential join-ups on cross-boundary projects and, in time, how the strategic GI network in Greater Cambridge may contribute to greenspace at the regional level (as one of the 5 Ox-Cam counties). There may also be overlaps with other initiatives, such as the Nature Recovery Network, where Cambridgeshire’s GI resource can make an important contribution (such as that highlighted in Strategic Initiative 3 for the Gog Magog Hills and Chalkland fringe).

We note from the Part 2 Recommendations Report that there are several points for further consideration, including the funding mechanisms required to ensure that all developments include GI and contribute towards the strategic initiatives. Funding mechanisms (e.g., developer contributions) should be embedded in policy where required and should be identified as early as possible to ensure that benefits are secured long-term. For example, the policies for major allocations will need to include specific requirements for the funding / delivery of the strategic GI ahead of the developments being occupied so that these are clear from the outset. The report presents a number of potential funding sources, including land use planning obligations (e.g., S106) agri-environment streams (such as ELMS) and any ad-hoc opportunities that may arise through partnership working. The increasing emphasis on nature-based solutions may also bring in new revenue streams to support strategic projects, given that many NBS will require a landscape scale / ‘ecosystem’ approach. The costings for the delivery of the GI and biodiversity aspects of the Local Plan could be included in the IDP so that the investment required to bring about delivery is clear and transparent from an early stage and factored into development proposals. Given the significant scale of the work required, consideration should also be given to how the land will be secured to deliver the GI initiatives, whether through direct purchase, lease or management agreements. A long-term approach to the management and maintenance of GI (ideally in perpetuity) also needs to be factored in from an early stage.

Alongside its value for natural capital and placemaking, green infrastructure provides alternative natural greenspaces that can help alleviate and buffer recreational pressures on protected sites. We welcome the recognition of the recreational pressure impacts across Greater Cambridge, and

1 1 Catchment Based Approach (October 2021) Chalk Stream Restoration Strategy: Main Report. See: New strategy launched to protect chalk streams - GOV.UK (www.gov.uk)

the Strategic Initiatives aimed at addressing these (e.g., the Coton corridor and multifunctional GI corridors, Strategic Initiatives 7-8). We support the development of clear policy requirements to address these significant pressures (as suggested in the Topic Paper).

Given the Local Plan’s strong emphasis on GI and the widespread benefits that it can achieve, we feel there is clear value in having a recognised GI standard in place. A standard would help to guide and inform GI planning and delivery and provide a consistent benchmark on quality across different scales/locations of development. It would also support the recommendation in the report for a GI-led design approach to new development. A standard could be supported by other documents, e.g., Local Design Guides, to ensure that nature is fully built into design through the provision of high-quality green infrastructure. Natural England is currently developing a Green Infrastructure Framework to set standards for green space and access to natural greenspaces, as well as a Design Guide and mapping data2 to support this work. We would encourage the use of these resources to guide and inform development of strategic Green Infrastructure and policies for Greater Cambridge. The Framework of GI Standards and products are due for launch in summer/autumn 2022, with a pre-release of the beta mapping and the principles of good green infrastructure in December 20213.

Natural England fully supports the proposed inclusion of policies to improve tree canopy cover, enhance river corridors and protect and enhance open spaces. We advise that robust policy requirements should be included to secure delivery of enhancements through development to ensure the achievement of multi-functional benefits for climate change, biodiversity, water quality, access. As indicated in our comments at the Issues and Options stage tree planting needs to be targeted in appropriate locations and considered in the context of wider plans for nature recovery. Consideration should be given to ecological impacts and the opportunities to create alternative habitats that could deliver better enhancements for people and wildlife, and store carbon effectively. Where woodland habitat creation is appropriate, consideration should be given to natural regeneration, and ‘rewilding’ for the economic and ecological benefits this can achieve.
Any tree planting should use native and local provenance tree species suitable for the location. Natural England advocates an approach which seeks to increase biodiversity and green infrastructure generally, not simply planting of trees, and protecting / enhancing soils, particularly peat soils.

For further advice and guidance on green infrastructure please refer to our comments at the Issues and Options consultation stage.

Wellbeing and inclusion
Natural England is fully supportive of the proposed policies including WS/HD: Creating healthy new developments. Our advice is that the policy should include strong links to the importance of adequate level and quality of accessible green infrastructure for people’s physical and mental health and wellbeing.

Great places
Natural England supports the proposed Great Places policies. We welcome the establishment of a Place and Design Quality Panel to conduct a site typologies study to understand, protect, utilise and enhance the valued characteristics of different areas in the plan, with the intention of using this information to raise design standards to ensure development reflects and enhances Cambridge’s distinctive landscape and townscape character.

We support Policy GP/LC Protection and enhancement of landscape character. Natural England is pleased to see that the Greater Cambridge landscape character assessments have been updated and will provide an up-to-date evidence base for the development of policy GP/LC. Existing retained policies form the South Cambridgeshire Local Plan NH/1, NH/2 and NH/13 and policy 8 of the Cambridge Local Plan should be reviewed and updated in the light of these updated landscape

2 See the GI Framework Mapping Portal: https://designatedsites.naturalengland.org.uk/GreenInfrastructure/Home.aspx 3 How Natural England’s Green Infrastructure Framework can help create better places to live - Natural England (blog.gov.uk)

character assessments to ensure they reflect the most recent baseline evidence.

Policy GP/LC seeks to identify, protect and enhance locally valued landscapes. Any locally designated landscapes, e.g., Areas of Greater Landscape Value, should be identified within the plan and given appropriate policy protection to protect and enhance them and to ensure that development reflects their distinctive character. It is not the role of Natural England to define locally valued landscapes – this is for LPAs and their communities. However, it should be noted that NE considers World Heritage Sites designated for their natural interest, local landscape designations and Inheritance Tax Exempt land to be locally valued. Therefore, these areas should be identified and included on policy maps showing locally designated landscapes along with any ‘Protected views’.

The Strategic Spatial Options Assessment appears to have considered a wide range of options based on up-to-date evidence on landscape and townscape character considerations. We support this approach which is useful in identifying and considering key landscape issues early in the Plan- making process, to feed into the Sustainability Appraisal. We note that the appraisal of the strategic spatial options is based on the interim draft findings of the emerging Landscape Character Assessment. We trust that the preliminary conclusions will be updated following completion of this work. The analysis also notes that recommendations are provided for strategic landscape mitigation and enhancement for each of the strategic spatial options. Natural England supports the proposal to identify specific mitigation as part of more detailed studies in locating and designing future development.

We are generally supportive of policies to protect and enhance the Cambridge Green Belt, achieve high quality development and establish high quality landscape and public realm.

Jobs
Natural England supports proposed policy J/AL: Protecting the best agricultural land. We welcome recognition of soil as a valuable resource and key element of the environmental ecosystem which requires protection, in accordance with paragraph 174 of the NPPF. We note that the protection of peat soils is addressed under the climate change theme discussed above.

Beyond the wider water resource / supply issue, discussed above, we have no substantive comments on the other proposed policies. However, policies will need to include appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Homes
Beyond the wider water resource / supply issue we have no specific comments to make on these proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity. Residential development should also contribute towards delivery of the Strategic GI Initiatives.

Infrastructure
Natural England supports proposed policy I/ST: Sustainable transport and connectivity for the environmental and health benefits this could achieve including reduced emissions, air quality and climate change benefits.

We have no substantive comments on the other proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Habitats Regulations Assessment (HRA)
Natural England supports preparation of the HRA Report by LUC (August 2021). We welcome that this incorporates a screening assessment and Appropriate Assessment. The Screening stage

identifies likely significant effects on European sites, either alone or in combination with other policies and proposals, for several plan policies. These include:
• Physical damage and loss (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Non-physical disturbance (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Recreation – in relation to Wicken Fen Ramsar SAC and Fenland SAC.
• Water Quantity and Quality – in relation to Ouse Washes SAC, SPA and Ramsar site, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC.
The Appropriate Assessment concludes no adverse effect on site integrity as follows: Eversden and Wimpole Woods SAC
Subject to the following safeguards and mitigation measures being implemented:
• Completion of bat surveys for site allocations identified with moderate or high potential to support barbastelle to determine the ecological value of these sites in relation to this bat species and to inform specific mitigation proposals.
• There is a commitment in the plan that proposed development will avoid key habitat features likely to be used by this species and to create and enhance suitable habitat for this species.
• It is also recommended that policy wording in the plan is strengthened to include specific inclusion of the safeguard measures detailed above and that Policy BG/BG Biodiversity and geodiversity is strengthened to include specific reference that mitigation provided should be suitable to the level of protection afforded to designated sites.

Wicken Fen Ramsar site and Fenland SAC
The Appropriate Assessment concludes no adverse effect on integrity as a result of increased recreational pressure provided that the following safeguards and mitigation measures are required by the plan and successfully implemented:
• A commitment in the plan to ensure that development within 20km of the Ramsar site and SAC to provide sufficient suitable alternative natural greenspace in line with advice from Natural England and that there should be specific detail on the policy on the appropriate quantity and quality of open spaces and how delivery and management in perpetuity will be secured.

The Appropriate Assessment is currently unable to conclude no adverse effect on the integrity of the Ouse Washes SAC, SPA and Ramsar, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC, with regard to water quantity and quality, pending the provision of further evidence through the Greater Cambridge IWMS and the WRE IWMP.

We welcome that the HRA has provided a detailed consideration of air quality impacts, associated with Plan development, for the relevant European sites. This is based on best practice Highways England Design Manual for Road and Bridges (DMRB) LA 105 Air quality guidance and considers the potential for traffic-related emissions on the affected road network based on traffic modelling data, in line with the advice provided by Natural England at the Issues and Options stage. Whilst the assessment has ruled out likely significant effects on all relevant European sites Natural England has been unable to carry out a detailed review of this information and will provide comments at the next stage of Plan consultation.

Please note that Natural England is reviewing the Impact Risk Zone (IRZ) for Eversden and Wimpole Woods SAC to take into account the findings of emerging SAC barbastelle tracking surveys being undertaken for major development schemes. It will also take into consideration the availability of suitable foraging resource which is considered to be quite scarce in the local area. In the meantime, until the IRZ is formally amended, and accompanying guidance prepared, we welcome application of a precautionary 20km buffer zone for SAC barbastelles in line with Natural England’s current local guidance.

Natural England is generally supportive of the interim findings of the HRA and will provide further

advice as the HRA is updated in line with the development of Plan policies and further evidence.

Sustainability Appraisal
Through the Sustainability Appraisal (LUC, October 2021) the preferred policy approaches for the Local Plan have been subject to appraisal against the SA objectives. A range of reasonable alternative options has also been assessed, including alternatives to the preferred policy approaches, Strategic Spatial Options and site options. We welcome that the findings of the HRA will be incorporated into the SA and will provide further insight into biodiversity impacts specifically at designated sites, presenting the opportunity to limit adverse impacts at these locations.

We support recognition of the over-abstraction of water in this region as a serious concern. We welcome acknowledgement that action is required now to ensure the availability of water for future uses without detrimental impact on the environment. Natural England agrees that water resource availability and water quality are inter-related and that these are likely to be exacerbated by the effects of climate change.

The new Local Plan presents the opportunity for new development to come forward at the most appropriate locations in order to avoid detrimental impacts on biodiversity assets. However, we support recognition of potential risks to the ecological network including statutorily designated sites, through degradation and other impacts associated with development.

We agree that the new Local Plan provides the opportunity to promote biodiversity gain and to improve the overall ecological network. Natural England also agrees that opportunities identified through the Green Infrastructure Study (2020) could support delivery of Natural England's Habitat Network nearby opportunity zones and support pollinator corridors. Robust plan policies will need to be developed to secure delivery of these enhancements through all relevant development.

The report concludes that overall, the proposed direction of the Local Plan performs well in sustainability terms with a strong focus on providing an appropriate amount of development and policies focused on minimising carbon emissions, particularly through minimising the need to travel, using land efficiently and making the most of existing and planned sustainable transport links. Natural England suggests this is a premature conclusion in the current absence of strategic water supply infrastructure and sustainable interim measures. Development through the adopted strategy is already being progress without these measures in place. Further development of the Green Infrastructure Initiatives is also required to ensure adequate GI to meet development needs and to alleviate recreational pressures on some of our most sensitive sites habitats. Robust plan policies, to secure timely delivery of this strategic green infrastructure, will be required to demonstrate the Plan’s sustainability.

We generally welcome the policy recommendations presented within Chapter 5 of the SA report including reference to the mitigation hierarchy within Policy BG/BG: Biodiversity and geodiversity and stronger commitments to protect and enhance biodiversity within this and the site allocation policies. However, in our view SA recommendations should focus on the urgent requirement for the identification of strategic and interim water resource/infrastructure solutions and further work to progress the GI Initiatives into real projects.

Natural England will provide further advice as the SA is updated in line with the development of Plan policies and further evidence.

We hope our comments are helpful. For any queries relating to the specific advice in this letter only please contact Janet Nuttall on […]. For any new consultations, or to provide further information on this consultation please send your correspondences to consultations@naturalengland.org.uk.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59965

Received: 13/12/2021

Respondent: Natural England

Representation Summary:

We support the Plan vision and aims for decreases in our climate impacts and increase in quality of life for communities, minimising carbon emissions and reliance on the private car, increases in nature, wildlife, greenspaces and safeguarding landscapes focusing on what is unique to Greater Cambridge embracing bold new approaches. Natural England strongly recommends that the vision should advocate a more holistic approach to securing multi-functional benefits through the protection and enhancement of the natural environment.

Full text:

Thank you for consulting Natural England on the above in your letter dated 1 November 2021.

Natural England is a non-departmental public body. Our statutory purpose is to ensure that the natural environment is conserved, enhanced, and managed for the benefit of present and future generations, thereby contributing to sustainable development.

Natural England’s key comments
We are pleased that many of our comments at the Issues and Options stage, in our letter dated 24 February 2020 (ref. 304246), are reflected in the First Proposals Plan, helping to strengthen the Plan’s approach to the ‘big themes’ including climate change, biodiversity and green spaces, wellbeing and social inclusion. Natural England supports the general thrust of the Plan in directing development to where it will have least environmental impact and provide opportunities for enhancements.

Natural England’s previous advice highlighted the need for the Plan to address uncertainties relating to water resources and infrastructure needed to support new growth, in light of evidence that current levels of abstraction are already damaging the natural environment. We also signalled the need for the establishment of a strategic green infrastructure network that is resilient to the scale of proposed Plan development, capable of meeting people’s needs and addressing adverse impacts to the natural environment. We therefore welcome that the First Proposals Plan recognises the challenges in identifying long-term and interim solutions to the current water resource crisis to enable sustainable development without further detriment to the natural environment. We support the Plan’s progress, through the Green Infrastructure Recommendations (LUC, September 2021), in presenting opportunities for the Plan to deliver /contribute towards delivery of strategic green infrastructure.

Notwithstanding the above, Natural England believes significant additional work is required through the next stages of Plan preparation to progress these ‘solutions’ and demonstrate that development can be delivered sustainably. We have major concerns with the scale of proposed Plan development, and the 2041 timeframe for delivery, given the damage already being inflicted on the natural environment and the lengthy lead-in time for identification and delivery of measures to address the water resource issue and to implement strategic green infrastructure. Some of this Plan development is already progressing, through the adopted strategy, prior to solutions being identified and implemented; the natural environment is already being impacted. The Plan should consider how these impacts and spiralling environmental deterioration can be retrospectively

mitigated.

The section on ‘Ensuring a Deliverable Plan – Water Supply’ recognises the challenge relating to water resources; however, the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions to ensure any level of proposed development is delivered sustainably. There are currently no measures in place to mitigate the adverse effects of current development on the natural environment i.e., more water is being abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat.

Potential solutions to address Greater Cambridge’s green infrastructure deficit, and the recreational pressure effects of development, lie within the Green Infrastructure Initiatives identified in LUC’s Opportunity Mapping Recommendations Report. Natural England fully supports the Initiatives identified; however, these aspirational areas must be progressed into real projects that are happening on the ground by the time the Plan is adopted. Robust Plan policy requirements should secure funding for the delivery and long-term management of these projects from all major development.

We have provided additional comments on the Plan’s key themes and policies below; however, reference should be made to the detailed advice provided in our response to the Issues and Options consultation.

Vision and aims
We support the Plan vision and aims for decreases in our climate impacts and increase in quality of life for communities, minimising carbon emissions and reliance on the private car, increases in nature, wildlife, greenspaces and safeguarding landscapes focusing on what is unique to Greater Cambridge embracing bold new approaches.

Natural England strongly recommends that the vision should advocate a more holistic approach to securing multi-functional benefits through the protection and enhancement of the natural environment. In accordance with paragraphs 17 and 109 of the National Planning Policy Framework (NPPF) the Plan should encourage multiple benefits from the use of land in urban and rural areas, recognising that land can deliver a wide range of ecosystem services required for sustainable development including climate change mitigation, flood management, improved water resources and water quality, biodiversity net gain, accessible high quality green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

The Plan should contribute to and enhance the natural and local environment by recognising the wider benefits of ecosystem services, considering a natural capital evidence approach and making strong links to the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

Development Strategy
The Plan will deliver around 44,400 new homes and provide for approximately 58,500 new jobs. We welcome that the new development strategy aims to meet our increased need for new homes in a way that minimises environmental impacts and improves the wellbeing of our communities.
The strategy proposes 19 additional sites for development, along with sites already allocated in the adopted 2018 Local Plans, along with associated infrastructure including green spaces.

We support proposals to direct development to where it has the least climate impact, where active and public transport is the natural choice, where green infrastructure can be delivered alongside new development, and where jobs, services and facilities can be located near to where people live. The vision includes creating new city neighbourhoods which have the critical mass of homes, jobs and services to create thriving communities, making best use of brownfield and safeguarded land and making the most of public transport links.

Natural England welcomes the use of evidence including the Employment Land and Economic Development Evidence Study and the Greater Cambridge Housing and Employment Relationships

Report to understand the relationship between future jobs and housing growth. We note that these studies found that planning for the standard method housing figure set by government would not support the number of jobs expected to arise between 2020 and 2041. Planning for this housing figure would risk increasing the amount of longer distance commuting into Greater Cambridge, with the resulting impacts on climate change and congestion. On this basis planning for a higher jobs figure and planning for government’s standard method local housing need figure have been rejected as reasonable alternatives.

We note that high-level consideration has been given to the potential impacts of COVID-19 on the economy of Greater Cambridge, to inform this First Proposals consultation. We support the proposal to gather evidence to consider the potential longer-term quantitative impacts of COVID- 19 prior to the Draft Plan stage to understand any implications for the objectively assessed need for jobs and homes for the plan.

Natural England has no objection in principle to the proposed Plan development strategy; however, this is subject to: 1) the identification of strategic water supply solutions and / or interim measures; and 2) development of deliverable strategic GI initiatives and developer requirements and funding mechanisms being secured through the Plan.

Policy S/DS: Development strategy
Figure 6: Map shows proposed sites to be included in the Plan including existing planning permissions alongside a limited number of new sites in the most sustainable locations. We welcome that the sustainability merits, opportunities and constraints for each of the nine potential strategy choices have been considered through the Sustainability Appraisal. Alongside considering the best locations for new homes and jobs, consideration has also been given to the best locations to restore the area’s habitat networks and provide more green spaces for people providing health and wellbeing benefits. Natural England fully supports the identification of 14 Strategic Green Infrastructure Initiatives, through the Green Infrastructure evidence, to help achieve this. We welcome the approach to preparing the preferred development strategy / draft allocations and green infrastructure initiatives in parallel.

We support the general policy direction to focus development where it will have the least climate impact, where it can be aligned with active and public transport, opportunities for delivery of green infrastructure and where jobs, services and facilities can be located nearby whilst ensuring all necessary utilities can be provided in a sustainable way. We support the approach to using less land for development to reduce carbon emissions and allow more space for nature and wildlife.
The strategy focuses on opportunities to use brownfield land and opportunities created by proposed major new infrastructure.

We note that delivery of the adopted strategy is progressing well with development permitted/underway /completed at the edge of Cambridge sites and new settlement sites including Northstowe and Waterbeach New Town. Natural England is aware that these schemes are being delivered in the absence of adequate sustainable water supply infrastructure to serve the development without adverse impact to the natural environment including statutorily designated sites. Many of these schemes are also unlikely to deliver sufficient level of accessible high quality green infrastructure to meet the needs of new residents without adverse recreational pressure impacts to the existing ecological network including statutorily designated sites. These issues need to be addressed urgently through further stages of Plan preparation as discussed in our advice above and below.

Ensuring a deliverable plan – water supply
We welcome the Councils’ recognition that water supply is a significant issue for the deliverability of the Local Plan and we fully support preparation of the Integrated Water Management Study: Outline Water Cycle (WCS) by Stantec (August 2021) to address this. The WCS has identified the need for new strategic water supply infrastructure, such as a new fens reservoir, to provide for longer term needs, and to protect the integrity of the chalk aquifer south of Cambridge, in addition to a range of interim demand management measures. The draft Sustainability Appraisal also identifies significant environmental impacts if the issue is not resolved. This is a major concern for

Natural England in light of proposed growth levels and the damaging effects that groundwater abstraction is already having on the natural environment including water-dependent designated sites and important chalk stream habitats. Natural England has provided its detailed advice on this matter, and highlighted the statutorily designated sites potentially affected, in our response to the consultation on the WCS. These ‘Designated Sites of Concern’ are listed in Appendix B of the August 2021 report.

We are aware that Water Resources East is currently preparing its Water Management Plan for the region and that this will help to identify long-term measures to address the issue. However, these strategic measures, including a new fens reservoir, are unlikely to be available until the 2030’s hence interim measures are required to enable some level of sustainable growth. We welcome the suggestion of including Plan policies to phase delivery of development that can be supported by a sustainable water supply until new strategic infrastructure is in place; however, it will need to be clearly demonstrated that interim solutions are sustainable and will not cause further environmental decline. The risk is that it may not be possible to demonstrate delivery of the full objectively assessed needs within the plan period.

Natural England appreciates that pressure on water supplies is a regional issue. We share the Councils’ aspirations that the water industry, supported by government, will set out its intentions for positively addressing this key infrastructure issue at an early point in the ongoing plan making process, to provide confidence that adequate water supply will be available to support delivery of the preferred options allocations, before the next stage of a full draft Local Plan. In our view the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions, including demand management measures, to ensure any level of proposed development is delivered sustainably.

We have serious concerns that Plan development is already being progressed, through the adopted strategy, without sustainable water supply measures in place. More water will be abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat. The Plan will need to consider the impacts of this development and identify measures to address adverse environmental impact.

Natural England fully supports the concerns raised by the Environment Agency, as lead authority on this matter, including the high degree of uncertainty as to whether sufficient sustainable water supplies can be provided for the proposed growth over the plan period without further detriment to the natural environment. Further development of the WCS, informed by evidence from regional and water company water resource plans, will need to demonstrate that appropriate deliverable mitigation measures can support sustainable growth until new strategic water supply infrastructure becomes operational. We agree with the Environment Agency that it in the face of current challenges it may be appropriate to consider an extended timeframe for delivery of Plan development to limit further environmental degradation until new strategic measures become available. This would allow further time for the identification of truly sustainable options that build in resilience to climate change and robust mitigation and monitoring measures to address impacts to the natural environment and restore habitat condition.

Duty to Cooperate
Natural England welcomes consideration of how the Plan fits with other plans and strategies including cross boundary projects such as the Ox Cam Arc. We support recognition of the Plan to be prepared within a wider regional context noting the Councils’ legal duty to cooperate with key stakeholders and surrounding areas of cross boundary issues. We agree that the development of a clear and positive vision for the future of the Greater Cambridge area can help to shape the proposals for the Ox Cam Arc, noting that the outcome of the Oxford-Cambridge framework is currently awaited.

We particularly support the Councils’ recognition that the water supply challenge discussed above is a serious issue to be resolved.

Natural England will be pleased to engage with the Councils in the preparation and development of a draft Statement of Common Ground.

Transport Strategy
Natural England welcomes that the proposed strategy is heavily informed by the location of existing and committed public transport schemes. We support the use of transport modelling to understand whether additional infrastructure and policies are required to address the transport impacts of the preferred development strategy.

Transport policies should include requirements for projects to undertake robust ecological impact assessment and application of the ecological mitigation hierarchy.

Site allocation policies
Proposed site allocation policies are described through sections 2.2 – 2.5. Natural England has no objection in principle to the existing and new allocations, areas of major change or opportunity areas being taken forward for development. However, this is subject to:
• identification of strategic water supply infrastructure and/or feasible interim solutions to demonstrate that development can be delivered sustainably and without adverse impact to the natural environment;
• establishment of a framework and robust plan policies to deliver the 14 Strategic Green Infrastructure initiatives ahead of development, to meet development needs and to address the effects of recreational pressure on sensitive sites and habitats.

The site allocation policies will need to include robust requirements to secure delivery of biodiversity net gain and on-site accessible green infrastructure to meet people’s need and to contribute towards the Plan’s 20% BNG targets and delivery of the Nature Recovery Network / Cambridge Nature Network. Our advice is that major allocation policies should set a framework for development to maximum opportunities for environmental gains.

Climate Change
We welcome the proposed policies relating to net zero carbon and water efficiency, designing for climate change, flooding and integrated water management, renewable energy projects, reducing waste and supporting land-based carbon sequestration. We particularly support the proposed requirement for residential developments to be designed to achieve a standard of 80 litres/person/ day; however, we support the Environment Agency’s concerns as to whether the Plan is likely to achieve the reductions in demand required to support sustainable growth. As indicated above the WCS will need to demonstrate how water, to meet growth needs, will be supplied sustainably without adverse impact to the natural environment.

Proposed requirements for developments to provide integrated water management, including sustainable drainage systems (SuDS) where possible and for SuDS and green /brown roofs to provide multiple benefits (including biodiversity and amenity) are welcomed.

We support requirements for renewable energy projects to consider impacts on biodiversity, geodiversity, landscape and water quality.

Natural England welcomes a proposed policy to support the creation of land and habitats that play a role as carbon sinks and protect existing carbon sinks from development, particularly peatlands such as those remaining in the north of South Cambridgeshire district. We welcome recognition of the importance of peatlands as a carbon store and the role of other habitats such as woodlands and grasslands, noting loss and degradation of natural habitats results in the direct loss of carbon stored within them.

As indicated above we recommend that the Plan takes a more holistic approach to securing multi- functional benefits for climate change, flood management, water resources and water quality through the protection and enhancement of the natural environment. Natural solutions can achieve significant additional benefits for biodiversity, green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

Biodiversity and green spaces
We strongly support the proposed biodiversity and green spaces policies and the inclusion of Figure 53 depicting the existing Greater Cambridge green infrastructure network including designated sites.

We welcome that these policies will help to deliver the aims of the Ox Cam Arc of doubling the area of land managed primarily for nature and to deliver a minimum 20% biodiversity net gain on development sites, beyond the mandatory 10% biodiversity net gain requirements of the Environment Act 2021. We agree that Greater Cambridge has a relatively low level of designated sites and priority habitats, highlighting the need for development to deliver net gains beyond the 10% proposed nationally, hence we are fully supportive of minimum 20% BNG ambitions. Our advice is that the Councils, working with key partners, should identify BNG opportunities through the next phases of Plan preparation. This should take the form of a BNG opportunities / requirements map building on the foundations of the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

The Councils should also set a landscape / GI framework for the Site Allocations to maximise opportunities for delivery of GI and BNG within the development sites.

BG/BG: Biodiversity and geodiversity
Natural England fully supports this policy and requirements for development to achieve a minimum 20% biodiversity net gain, delivered on site where possible and calculated using the Defra Metric
3.0 or its successor. Requirements for off-site measures to be consistent with the strategic aims of the Greater Cambridge green infrastructure network strategic initiatives are welcomed.

The policy should take a natural capital evidence approach and recognise the wider benefits of ecosystem services for climate change, flood risk management, green infrastructure and health and wellbeing, in addition to biodiversity. They main thrust of this policy should be the Plan’s contribution to the Nature Recovery Network / Cambridge Nature Network and the establishment of a framework for the development of a Local Nature Recovery Strategy.

We support proposed requirements for development to avoid adverse impact to site of biodiversity or geological importance and development to mitigate recreational pressure on statutorily designated sites, applying Natural England’s SSSI Impacts Risk Zones (IRZs). The Plan’s biodiversity policy should recognise the hierarchy of international, nationally and locally designated sites across Greater Cambridge. This should be accompanied by a map of the existing ecological network and enhancement opportunity areas to guide site allocations / development away from more sensitive areas and to identify opportunities for developers to deliver net biodiversity gain enhancements.

We welcome that the policy will seek wider environmental net gains. These should focus on measures to restore ecological networks, enhance ecological resilience and provide an overall increase in natural habitat and ecological features.

Reference should be made to the detailed advice provided in our response to the Issues and Options consultation with regard to protecting and enhancing biodiversity including designated sites, priority habitats, ecological networks and priority and/or legally protected species populations. This includes additional detailed advice on embedding biodiversity net gain into the Greater Cambridge Local Plan policies.

BG/GI: Green infrastructure
We welcome the comprehensive and thorough approach taken in developing the GI evidence base for the Greater Cambridge Local Plan, including the Opportunity Mapping and the identification of 14 Strategic GI initiatives. The multifunctional benefits of GI are fully recognised, as well as the links between GI provision and the delivery of other strategic policy areas including the wider natural environment, sustainable transport and social inclusion. These threads/links

should continue through future drafts to ensure the value of GI for people and the natural environment is fully reflected in the Local Plan.

The Strategic GI initiatives are comprehensive and capture a wide variety of GI opportunities within the 14 proposals; this range of GI elements and habitats will help to maximise benefits for people and nature through the strategic planning and delivery of GI across Greater Cambridge. We support the emphasis given to blue infrastructure in Strategic Initiatives 1 and 2 given the considerable pressures on Cambridgeshire’s chalk streams and aquifer from agriculture and development. The Chalk Stream Strategy Report1 recently published by CaBA identifies a number of recommendations to protect/restore chalk stream habitats, including those in areas of high population density such as Cambridge. This report may be a useful reference in planning and progressing strategic blue infrastructure initiatives as part of the Greater Cambridge Local Plan.

We support the proposed approach to have a distinct GI policy within the Local Plan, rather than a stand-alone SPD. As noted in the Topic Paper, we agree that the policy should require all developments to contribute towards GI and that it should be incorporated into design from an early stage and through all phases of development, with a longer-term plan in place for its management and maintenance. As well as a GI policy, Green Infrastructure should be integrated into other strategic policy areas and Local Plan themes where relevant. This will give weight to the multifunctional role of GI and demonstrate where it can contribute to policy delivery and outcomes (e.g., in climate change adaptation, supporting healthy communities etc). It will also support the role of GI in implementing other mechanisms and tools, such as Biodiversity Net Gain, and may help in targeting and prioritising opportunities for GI creation and enhancement.

In addition to securing GI within individual developments, the Local Plan should also provide a framework for proposals to contribute to / link up with the wider Strategic Initiatives, including the ‘dispersed initiatives’ 10-14 (e.g., ‘Expanding the Urban Forest’). Consideration should also be given to potential join-ups on cross-boundary projects and, in time, how the strategic GI network in Greater Cambridge may contribute to greenspace at the regional level (as one of the 5 Ox-Cam counties). There may also be overlaps with other initiatives, such as the Nature Recovery Network, where Cambridgeshire’s GI resource can make an important contribution (such as that highlighted in Strategic Initiative 3 for the Gog Magog Hills and Chalkland fringe).

We note from the Part 2 Recommendations Report that there are several points for further consideration, including the funding mechanisms required to ensure that all developments include GI and contribute towards the strategic initiatives. Funding mechanisms (e.g., developer contributions) should be embedded in policy where required and should be identified as early as possible to ensure that benefits are secured long-term. For example, the policies for major allocations will need to include specific requirements for the funding / delivery of the strategic GI ahead of the developments being occupied so that these are clear from the outset. The report presents a number of potential funding sources, including land use planning obligations (e.g., S106) agri-environment streams (such as ELMS) and any ad-hoc opportunities that may arise through partnership working. The increasing emphasis on nature-based solutions may also bring in new revenue streams to support strategic projects, given that many NBS will require a landscape scale / ‘ecosystem’ approach. The costings for the delivery of the GI and biodiversity aspects of the Local Plan could be included in the IDP so that the investment required to bring about delivery is clear and transparent from an early stage and factored into development proposals. Given the significant scale of the work required, consideration should also be given to how the land will be secured to deliver the GI initiatives, whether through direct purchase, lease or management agreements. A long-term approach to the management and maintenance of GI (ideally in perpetuity) also needs to be factored in from an early stage.

Alongside its value for natural capital and placemaking, green infrastructure provides alternative natural greenspaces that can help alleviate and buffer recreational pressures on protected sites. We welcome the recognition of the recreational pressure impacts across Greater Cambridge, and

1 1 Catchment Based Approach (October 2021) Chalk Stream Restoration Strategy: Main Report. See: New strategy launched to protect chalk streams - GOV.UK (www.gov.uk)

the Strategic Initiatives aimed at addressing these (e.g., the Coton corridor and multifunctional GI corridors, Strategic Initiatives 7-8). We support the development of clear policy requirements to address these significant pressures (as suggested in the Topic Paper).

Given the Local Plan’s strong emphasis on GI and the widespread benefits that it can achieve, we feel there is clear value in having a recognised GI standard in place. A standard would help to guide and inform GI planning and delivery and provide a consistent benchmark on quality across different scales/locations of development. It would also support the recommendation in the report for a GI-led design approach to new development. A standard could be supported by other documents, e.g., Local Design Guides, to ensure that nature is fully built into design through the provision of high-quality green infrastructure. Natural England is currently developing a Green Infrastructure Framework to set standards for green space and access to natural greenspaces, as well as a Design Guide and mapping data2 to support this work. We would encourage the use of these resources to guide and inform development of strategic Green Infrastructure and policies for Greater Cambridge. The Framework of GI Standards and products are due for launch in summer/autumn 2022, with a pre-release of the beta mapping and the principles of good green infrastructure in December 20213.

Natural England fully supports the proposed inclusion of policies to improve tree canopy cover, enhance river corridors and protect and enhance open spaces. We advise that robust policy requirements should be included to secure delivery of enhancements through development to ensure the achievement of multi-functional benefits for climate change, biodiversity, water quality, access. As indicated in our comments at the Issues and Options stage tree planting needs to be targeted in appropriate locations and considered in the context of wider plans for nature recovery. Consideration should be given to ecological impacts and the opportunities to create alternative habitats that could deliver better enhancements for people and wildlife, and store carbon effectively. Where woodland habitat creation is appropriate, consideration should be given to natural regeneration, and ‘rewilding’ for the economic and ecological benefits this can achieve.
Any tree planting should use native and local provenance tree species suitable for the location. Natural England advocates an approach which seeks to increase biodiversity and green infrastructure generally, not simply planting of trees, and protecting / enhancing soils, particularly peat soils.

For further advice and guidance on green infrastructure please refer to our comments at the Issues and Options consultation stage.

Wellbeing and inclusion
Natural England is fully supportive of the proposed policies including WS/HD: Creating healthy new developments. Our advice is that the policy should include strong links to the importance of adequate level and quality of accessible green infrastructure for people’s physical and mental health and wellbeing.

Great places
Natural England supports the proposed Great Places policies. We welcome the establishment of a Place and Design Quality Panel to conduct a site typologies study to understand, protect, utilise and enhance the valued characteristics of different areas in the plan, with the intention of using this information to raise design standards to ensure development reflects and enhances Cambridge’s distinctive landscape and townscape character.

We support Policy GP/LC Protection and enhancement of landscape character. Natural England is pleased to see that the Greater Cambridge landscape character assessments have been updated and will provide an up-to-date evidence base for the development of policy GP/LC. Existing retained policies form the South Cambridgeshire Local Plan NH/1, NH/2 and NH/13 and policy 8 of the Cambridge Local Plan should be reviewed and updated in the light of these updated landscape

2 See the GI Framework Mapping Portal: https://designatedsites.naturalengland.org.uk/GreenInfrastructure/Home.aspx 3 How Natural England’s Green Infrastructure Framework can help create better places to live - Natural England (blog.gov.uk)

character assessments to ensure they reflect the most recent baseline evidence.

Policy GP/LC seeks to identify, protect and enhance locally valued landscapes. Any locally designated landscapes, e.g., Areas of Greater Landscape Value, should be identified within the plan and given appropriate policy protection to protect and enhance them and to ensure that development reflects their distinctive character. It is not the role of Natural England to define locally valued landscapes – this is for LPAs and their communities. However, it should be noted that NE considers World Heritage Sites designated for their natural interest, local landscape designations and Inheritance Tax Exempt land to be locally valued. Therefore, these areas should be identified and included on policy maps showing locally designated landscapes along with any ‘Protected views’.

The Strategic Spatial Options Assessment appears to have considered a wide range of options based on up-to-date evidence on landscape and townscape character considerations. We support this approach which is useful in identifying and considering key landscape issues early in the Plan- making process, to feed into the Sustainability Appraisal. We note that the appraisal of the strategic spatial options is based on the interim draft findings of the emerging Landscape Character Assessment. We trust that the preliminary conclusions will be updated following completion of this work. The analysis also notes that recommendations are provided for strategic landscape mitigation and enhancement for each of the strategic spatial options. Natural England supports the proposal to identify specific mitigation as part of more detailed studies in locating and designing future development.

We are generally supportive of policies to protect and enhance the Cambridge Green Belt, achieve high quality development and establish high quality landscape and public realm.

Jobs
Natural England supports proposed policy J/AL: Protecting the best agricultural land. We welcome recognition of soil as a valuable resource and key element of the environmental ecosystem which requires protection, in accordance with paragraph 174 of the NPPF. We note that the protection of peat soils is addressed under the climate change theme discussed above.

Beyond the wider water resource / supply issue, discussed above, we have no substantive comments on the other proposed policies. However, policies will need to include appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Homes
Beyond the wider water resource / supply issue we have no specific comments to make on these proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity. Residential development should also contribute towards delivery of the Strategic GI Initiatives.

Infrastructure
Natural England supports proposed policy I/ST: Sustainable transport and connectivity for the environmental and health benefits this could achieve including reduced emissions, air quality and climate change benefits.

We have no substantive comments on the other proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Habitats Regulations Assessment (HRA)
Natural England supports preparation of the HRA Report by LUC (August 2021). We welcome that this incorporates a screening assessment and Appropriate Assessment. The Screening stage

identifies likely significant effects on European sites, either alone or in combination with other policies and proposals, for several plan policies. These include:
• Physical damage and loss (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Non-physical disturbance (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Recreation – in relation to Wicken Fen Ramsar SAC and Fenland SAC.
• Water Quantity and Quality – in relation to Ouse Washes SAC, SPA and Ramsar site, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC.
The Appropriate Assessment concludes no adverse effect on site integrity as follows: Eversden and Wimpole Woods SAC
Subject to the following safeguards and mitigation measures being implemented:
• Completion of bat surveys for site allocations identified with moderate or high potential to support barbastelle to determine the ecological value of these sites in relation to this bat species and to inform specific mitigation proposals.
• There is a commitment in the plan that proposed development will avoid key habitat features likely to be used by this species and to create and enhance suitable habitat for this species.
• It is also recommended that policy wording in the plan is strengthened to include specific inclusion of the safeguard measures detailed above and that Policy BG/BG Biodiversity and geodiversity is strengthened to include specific reference that mitigation provided should be suitable to the level of protection afforded to designated sites.

Wicken Fen Ramsar site and Fenland SAC
The Appropriate Assessment concludes no adverse effect on integrity as a result of increased recreational pressure provided that the following safeguards and mitigation measures are required by the plan and successfully implemented:
• A commitment in the plan to ensure that development within 20km of the Ramsar site and SAC to provide sufficient suitable alternative natural greenspace in line with advice from Natural England and that there should be specific detail on the policy on the appropriate quantity and quality of open spaces and how delivery and management in perpetuity will be secured.

The Appropriate Assessment is currently unable to conclude no adverse effect on the integrity of the Ouse Washes SAC, SPA and Ramsar, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC, with regard to water quantity and quality, pending the provision of further evidence through the Greater Cambridge IWMS and the WRE IWMP.

We welcome that the HRA has provided a detailed consideration of air quality impacts, associated with Plan development, for the relevant European sites. This is based on best practice Highways England Design Manual for Road and Bridges (DMRB) LA 105 Air quality guidance and considers the potential for traffic-related emissions on the affected road network based on traffic modelling data, in line with the advice provided by Natural England at the Issues and Options stage. Whilst the assessment has ruled out likely significant effects on all relevant European sites Natural England has been unable to carry out a detailed review of this information and will provide comments at the next stage of Plan consultation.

Please note that Natural England is reviewing the Impact Risk Zone (IRZ) for Eversden and Wimpole Woods SAC to take into account the findings of emerging SAC barbastelle tracking surveys being undertaken for major development schemes. It will also take into consideration the availability of suitable foraging resource which is considered to be quite scarce in the local area. In the meantime, until the IRZ is formally amended, and accompanying guidance prepared, we welcome application of a precautionary 20km buffer zone for SAC barbastelles in line with Natural England’s current local guidance.

Natural England is generally supportive of the interim findings of the HRA and will provide further

advice as the HRA is updated in line with the development of Plan policies and further evidence.

Sustainability Appraisal
Through the Sustainability Appraisal (LUC, October 2021) the preferred policy approaches for the Local Plan have been subject to appraisal against the SA objectives. A range of reasonable alternative options has also been assessed, including alternatives to the preferred policy approaches, Strategic Spatial Options and site options. We welcome that the findings of the HRA will be incorporated into the SA and will provide further insight into biodiversity impacts specifically at designated sites, presenting the opportunity to limit adverse impacts at these locations.

We support recognition of the over-abstraction of water in this region as a serious concern. We welcome acknowledgement that action is required now to ensure the availability of water for future uses without detrimental impact on the environment. Natural England agrees that water resource availability and water quality are inter-related and that these are likely to be exacerbated by the effects of climate change.

The new Local Plan presents the opportunity for new development to come forward at the most appropriate locations in order to avoid detrimental impacts on biodiversity assets. However, we support recognition of potential risks to the ecological network including statutorily designated sites, through degradation and other impacts associated with development.

We agree that the new Local Plan provides the opportunity to promote biodiversity gain and to improve the overall ecological network. Natural England also agrees that opportunities identified through the Green Infrastructure Study (2020) could support delivery of Natural England's Habitat Network nearby opportunity zones and support pollinator corridors. Robust plan policies will need to be developed to secure delivery of these enhancements through all relevant development.

The report concludes that overall, the proposed direction of the Local Plan performs well in sustainability terms with a strong focus on providing an appropriate amount of development and policies focused on minimising carbon emissions, particularly through minimising the need to travel, using land efficiently and making the most of existing and planned sustainable transport links. Natural England suggests this is a premature conclusion in the current absence of strategic water supply infrastructure and sustainable interim measures. Development through the adopted strategy is already being progress without these measures in place. Further development of the Green Infrastructure Initiatives is also required to ensure adequate GI to meet development needs and to alleviate recreational pressures on some of our most sensitive sites habitats. Robust plan policies, to secure timely delivery of this strategic green infrastructure, will be required to demonstrate the Plan’s sustainability.

We generally welcome the policy recommendations presented within Chapter 5 of the SA report including reference to the mitigation hierarchy within Policy BG/BG: Biodiversity and geodiversity and stronger commitments to protect and enhance biodiversity within this and the site allocation policies. However, in our view SA recommendations should focus on the urgent requirement for the identification of strategic and interim water resource/infrastructure solutions and further work to progress the GI Initiatives into real projects.

Natural England will provide further advice as the SA is updated in line with the development of Plan policies and further evidence.

We hope our comments are helpful. For any queries relating to the specific advice in this letter only please contact Janet Nuttall on […]. For any new consultations, or to provide further information on this consultation please send your correspondences to consultations@naturalengland.org.uk.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59967

Received: 08/12/2021

Respondent: Mr David Stoughton

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59969

Received: 13/12/2021

Respondent: Natural England

Representation Summary:

Ensuring a deliverable plan – water supply
We welcome the Councils’ recognition that water supply is a significant issue for the deliverability of the Local Plan and we fully support preparation of the Integrated Water Management Study: Outline Water Cycle (WCS) by Stantec (August 2021) to address this.

Further development of the WCS, informed by evidence from regional and water company water resource plans, will need to demonstrate that appropriate deliverable mitigation measures can support sustainable growth until new strategic water supply infrastructure becomes operational. We agree with the Environment Agency that it in the face of current challenges it may be appropriate to consider an extended timeframe for delivery of Plan development to limit further environmental degradation until new strategic measures become available.

Full text:

Thank you for consulting Natural England on the above in your letter dated 1 November 2021.

Natural England is a non-departmental public body. Our statutory purpose is to ensure that the natural environment is conserved, enhanced, and managed for the benefit of present and future generations, thereby contributing to sustainable development.

Natural England’s key comments
We are pleased that many of our comments at the Issues and Options stage, in our letter dated 24 February 2020 (ref. 304246), are reflected in the First Proposals Plan, helping to strengthen the Plan’s approach to the ‘big themes’ including climate change, biodiversity and green spaces, wellbeing and social inclusion. Natural England supports the general thrust of the Plan in directing development to where it will have least environmental impact and provide opportunities for enhancements.

Natural England’s previous advice highlighted the need for the Plan to address uncertainties relating to water resources and infrastructure needed to support new growth, in light of evidence that current levels of abstraction are already damaging the natural environment. We also signalled the need for the establishment of a strategic green infrastructure network that is resilient to the scale of proposed Plan development, capable of meeting people’s needs and addressing adverse impacts to the natural environment. We therefore welcome that the First Proposals Plan recognises the challenges in identifying long-term and interim solutions to the current water resource crisis to enable sustainable development without further detriment to the natural environment. We support the Plan’s progress, through the Green Infrastructure Recommendations (LUC, September 2021), in presenting opportunities for the Plan to deliver /contribute towards delivery of strategic green infrastructure.

Notwithstanding the above, Natural England believes significant additional work is required through the next stages of Plan preparation to progress these ‘solutions’ and demonstrate that development can be delivered sustainably. We have major concerns with the scale of proposed Plan development, and the 2041 timeframe for delivery, given the damage already being inflicted on the natural environment and the lengthy lead-in time for identification and delivery of measures to address the water resource issue and to implement strategic green infrastructure. Some of this Plan development is already progressing, through the adopted strategy, prior to solutions being identified and implemented; the natural environment is already being impacted. The Plan should consider how these impacts and spiralling environmental deterioration can be retrospectively

mitigated.

The section on ‘Ensuring a Deliverable Plan – Water Supply’ recognises the challenge relating to water resources; however, the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions to ensure any level of proposed development is delivered sustainably. There are currently no measures in place to mitigate the adverse effects of current development on the natural environment i.e., more water is being abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat.

Potential solutions to address Greater Cambridge’s green infrastructure deficit, and the recreational pressure effects of development, lie within the Green Infrastructure Initiatives identified in LUC’s Opportunity Mapping Recommendations Report. Natural England fully supports the Initiatives identified; however, these aspirational areas must be progressed into real projects that are happening on the ground by the time the Plan is adopted. Robust Plan policy requirements should secure funding for the delivery and long-term management of these projects from all major development.

We have provided additional comments on the Plan’s key themes and policies below; however, reference should be made to the detailed advice provided in our response to the Issues and Options consultation.

Vision and aims
We support the Plan vision and aims for decreases in our climate impacts and increase in quality of life for communities, minimising carbon emissions and reliance on the private car, increases in nature, wildlife, greenspaces and safeguarding landscapes focusing on what is unique to Greater Cambridge embracing bold new approaches.

Natural England strongly recommends that the vision should advocate a more holistic approach to securing multi-functional benefits through the protection and enhancement of the natural environment. In accordance with paragraphs 17 and 109 of the National Planning Policy Framework (NPPF) the Plan should encourage multiple benefits from the use of land in urban and rural areas, recognising that land can deliver a wide range of ecosystem services required for sustainable development including climate change mitigation, flood management, improved water resources and water quality, biodiversity net gain, accessible high quality green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

The Plan should contribute to and enhance the natural and local environment by recognising the wider benefits of ecosystem services, considering a natural capital evidence approach and making strong links to the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

Development Strategy
The Plan will deliver around 44,400 new homes and provide for approximately 58,500 new jobs. We welcome that the new development strategy aims to meet our increased need for new homes in a way that minimises environmental impacts and improves the wellbeing of our communities.
The strategy proposes 19 additional sites for development, along with sites already allocated in the adopted 2018 Local Plans, along with associated infrastructure including green spaces.

We support proposals to direct development to where it has the least climate impact, where active and public transport is the natural choice, where green infrastructure can be delivered alongside new development, and where jobs, services and facilities can be located near to where people live. The vision includes creating new city neighbourhoods which have the critical mass of homes, jobs and services to create thriving communities, making best use of brownfield and safeguarded land and making the most of public transport links.

Natural England welcomes the use of evidence including the Employment Land and Economic Development Evidence Study and the Greater Cambridge Housing and Employment Relationships

Report to understand the relationship between future jobs and housing growth. We note that these studies found that planning for the standard method housing figure set by government would not support the number of jobs expected to arise between 2020 and 2041. Planning for this housing figure would risk increasing the amount of longer distance commuting into Greater Cambridge, with the resulting impacts on climate change and congestion. On this basis planning for a higher jobs figure and planning for government’s standard method local housing need figure have been rejected as reasonable alternatives.

We note that high-level consideration has been given to the potential impacts of COVID-19 on the economy of Greater Cambridge, to inform this First Proposals consultation. We support the proposal to gather evidence to consider the potential longer-term quantitative impacts of COVID- 19 prior to the Draft Plan stage to understand any implications for the objectively assessed need for jobs and homes for the plan.

Natural England has no objection in principle to the proposed Plan development strategy; however, this is subject to: 1) the identification of strategic water supply solutions and / or interim measures; and 2) development of deliverable strategic GI initiatives and developer requirements and funding mechanisms being secured through the Plan.

Policy S/DS: Development strategy
Figure 6: Map shows proposed sites to be included in the Plan including existing planning permissions alongside a limited number of new sites in the most sustainable locations. We welcome that the sustainability merits, opportunities and constraints for each of the nine potential strategy choices have been considered through the Sustainability Appraisal. Alongside considering the best locations for new homes and jobs, consideration has also been given to the best locations to restore the area’s habitat networks and provide more green spaces for people providing health and wellbeing benefits. Natural England fully supports the identification of 14 Strategic Green Infrastructure Initiatives, through the Green Infrastructure evidence, to help achieve this. We welcome the approach to preparing the preferred development strategy / draft allocations and green infrastructure initiatives in parallel.

We support the general policy direction to focus development where it will have the least climate impact, where it can be aligned with active and public transport, opportunities for delivery of green infrastructure and where jobs, services and facilities can be located nearby whilst ensuring all necessary utilities can be provided in a sustainable way. We support the approach to using less land for development to reduce carbon emissions and allow more space for nature and wildlife.
The strategy focuses on opportunities to use brownfield land and opportunities created by proposed major new infrastructure.

We note that delivery of the adopted strategy is progressing well with development permitted/underway /completed at the edge of Cambridge sites and new settlement sites including Northstowe and Waterbeach New Town. Natural England is aware that these schemes are being delivered in the absence of adequate sustainable water supply infrastructure to serve the development without adverse impact to the natural environment including statutorily designated sites. Many of these schemes are also unlikely to deliver sufficient level of accessible high quality green infrastructure to meet the needs of new residents without adverse recreational pressure impacts to the existing ecological network including statutorily designated sites. These issues need to be addressed urgently through further stages of Plan preparation as discussed in our advice above and below.

Ensuring a deliverable plan – water supply
We welcome the Councils’ recognition that water supply is a significant issue for the deliverability of the Local Plan and we fully support preparation of the Integrated Water Management Study: Outline Water Cycle (WCS) by Stantec (August 2021) to address this. The WCS has identified the need for new strategic water supply infrastructure, such as a new fens reservoir, to provide for longer term needs, and to protect the integrity of the chalk aquifer south of Cambridge, in addition to a range of interim demand management measures. The draft Sustainability Appraisal also identifies significant environmental impacts if the issue is not resolved. This is a major concern for

Natural England in light of proposed growth levels and the damaging effects that groundwater abstraction is already having on the natural environment including water-dependent designated sites and important chalk stream habitats. Natural England has provided its detailed advice on this matter, and highlighted the statutorily designated sites potentially affected, in our response to the consultation on the WCS. These ‘Designated Sites of Concern’ are listed in Appendix B of the August 2021 report.

We are aware that Water Resources East is currently preparing its Water Management Plan for the region and that this will help to identify long-term measures to address the issue. However, these strategic measures, including a new fens reservoir, are unlikely to be available until the 2030’s hence interim measures are required to enable some level of sustainable growth. We welcome the suggestion of including Plan policies to phase delivery of development that can be supported by a sustainable water supply until new strategic infrastructure is in place; however, it will need to be clearly demonstrated that interim solutions are sustainable and will not cause further environmental decline. The risk is that it may not be possible to demonstrate delivery of the full objectively assessed needs within the plan period.

Natural England appreciates that pressure on water supplies is a regional issue. We share the Councils’ aspirations that the water industry, supported by government, will set out its intentions for positively addressing this key infrastructure issue at an early point in the ongoing plan making process, to provide confidence that adequate water supply will be available to support delivery of the preferred options allocations, before the next stage of a full draft Local Plan. In our view the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions, including demand management measures, to ensure any level of proposed development is delivered sustainably.

We have serious concerns that Plan development is already being progressed, through the adopted strategy, without sustainable water supply measures in place. More water will be abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat. The Plan will need to consider the impacts of this development and identify measures to address adverse environmental impact.

Natural England fully supports the concerns raised by the Environment Agency, as lead authority on this matter, including the high degree of uncertainty as to whether sufficient sustainable water supplies can be provided for the proposed growth over the plan period without further detriment to the natural environment. Further development of the WCS, informed by evidence from regional and water company water resource plans, will need to demonstrate that appropriate deliverable mitigation measures can support sustainable growth until new strategic water supply infrastructure becomes operational. We agree with the Environment Agency that it in the face of current challenges it may be appropriate to consider an extended timeframe for delivery of Plan development to limit further environmental degradation until new strategic measures become available. This would allow further time for the identification of truly sustainable options that build in resilience to climate change and robust mitigation and monitoring measures to address impacts to the natural environment and restore habitat condition.

Duty to Cooperate
Natural England welcomes consideration of how the Plan fits with other plans and strategies including cross boundary projects such as the Ox Cam Arc. We support recognition of the Plan to be prepared within a wider regional context noting the Councils’ legal duty to cooperate with key stakeholders and surrounding areas of cross boundary issues. We agree that the development of a clear and positive vision for the future of the Greater Cambridge area can help to shape the proposals for the Ox Cam Arc, noting that the outcome of the Oxford-Cambridge framework is currently awaited.

We particularly support the Councils’ recognition that the water supply challenge discussed above is a serious issue to be resolved.

Natural England will be pleased to engage with the Councils in the preparation and development of a draft Statement of Common Ground.

Transport Strategy
Natural England welcomes that the proposed strategy is heavily informed by the location of existing and committed public transport schemes. We support the use of transport modelling to understand whether additional infrastructure and policies are required to address the transport impacts of the preferred development strategy.

Transport policies should include requirements for projects to undertake robust ecological impact assessment and application of the ecological mitigation hierarchy.

Site allocation policies
Proposed site allocation policies are described through sections 2.2 – 2.5. Natural England has no objection in principle to the existing and new allocations, areas of major change or opportunity areas being taken forward for development. However, this is subject to:
• identification of strategic water supply infrastructure and/or feasible interim solutions to demonstrate that development can be delivered sustainably and without adverse impact to the natural environment;
• establishment of a framework and robust plan policies to deliver the 14 Strategic Green Infrastructure initiatives ahead of development, to meet development needs and to address the effects of recreational pressure on sensitive sites and habitats.

The site allocation policies will need to include robust requirements to secure delivery of biodiversity net gain and on-site accessible green infrastructure to meet people’s need and to contribute towards the Plan’s 20% BNG targets and delivery of the Nature Recovery Network / Cambridge Nature Network. Our advice is that major allocation policies should set a framework for development to maximum opportunities for environmental gains.

Climate Change
We welcome the proposed policies relating to net zero carbon and water efficiency, designing for climate change, flooding and integrated water management, renewable energy projects, reducing waste and supporting land-based carbon sequestration. We particularly support the proposed requirement for residential developments to be designed to achieve a standard of 80 litres/person/ day; however, we support the Environment Agency’s concerns as to whether the Plan is likely to achieve the reductions in demand required to support sustainable growth. As indicated above the WCS will need to demonstrate how water, to meet growth needs, will be supplied sustainably without adverse impact to the natural environment.

Proposed requirements for developments to provide integrated water management, including sustainable drainage systems (SuDS) where possible and for SuDS and green /brown roofs to provide multiple benefits (including biodiversity and amenity) are welcomed.

We support requirements for renewable energy projects to consider impacts on biodiversity, geodiversity, landscape and water quality.

Natural England welcomes a proposed policy to support the creation of land and habitats that play a role as carbon sinks and protect existing carbon sinks from development, particularly peatlands such as those remaining in the north of South Cambridgeshire district. We welcome recognition of the importance of peatlands as a carbon store and the role of other habitats such as woodlands and grasslands, noting loss and degradation of natural habitats results in the direct loss of carbon stored within them.

As indicated above we recommend that the Plan takes a more holistic approach to securing multi- functional benefits for climate change, flood management, water resources and water quality through the protection and enhancement of the natural environment. Natural solutions can achieve significant additional benefits for biodiversity, green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

Biodiversity and green spaces
We strongly support the proposed biodiversity and green spaces policies and the inclusion of Figure 53 depicting the existing Greater Cambridge green infrastructure network including designated sites.

We welcome that these policies will help to deliver the aims of the Ox Cam Arc of doubling the area of land managed primarily for nature and to deliver a minimum 20% biodiversity net gain on development sites, beyond the mandatory 10% biodiversity net gain requirements of the Environment Act 2021. We agree that Greater Cambridge has a relatively low level of designated sites and priority habitats, highlighting the need for development to deliver net gains beyond the 10% proposed nationally, hence we are fully supportive of minimum 20% BNG ambitions. Our advice is that the Councils, working with key partners, should identify BNG opportunities through the next phases of Plan preparation. This should take the form of a BNG opportunities / requirements map building on the foundations of the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

The Councils should also set a landscape / GI framework for the Site Allocations to maximise opportunities for delivery of GI and BNG within the development sites.

BG/BG: Biodiversity and geodiversity
Natural England fully supports this policy and requirements for development to achieve a minimum 20% biodiversity net gain, delivered on site where possible and calculated using the Defra Metric
3.0 or its successor. Requirements for off-site measures to be consistent with the strategic aims of the Greater Cambridge green infrastructure network strategic initiatives are welcomed.

The policy should take a natural capital evidence approach and recognise the wider benefits of ecosystem services for climate change, flood risk management, green infrastructure and health and wellbeing, in addition to biodiversity. They main thrust of this policy should be the Plan’s contribution to the Nature Recovery Network / Cambridge Nature Network and the establishment of a framework for the development of a Local Nature Recovery Strategy.

We support proposed requirements for development to avoid adverse impact to site of biodiversity or geological importance and development to mitigate recreational pressure on statutorily designated sites, applying Natural England’s SSSI Impacts Risk Zones (IRZs). The Plan’s biodiversity policy should recognise the hierarchy of international, nationally and locally designated sites across Greater Cambridge. This should be accompanied by a map of the existing ecological network and enhancement opportunity areas to guide site allocations / development away from more sensitive areas and to identify opportunities for developers to deliver net biodiversity gain enhancements.

We welcome that the policy will seek wider environmental net gains. These should focus on measures to restore ecological networks, enhance ecological resilience and provide an overall increase in natural habitat and ecological features.

Reference should be made to the detailed advice provided in our response to the Issues and Options consultation with regard to protecting and enhancing biodiversity including designated sites, priority habitats, ecological networks and priority and/or legally protected species populations. This includes additional detailed advice on embedding biodiversity net gain into the Greater Cambridge Local Plan policies.

BG/GI: Green infrastructure
We welcome the comprehensive and thorough approach taken in developing the GI evidence base for the Greater Cambridge Local Plan, including the Opportunity Mapping and the identification of 14 Strategic GI initiatives. The multifunctional benefits of GI are fully recognised, as well as the links between GI provision and the delivery of other strategic policy areas including the wider natural environment, sustainable transport and social inclusion. These threads/links

should continue through future drafts to ensure the value of GI for people and the natural environment is fully reflected in the Local Plan.

The Strategic GI initiatives are comprehensive and capture a wide variety of GI opportunities within the 14 proposals; this range of GI elements and habitats will help to maximise benefits for people and nature through the strategic planning and delivery of GI across Greater Cambridge. We support the emphasis given to blue infrastructure in Strategic Initiatives 1 and 2 given the considerable pressures on Cambridgeshire’s chalk streams and aquifer from agriculture and development. The Chalk Stream Strategy Report1 recently published by CaBA identifies a number of recommendations to protect/restore chalk stream habitats, including those in areas of high population density such as Cambridge. This report may be a useful reference in planning and progressing strategic blue infrastructure initiatives as part of the Greater Cambridge Local Plan.

We support the proposed approach to have a distinct GI policy within the Local Plan, rather than a stand-alone SPD. As noted in the Topic Paper, we agree that the policy should require all developments to contribute towards GI and that it should be incorporated into design from an early stage and through all phases of development, with a longer-term plan in place for its management and maintenance. As well as a GI policy, Green Infrastructure should be integrated into other strategic policy areas and Local Plan themes where relevant. This will give weight to the multifunctional role of GI and demonstrate where it can contribute to policy delivery and outcomes (e.g., in climate change adaptation, supporting healthy communities etc). It will also support the role of GI in implementing other mechanisms and tools, such as Biodiversity Net Gain, and may help in targeting and prioritising opportunities for GI creation and enhancement.

In addition to securing GI within individual developments, the Local Plan should also provide a framework for proposals to contribute to / link up with the wider Strategic Initiatives, including the ‘dispersed initiatives’ 10-14 (e.g., ‘Expanding the Urban Forest’). Consideration should also be given to potential join-ups on cross-boundary projects and, in time, how the strategic GI network in Greater Cambridge may contribute to greenspace at the regional level (as one of the 5 Ox-Cam counties). There may also be overlaps with other initiatives, such as the Nature Recovery Network, where Cambridgeshire’s GI resource can make an important contribution (such as that highlighted in Strategic Initiative 3 for the Gog Magog Hills and Chalkland fringe).

We note from the Part 2 Recommendations Report that there are several points for further consideration, including the funding mechanisms required to ensure that all developments include GI and contribute towards the strategic initiatives. Funding mechanisms (e.g., developer contributions) should be embedded in policy where required and should be identified as early as possible to ensure that benefits are secured long-term. For example, the policies for major allocations will need to include specific requirements for the funding / delivery of the strategic GI ahead of the developments being occupied so that these are clear from the outset. The report presents a number of potential funding sources, including land use planning obligations (e.g., S106) agri-environment streams (such as ELMS) and any ad-hoc opportunities that may arise through partnership working. The increasing emphasis on nature-based solutions may also bring in new revenue streams to support strategic projects, given that many NBS will require a landscape scale / ‘ecosystem’ approach. The costings for the delivery of the GI and biodiversity aspects of the Local Plan could be included in the IDP so that the investment required to bring about delivery is clear and transparent from an early stage and factored into development proposals. Given the significant scale of the work required, consideration should also be given to how the land will be secured to deliver the GI initiatives, whether through direct purchase, lease or management agreements. A long-term approach to the management and maintenance of GI (ideally in perpetuity) also needs to be factored in from an early stage.

Alongside its value for natural capital and placemaking, green infrastructure provides alternative natural greenspaces that can help alleviate and buffer recreational pressures on protected sites. We welcome the recognition of the recreational pressure impacts across Greater Cambridge, and

1 1 Catchment Based Approach (October 2021) Chalk Stream Restoration Strategy: Main Report. See: New strategy launched to protect chalk streams - GOV.UK (www.gov.uk)

the Strategic Initiatives aimed at addressing these (e.g., the Coton corridor and multifunctional GI corridors, Strategic Initiatives 7-8). We support the development of clear policy requirements to address these significant pressures (as suggested in the Topic Paper).

Given the Local Plan’s strong emphasis on GI and the widespread benefits that it can achieve, we feel there is clear value in having a recognised GI standard in place. A standard would help to guide and inform GI planning and delivery and provide a consistent benchmark on quality across different scales/locations of development. It would also support the recommendation in the report for a GI-led design approach to new development. A standard could be supported by other documents, e.g., Local Design Guides, to ensure that nature is fully built into design through the provision of high-quality green infrastructure. Natural England is currently developing a Green Infrastructure Framework to set standards for green space and access to natural greenspaces, as well as a Design Guide and mapping data2 to support this work. We would encourage the use of these resources to guide and inform development of strategic Green Infrastructure and policies for Greater Cambridge. The Framework of GI Standards and products are due for launch in summer/autumn 2022, with a pre-release of the beta mapping and the principles of good green infrastructure in December 20213.

Natural England fully supports the proposed inclusion of policies to improve tree canopy cover, enhance river corridors and protect and enhance open spaces. We advise that robust policy requirements should be included to secure delivery of enhancements through development to ensure the achievement of multi-functional benefits for climate change, biodiversity, water quality, access. As indicated in our comments at the Issues and Options stage tree planting needs to be targeted in appropriate locations and considered in the context of wider plans for nature recovery. Consideration should be given to ecological impacts and the opportunities to create alternative habitats that could deliver better enhancements for people and wildlife, and store carbon effectively. Where woodland habitat creation is appropriate, consideration should be given to natural regeneration, and ‘rewilding’ for the economic and ecological benefits this can achieve.
Any tree planting should use native and local provenance tree species suitable for the location. Natural England advocates an approach which seeks to increase biodiversity and green infrastructure generally, not simply planting of trees, and protecting / enhancing soils, particularly peat soils.

For further advice and guidance on green infrastructure please refer to our comments at the Issues and Options consultation stage.

Wellbeing and inclusion
Natural England is fully supportive of the proposed policies including WS/HD: Creating healthy new developments. Our advice is that the policy should include strong links to the importance of adequate level and quality of accessible green infrastructure for people’s physical and mental health and wellbeing.

Great places
Natural England supports the proposed Great Places policies. We welcome the establishment of a Place and Design Quality Panel to conduct a site typologies study to understand, protect, utilise and enhance the valued characteristics of different areas in the plan, with the intention of using this information to raise design standards to ensure development reflects and enhances Cambridge’s distinctive landscape and townscape character.

We support Policy GP/LC Protection and enhancement of landscape character. Natural England is pleased to see that the Greater Cambridge landscape character assessments have been updated and will provide an up-to-date evidence base for the development of policy GP/LC. Existing retained policies form the South Cambridgeshire Local Plan NH/1, NH/2 and NH/13 and policy 8 of the Cambridge Local Plan should be reviewed and updated in the light of these updated landscape

2 See the GI Framework Mapping Portal: https://designatedsites.naturalengland.org.uk/GreenInfrastructure/Home.aspx 3 How Natural England’s Green Infrastructure Framework can help create better places to live - Natural England (blog.gov.uk)

character assessments to ensure they reflect the most recent baseline evidence.

Policy GP/LC seeks to identify, protect and enhance locally valued landscapes. Any locally designated landscapes, e.g., Areas of Greater Landscape Value, should be identified within the plan and given appropriate policy protection to protect and enhance them and to ensure that development reflects their distinctive character. It is not the role of Natural England to define locally valued landscapes – this is for LPAs and their communities. However, it should be noted that NE considers World Heritage Sites designated for their natural interest, local landscape designations and Inheritance Tax Exempt land to be locally valued. Therefore, these areas should be identified and included on policy maps showing locally designated landscapes along with any ‘Protected views’.

The Strategic Spatial Options Assessment appears to have considered a wide range of options based on up-to-date evidence on landscape and townscape character considerations. We support this approach which is useful in identifying and considering key landscape issues early in the Plan- making process, to feed into the Sustainability Appraisal. We note that the appraisal of the strategic spatial options is based on the interim draft findings of the emerging Landscape Character Assessment. We trust that the preliminary conclusions will be updated following completion of this work. The analysis also notes that recommendations are provided for strategic landscape mitigation and enhancement for each of the strategic spatial options. Natural England supports the proposal to identify specific mitigation as part of more detailed studies in locating and designing future development.

We are generally supportive of policies to protect and enhance the Cambridge Green Belt, achieve high quality development and establish high quality landscape and public realm.

Jobs
Natural England supports proposed policy J/AL: Protecting the best agricultural land. We welcome recognition of soil as a valuable resource and key element of the environmental ecosystem which requires protection, in accordance with paragraph 174 of the NPPF. We note that the protection of peat soils is addressed under the climate change theme discussed above.

Beyond the wider water resource / supply issue, discussed above, we have no substantive comments on the other proposed policies. However, policies will need to include appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Homes
Beyond the wider water resource / supply issue we have no specific comments to make on these proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity. Residential development should also contribute towards delivery of the Strategic GI Initiatives.

Infrastructure
Natural England supports proposed policy I/ST: Sustainable transport and connectivity for the environmental and health benefits this could achieve including reduced emissions, air quality and climate change benefits.

We have no substantive comments on the other proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Habitats Regulations Assessment (HRA)
Natural England supports preparation of the HRA Report by LUC (August 2021). We welcome that this incorporates a screening assessment and Appropriate Assessment. The Screening stage

identifies likely significant effects on European sites, either alone or in combination with other policies and proposals, for several plan policies. These include:
• Physical damage and loss (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Non-physical disturbance (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Recreation – in relation to Wicken Fen Ramsar SAC and Fenland SAC.
• Water Quantity and Quality – in relation to Ouse Washes SAC, SPA and Ramsar site, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC.
The Appropriate Assessment concludes no adverse effect on site integrity as follows: Eversden and Wimpole Woods SAC
Subject to the following safeguards and mitigation measures being implemented:
• Completion of bat surveys for site allocations identified with moderate or high potential to support barbastelle to determine the ecological value of these sites in relation to this bat species and to inform specific mitigation proposals.
• There is a commitment in the plan that proposed development will avoid key habitat features likely to be used by this species and to create and enhance suitable habitat for this species.
• It is also recommended that policy wording in the plan is strengthened to include specific inclusion of the safeguard measures detailed above and that Policy BG/BG Biodiversity and geodiversity is strengthened to include specific reference that mitigation provided should be suitable to the level of protection afforded to designated sites.

Wicken Fen Ramsar site and Fenland SAC
The Appropriate Assessment concludes no adverse effect on integrity as a result of increased recreational pressure provided that the following safeguards and mitigation measures are required by the plan and successfully implemented:
• A commitment in the plan to ensure that development within 20km of the Ramsar site and SAC to provide sufficient suitable alternative natural greenspace in line with advice from Natural England and that there should be specific detail on the policy on the appropriate quantity and quality of open spaces and how delivery and management in perpetuity will be secured.

The Appropriate Assessment is currently unable to conclude no adverse effect on the integrity of the Ouse Washes SAC, SPA and Ramsar, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC, with regard to water quantity and quality, pending the provision of further evidence through the Greater Cambridge IWMS and the WRE IWMP.

We welcome that the HRA has provided a detailed consideration of air quality impacts, associated with Plan development, for the relevant European sites. This is based on best practice Highways England Design Manual for Road and Bridges (DMRB) LA 105 Air quality guidance and considers the potential for traffic-related emissions on the affected road network based on traffic modelling data, in line with the advice provided by Natural England at the Issues and Options stage. Whilst the assessment has ruled out likely significant effects on all relevant European sites Natural England has been unable to carry out a detailed review of this information and will provide comments at the next stage of Plan consultation.

Please note that Natural England is reviewing the Impact Risk Zone (IRZ) for Eversden and Wimpole Woods SAC to take into account the findings of emerging SAC barbastelle tracking surveys being undertaken for major development schemes. It will also take into consideration the availability of suitable foraging resource which is considered to be quite scarce in the local area. In the meantime, until the IRZ is formally amended, and accompanying guidance prepared, we welcome application of a precautionary 20km buffer zone for SAC barbastelles in line with Natural England’s current local guidance.

Natural England is generally supportive of the interim findings of the HRA and will provide further

advice as the HRA is updated in line with the development of Plan policies and further evidence.

Sustainability Appraisal
Through the Sustainability Appraisal (LUC, October 2021) the preferred policy approaches for the Local Plan have been subject to appraisal against the SA objectives. A range of reasonable alternative options has also been assessed, including alternatives to the preferred policy approaches, Strategic Spatial Options and site options. We welcome that the findings of the HRA will be incorporated into the SA and will provide further insight into biodiversity impacts specifically at designated sites, presenting the opportunity to limit adverse impacts at these locations.

We support recognition of the over-abstraction of water in this region as a serious concern. We welcome acknowledgement that action is required now to ensure the availability of water for future uses without detrimental impact on the environment. Natural England agrees that water resource availability and water quality are inter-related and that these are likely to be exacerbated by the effects of climate change.

The new Local Plan presents the opportunity for new development to come forward at the most appropriate locations in order to avoid detrimental impacts on biodiversity assets. However, we support recognition of potential risks to the ecological network including statutorily designated sites, through degradation and other impacts associated with development.

We agree that the new Local Plan provides the opportunity to promote biodiversity gain and to improve the overall ecological network. Natural England also agrees that opportunities identified through the Green Infrastructure Study (2020) could support delivery of Natural England's Habitat Network nearby opportunity zones and support pollinator corridors. Robust plan policies will need to be developed to secure delivery of these enhancements through all relevant development.

The report concludes that overall, the proposed direction of the Local Plan performs well in sustainability terms with a strong focus on providing an appropriate amount of development and policies focused on minimising carbon emissions, particularly through minimising the need to travel, using land efficiently and making the most of existing and planned sustainable transport links. Natural England suggests this is a premature conclusion in the current absence of strategic water supply infrastructure and sustainable interim measures. Development through the adopted strategy is already being progress without these measures in place. Further development of the Green Infrastructure Initiatives is also required to ensure adequate GI to meet development needs and to alleviate recreational pressures on some of our most sensitive sites habitats. Robust plan policies, to secure timely delivery of this strategic green infrastructure, will be required to demonstrate the Plan’s sustainability.

We generally welcome the policy recommendations presented within Chapter 5 of the SA report including reference to the mitigation hierarchy within Policy BG/BG: Biodiversity and geodiversity and stronger commitments to protect and enhance biodiversity within this and the site allocation policies. However, in our view SA recommendations should focus on the urgent requirement for the identification of strategic and interim water resource/infrastructure solutions and further work to progress the GI Initiatives into real projects.

Natural England will provide further advice as the SA is updated in line with the development of Plan policies and further evidence.

We hope our comments are helpful. For any queries relating to the specific advice in this letter only please contact Janet Nuttall on […]. For any new consultations, or to provide further information on this consultation please send your correspondences to consultations@naturalengland.org.uk.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59970

Received: 13/12/2021

Respondent: Natural England

Representation Summary:

Duty to Cooperate
Natural England welcomes consideration of how the Plan fits with other plans and strategies including cross boundary projects such as the Ox Cam Arc. We support recognition of the Plan to be prepared within a wider regional context noting the Councils’ legal duty to cooperate with key stakeholders and surrounding areas of cross boundary issues. We agree that the development of a clear and positive vision for the future of the Greater Cambridge area can help to shape the proposals for the Ox Cam Arc, noting that the outcome of the Oxford-Cambridge framework is currently awaited. We particularly support the Councils’ recognition that the water supply challenge discussed above is a serious issue to be resolved.

Full text:

Thank you for consulting Natural England on the above in your letter dated 1 November 2021.

Natural England is a non-departmental public body. Our statutory purpose is to ensure that the natural environment is conserved, enhanced, and managed for the benefit of present and future generations, thereby contributing to sustainable development.

Natural England’s key comments
We are pleased that many of our comments at the Issues and Options stage, in our letter dated 24 February 2020 (ref. 304246), are reflected in the First Proposals Plan, helping to strengthen the Plan’s approach to the ‘big themes’ including climate change, biodiversity and green spaces, wellbeing and social inclusion. Natural England supports the general thrust of the Plan in directing development to where it will have least environmental impact and provide opportunities for enhancements.

Natural England’s previous advice highlighted the need for the Plan to address uncertainties relating to water resources and infrastructure needed to support new growth, in light of evidence that current levels of abstraction are already damaging the natural environment. We also signalled the need for the establishment of a strategic green infrastructure network that is resilient to the scale of proposed Plan development, capable of meeting people’s needs and addressing adverse impacts to the natural environment. We therefore welcome that the First Proposals Plan recognises the challenges in identifying long-term and interim solutions to the current water resource crisis to enable sustainable development without further detriment to the natural environment. We support the Plan’s progress, through the Green Infrastructure Recommendations (LUC, September 2021), in presenting opportunities for the Plan to deliver /contribute towards delivery of strategic green infrastructure.

Notwithstanding the above, Natural England believes significant additional work is required through the next stages of Plan preparation to progress these ‘solutions’ and demonstrate that development can be delivered sustainably. We have major concerns with the scale of proposed Plan development, and the 2041 timeframe for delivery, given the damage already being inflicted on the natural environment and the lengthy lead-in time for identification and delivery of measures to address the water resource issue and to implement strategic green infrastructure. Some of this Plan development is already progressing, through the adopted strategy, prior to solutions being identified and implemented; the natural environment is already being impacted. The Plan should consider how these impacts and spiralling environmental deterioration can be retrospectively

mitigated.

The section on ‘Ensuring a Deliverable Plan – Water Supply’ recognises the challenge relating to water resources; however, the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions to ensure any level of proposed development is delivered sustainably. There are currently no measures in place to mitigate the adverse effects of current development on the natural environment i.e., more water is being abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat.

Potential solutions to address Greater Cambridge’s green infrastructure deficit, and the recreational pressure effects of development, lie within the Green Infrastructure Initiatives identified in LUC’s Opportunity Mapping Recommendations Report. Natural England fully supports the Initiatives identified; however, these aspirational areas must be progressed into real projects that are happening on the ground by the time the Plan is adopted. Robust Plan policy requirements should secure funding for the delivery and long-term management of these projects from all major development.

We have provided additional comments on the Plan’s key themes and policies below; however, reference should be made to the detailed advice provided in our response to the Issues and Options consultation.

Vision and aims
We support the Plan vision and aims for decreases in our climate impacts and increase in quality of life for communities, minimising carbon emissions and reliance on the private car, increases in nature, wildlife, greenspaces and safeguarding landscapes focusing on what is unique to Greater Cambridge embracing bold new approaches.

Natural England strongly recommends that the vision should advocate a more holistic approach to securing multi-functional benefits through the protection and enhancement of the natural environment. In accordance with paragraphs 17 and 109 of the National Planning Policy Framework (NPPF) the Plan should encourage multiple benefits from the use of land in urban and rural areas, recognising that land can deliver a wide range of ecosystem services required for sustainable development including climate change mitigation, flood management, improved water resources and water quality, biodiversity net gain, accessible high quality green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

The Plan should contribute to and enhance the natural and local environment by recognising the wider benefits of ecosystem services, considering a natural capital evidence approach and making strong links to the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

Development Strategy
The Plan will deliver around 44,400 new homes and provide for approximately 58,500 new jobs. We welcome that the new development strategy aims to meet our increased need for new homes in a way that minimises environmental impacts and improves the wellbeing of our communities.
The strategy proposes 19 additional sites for development, along with sites already allocated in the adopted 2018 Local Plans, along with associated infrastructure including green spaces.

We support proposals to direct development to where it has the least climate impact, where active and public transport is the natural choice, where green infrastructure can be delivered alongside new development, and where jobs, services and facilities can be located near to where people live. The vision includes creating new city neighbourhoods which have the critical mass of homes, jobs and services to create thriving communities, making best use of brownfield and safeguarded land and making the most of public transport links.

Natural England welcomes the use of evidence including the Employment Land and Economic Development Evidence Study and the Greater Cambridge Housing and Employment Relationships

Report to understand the relationship between future jobs and housing growth. We note that these studies found that planning for the standard method housing figure set by government would not support the number of jobs expected to arise between 2020 and 2041. Planning for this housing figure would risk increasing the amount of longer distance commuting into Greater Cambridge, with the resulting impacts on climate change and congestion. On this basis planning for a higher jobs figure and planning for government’s standard method local housing need figure have been rejected as reasonable alternatives.

We note that high-level consideration has been given to the potential impacts of COVID-19 on the economy of Greater Cambridge, to inform this First Proposals consultation. We support the proposal to gather evidence to consider the potential longer-term quantitative impacts of COVID- 19 prior to the Draft Plan stage to understand any implications for the objectively assessed need for jobs and homes for the plan.

Natural England has no objection in principle to the proposed Plan development strategy; however, this is subject to: 1) the identification of strategic water supply solutions and / or interim measures; and 2) development of deliverable strategic GI initiatives and developer requirements and funding mechanisms being secured through the Plan.

Policy S/DS: Development strategy
Figure 6: Map shows proposed sites to be included in the Plan including existing planning permissions alongside a limited number of new sites in the most sustainable locations. We welcome that the sustainability merits, opportunities and constraints for each of the nine potential strategy choices have been considered through the Sustainability Appraisal. Alongside considering the best locations for new homes and jobs, consideration has also been given to the best locations to restore the area’s habitat networks and provide more green spaces for people providing health and wellbeing benefits. Natural England fully supports the identification of 14 Strategic Green Infrastructure Initiatives, through the Green Infrastructure evidence, to help achieve this. We welcome the approach to preparing the preferred development strategy / draft allocations and green infrastructure initiatives in parallel.

We support the general policy direction to focus development where it will have the least climate impact, where it can be aligned with active and public transport, opportunities for delivery of green infrastructure and where jobs, services and facilities can be located nearby whilst ensuring all necessary utilities can be provided in a sustainable way. We support the approach to using less land for development to reduce carbon emissions and allow more space for nature and wildlife.
The strategy focuses on opportunities to use brownfield land and opportunities created by proposed major new infrastructure.

We note that delivery of the adopted strategy is progressing well with development permitted/underway /completed at the edge of Cambridge sites and new settlement sites including Northstowe and Waterbeach New Town. Natural England is aware that these schemes are being delivered in the absence of adequate sustainable water supply infrastructure to serve the development without adverse impact to the natural environment including statutorily designated sites. Many of these schemes are also unlikely to deliver sufficient level of accessible high quality green infrastructure to meet the needs of new residents without adverse recreational pressure impacts to the existing ecological network including statutorily designated sites. These issues need to be addressed urgently through further stages of Plan preparation as discussed in our advice above and below.

Ensuring a deliverable plan – water supply
We welcome the Councils’ recognition that water supply is a significant issue for the deliverability of the Local Plan and we fully support preparation of the Integrated Water Management Study: Outline Water Cycle (WCS) by Stantec (August 2021) to address this. The WCS has identified the need for new strategic water supply infrastructure, such as a new fens reservoir, to provide for longer term needs, and to protect the integrity of the chalk aquifer south of Cambridge, in addition to a range of interim demand management measures. The draft Sustainability Appraisal also identifies significant environmental impacts if the issue is not resolved. This is a major concern for

Natural England in light of proposed growth levels and the damaging effects that groundwater abstraction is already having on the natural environment including water-dependent designated sites and important chalk stream habitats. Natural England has provided its detailed advice on this matter, and highlighted the statutorily designated sites potentially affected, in our response to the consultation on the WCS. These ‘Designated Sites of Concern’ are listed in Appendix B of the August 2021 report.

We are aware that Water Resources East is currently preparing its Water Management Plan for the region and that this will help to identify long-term measures to address the issue. However, these strategic measures, including a new fens reservoir, are unlikely to be available until the 2030’s hence interim measures are required to enable some level of sustainable growth. We welcome the suggestion of including Plan policies to phase delivery of development that can be supported by a sustainable water supply until new strategic infrastructure is in place; however, it will need to be clearly demonstrated that interim solutions are sustainable and will not cause further environmental decline. The risk is that it may not be possible to demonstrate delivery of the full objectively assessed needs within the plan period.

Natural England appreciates that pressure on water supplies is a regional issue. We share the Councils’ aspirations that the water industry, supported by government, will set out its intentions for positively addressing this key infrastructure issue at an early point in the ongoing plan making process, to provide confidence that adequate water supply will be available to support delivery of the preferred options allocations, before the next stage of a full draft Local Plan. In our view the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions, including demand management measures, to ensure any level of proposed development is delivered sustainably.

We have serious concerns that Plan development is already being progressed, through the adopted strategy, without sustainable water supply measures in place. More water will be abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat. The Plan will need to consider the impacts of this development and identify measures to address adverse environmental impact.

Natural England fully supports the concerns raised by the Environment Agency, as lead authority on this matter, including the high degree of uncertainty as to whether sufficient sustainable water supplies can be provided for the proposed growth over the plan period without further detriment to the natural environment. Further development of the WCS, informed by evidence from regional and water company water resource plans, will need to demonstrate that appropriate deliverable mitigation measures can support sustainable growth until new strategic water supply infrastructure becomes operational. We agree with the Environment Agency that it in the face of current challenges it may be appropriate to consider an extended timeframe for delivery of Plan development to limit further environmental degradation until new strategic measures become available. This would allow further time for the identification of truly sustainable options that build in resilience to climate change and robust mitigation and monitoring measures to address impacts to the natural environment and restore habitat condition.

Duty to Cooperate
Natural England welcomes consideration of how the Plan fits with other plans and strategies including cross boundary projects such as the Ox Cam Arc. We support recognition of the Plan to be prepared within a wider regional context noting the Councils’ legal duty to cooperate with key stakeholders and surrounding areas of cross boundary issues. We agree that the development of a clear and positive vision for the future of the Greater Cambridge area can help to shape the proposals for the Ox Cam Arc, noting that the outcome of the Oxford-Cambridge framework is currently awaited.

We particularly support the Councils’ recognition that the water supply challenge discussed above is a serious issue to be resolved.

Natural England will be pleased to engage with the Councils in the preparation and development of a draft Statement of Common Ground.

Transport Strategy
Natural England welcomes that the proposed strategy is heavily informed by the location of existing and committed public transport schemes. We support the use of transport modelling to understand whether additional infrastructure and policies are required to address the transport impacts of the preferred development strategy.

Transport policies should include requirements for projects to undertake robust ecological impact assessment and application of the ecological mitigation hierarchy.

Site allocation policies
Proposed site allocation policies are described through sections 2.2 – 2.5. Natural England has no objection in principle to the existing and new allocations, areas of major change or opportunity areas being taken forward for development. However, this is subject to:
• identification of strategic water supply infrastructure and/or feasible interim solutions to demonstrate that development can be delivered sustainably and without adverse impact to the natural environment;
• establishment of a framework and robust plan policies to deliver the 14 Strategic Green Infrastructure initiatives ahead of development, to meet development needs and to address the effects of recreational pressure on sensitive sites and habitats.

The site allocation policies will need to include robust requirements to secure delivery of biodiversity net gain and on-site accessible green infrastructure to meet people’s need and to contribute towards the Plan’s 20% BNG targets and delivery of the Nature Recovery Network / Cambridge Nature Network. Our advice is that major allocation policies should set a framework for development to maximum opportunities for environmental gains.

Climate Change
We welcome the proposed policies relating to net zero carbon and water efficiency, designing for climate change, flooding and integrated water management, renewable energy projects, reducing waste and supporting land-based carbon sequestration. We particularly support the proposed requirement for residential developments to be designed to achieve a standard of 80 litres/person/ day; however, we support the Environment Agency’s concerns as to whether the Plan is likely to achieve the reductions in demand required to support sustainable growth. As indicated above the WCS will need to demonstrate how water, to meet growth needs, will be supplied sustainably without adverse impact to the natural environment.

Proposed requirements for developments to provide integrated water management, including sustainable drainage systems (SuDS) where possible and for SuDS and green /brown roofs to provide multiple benefits (including biodiversity and amenity) are welcomed.

We support requirements for renewable energy projects to consider impacts on biodiversity, geodiversity, landscape and water quality.

Natural England welcomes a proposed policy to support the creation of land and habitats that play a role as carbon sinks and protect existing carbon sinks from development, particularly peatlands such as those remaining in the north of South Cambridgeshire district. We welcome recognition of the importance of peatlands as a carbon store and the role of other habitats such as woodlands and grasslands, noting loss and degradation of natural habitats results in the direct loss of carbon stored within them.

As indicated above we recommend that the Plan takes a more holistic approach to securing multi- functional benefits for climate change, flood management, water resources and water quality through the protection and enhancement of the natural environment. Natural solutions can achieve significant additional benefits for biodiversity, green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

Biodiversity and green spaces
We strongly support the proposed biodiversity and green spaces policies and the inclusion of Figure 53 depicting the existing Greater Cambridge green infrastructure network including designated sites.

We welcome that these policies will help to deliver the aims of the Ox Cam Arc of doubling the area of land managed primarily for nature and to deliver a minimum 20% biodiversity net gain on development sites, beyond the mandatory 10% biodiversity net gain requirements of the Environment Act 2021. We agree that Greater Cambridge has a relatively low level of designated sites and priority habitats, highlighting the need for development to deliver net gains beyond the 10% proposed nationally, hence we are fully supportive of minimum 20% BNG ambitions. Our advice is that the Councils, working with key partners, should identify BNG opportunities through the next phases of Plan preparation. This should take the form of a BNG opportunities / requirements map building on the foundations of the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

The Councils should also set a landscape / GI framework for the Site Allocations to maximise opportunities for delivery of GI and BNG within the development sites.

BG/BG: Biodiversity and geodiversity
Natural England fully supports this policy and requirements for development to achieve a minimum 20% biodiversity net gain, delivered on site where possible and calculated using the Defra Metric
3.0 or its successor. Requirements for off-site measures to be consistent with the strategic aims of the Greater Cambridge green infrastructure network strategic initiatives are welcomed.

The policy should take a natural capital evidence approach and recognise the wider benefits of ecosystem services for climate change, flood risk management, green infrastructure and health and wellbeing, in addition to biodiversity. They main thrust of this policy should be the Plan’s contribution to the Nature Recovery Network / Cambridge Nature Network and the establishment of a framework for the development of a Local Nature Recovery Strategy.

We support proposed requirements for development to avoid adverse impact to site of biodiversity or geological importance and development to mitigate recreational pressure on statutorily designated sites, applying Natural England’s SSSI Impacts Risk Zones (IRZs). The Plan’s biodiversity policy should recognise the hierarchy of international, nationally and locally designated sites across Greater Cambridge. This should be accompanied by a map of the existing ecological network and enhancement opportunity areas to guide site allocations / development away from more sensitive areas and to identify opportunities for developers to deliver net biodiversity gain enhancements.

We welcome that the policy will seek wider environmental net gains. These should focus on measures to restore ecological networks, enhance ecological resilience and provide an overall increase in natural habitat and ecological features.

Reference should be made to the detailed advice provided in our response to the Issues and Options consultation with regard to protecting and enhancing biodiversity including designated sites, priority habitats, ecological networks and priority and/or legally protected species populations. This includes additional detailed advice on embedding biodiversity net gain into the Greater Cambridge Local Plan policies.

BG/GI: Green infrastructure
We welcome the comprehensive and thorough approach taken in developing the GI evidence base for the Greater Cambridge Local Plan, including the Opportunity Mapping and the identification of 14 Strategic GI initiatives. The multifunctional benefits of GI are fully recognised, as well as the links between GI provision and the delivery of other strategic policy areas including the wider natural environment, sustainable transport and social inclusion. These threads/links

should continue through future drafts to ensure the value of GI for people and the natural environment is fully reflected in the Local Plan.

The Strategic GI initiatives are comprehensive and capture a wide variety of GI opportunities within the 14 proposals; this range of GI elements and habitats will help to maximise benefits for people and nature through the strategic planning and delivery of GI across Greater Cambridge. We support the emphasis given to blue infrastructure in Strategic Initiatives 1 and 2 given the considerable pressures on Cambridgeshire’s chalk streams and aquifer from agriculture and development. The Chalk Stream Strategy Report1 recently published by CaBA identifies a number of recommendations to protect/restore chalk stream habitats, including those in areas of high population density such as Cambridge. This report may be a useful reference in planning and progressing strategic blue infrastructure initiatives as part of the Greater Cambridge Local Plan.

We support the proposed approach to have a distinct GI policy within the Local Plan, rather than a stand-alone SPD. As noted in the Topic Paper, we agree that the policy should require all developments to contribute towards GI and that it should be incorporated into design from an early stage and through all phases of development, with a longer-term plan in place for its management and maintenance. As well as a GI policy, Green Infrastructure should be integrated into other strategic policy areas and Local Plan themes where relevant. This will give weight to the multifunctional role of GI and demonstrate where it can contribute to policy delivery and outcomes (e.g., in climate change adaptation, supporting healthy communities etc). It will also support the role of GI in implementing other mechanisms and tools, such as Biodiversity Net Gain, and may help in targeting and prioritising opportunities for GI creation and enhancement.

In addition to securing GI within individual developments, the Local Plan should also provide a framework for proposals to contribute to / link up with the wider Strategic Initiatives, including the ‘dispersed initiatives’ 10-14 (e.g., ‘Expanding the Urban Forest’). Consideration should also be given to potential join-ups on cross-boundary projects and, in time, how the strategic GI network in Greater Cambridge may contribute to greenspace at the regional level (as one of the 5 Ox-Cam counties). There may also be overlaps with other initiatives, such as the Nature Recovery Network, where Cambridgeshire’s GI resource can make an important contribution (such as that highlighted in Strategic Initiative 3 for the Gog Magog Hills and Chalkland fringe).

We note from the Part 2 Recommendations Report that there are several points for further consideration, including the funding mechanisms required to ensure that all developments include GI and contribute towards the strategic initiatives. Funding mechanisms (e.g., developer contributions) should be embedded in policy where required and should be identified as early as possible to ensure that benefits are secured long-term. For example, the policies for major allocations will need to include specific requirements for the funding / delivery of the strategic GI ahead of the developments being occupied so that these are clear from the outset. The report presents a number of potential funding sources, including land use planning obligations (e.g., S106) agri-environment streams (such as ELMS) and any ad-hoc opportunities that may arise through partnership working. The increasing emphasis on nature-based solutions may also bring in new revenue streams to support strategic projects, given that many NBS will require a landscape scale / ‘ecosystem’ approach. The costings for the delivery of the GI and biodiversity aspects of the Local Plan could be included in the IDP so that the investment required to bring about delivery is clear and transparent from an early stage and factored into development proposals. Given the significant scale of the work required, consideration should also be given to how the land will be secured to deliver the GI initiatives, whether through direct purchase, lease or management agreements. A long-term approach to the management and maintenance of GI (ideally in perpetuity) also needs to be factored in from an early stage.

Alongside its value for natural capital and placemaking, green infrastructure provides alternative natural greenspaces that can help alleviate and buffer recreational pressures on protected sites. We welcome the recognition of the recreational pressure impacts across Greater Cambridge, and

1 1 Catchment Based Approach (October 2021) Chalk Stream Restoration Strategy: Main Report. See: New strategy launched to protect chalk streams - GOV.UK (www.gov.uk)

the Strategic Initiatives aimed at addressing these (e.g., the Coton corridor and multifunctional GI corridors, Strategic Initiatives 7-8). We support the development of clear policy requirements to address these significant pressures (as suggested in the Topic Paper).

Given the Local Plan’s strong emphasis on GI and the widespread benefits that it can achieve, we feel there is clear value in having a recognised GI standard in place. A standard would help to guide and inform GI planning and delivery and provide a consistent benchmark on quality across different scales/locations of development. It would also support the recommendation in the report for a GI-led design approach to new development. A standard could be supported by other documents, e.g., Local Design Guides, to ensure that nature is fully built into design through the provision of high-quality green infrastructure. Natural England is currently developing a Green Infrastructure Framework to set standards for green space and access to natural greenspaces, as well as a Design Guide and mapping data2 to support this work. We would encourage the use of these resources to guide and inform development of strategic Green Infrastructure and policies for Greater Cambridge. The Framework of GI Standards and products are due for launch in summer/autumn 2022, with a pre-release of the beta mapping and the principles of good green infrastructure in December 20213.

Natural England fully supports the proposed inclusion of policies to improve tree canopy cover, enhance river corridors and protect and enhance open spaces. We advise that robust policy requirements should be included to secure delivery of enhancements through development to ensure the achievement of multi-functional benefits for climate change, biodiversity, water quality, access. As indicated in our comments at the Issues and Options stage tree planting needs to be targeted in appropriate locations and considered in the context of wider plans for nature recovery. Consideration should be given to ecological impacts and the opportunities to create alternative habitats that could deliver better enhancements for people and wildlife, and store carbon effectively. Where woodland habitat creation is appropriate, consideration should be given to natural regeneration, and ‘rewilding’ for the economic and ecological benefits this can achieve.
Any tree planting should use native and local provenance tree species suitable for the location. Natural England advocates an approach which seeks to increase biodiversity and green infrastructure generally, not simply planting of trees, and protecting / enhancing soils, particularly peat soils.

For further advice and guidance on green infrastructure please refer to our comments at the Issues and Options consultation stage.

Wellbeing and inclusion
Natural England is fully supportive of the proposed policies including WS/HD: Creating healthy new developments. Our advice is that the policy should include strong links to the importance of adequate level and quality of accessible green infrastructure for people’s physical and mental health and wellbeing.

Great places
Natural England supports the proposed Great Places policies. We welcome the establishment of a Place and Design Quality Panel to conduct a site typologies study to understand, protect, utilise and enhance the valued characteristics of different areas in the plan, with the intention of using this information to raise design standards to ensure development reflects and enhances Cambridge’s distinctive landscape and townscape character.

We support Policy GP/LC Protection and enhancement of landscape character. Natural England is pleased to see that the Greater Cambridge landscape character assessments have been updated and will provide an up-to-date evidence base for the development of policy GP/LC. Existing retained policies form the South Cambridgeshire Local Plan NH/1, NH/2 and NH/13 and policy 8 of the Cambridge Local Plan should be reviewed and updated in the light of these updated landscape

2 See the GI Framework Mapping Portal: https://designatedsites.naturalengland.org.uk/GreenInfrastructure/Home.aspx 3 How Natural England’s Green Infrastructure Framework can help create better places to live - Natural England (blog.gov.uk)

character assessments to ensure they reflect the most recent baseline evidence.

Policy GP/LC seeks to identify, protect and enhance locally valued landscapes. Any locally designated landscapes, e.g., Areas of Greater Landscape Value, should be identified within the plan and given appropriate policy protection to protect and enhance them and to ensure that development reflects their distinctive character. It is not the role of Natural England to define locally valued landscapes – this is for LPAs and their communities. However, it should be noted that NE considers World Heritage Sites designated for their natural interest, local landscape designations and Inheritance Tax Exempt land to be locally valued. Therefore, these areas should be identified and included on policy maps showing locally designated landscapes along with any ‘Protected views’.

The Strategic Spatial Options Assessment appears to have considered a wide range of options based on up-to-date evidence on landscape and townscape character considerations. We support this approach which is useful in identifying and considering key landscape issues early in the Plan- making process, to feed into the Sustainability Appraisal. We note that the appraisal of the strategic spatial options is based on the interim draft findings of the emerging Landscape Character Assessment. We trust that the preliminary conclusions will be updated following completion of this work. The analysis also notes that recommendations are provided for strategic landscape mitigation and enhancement for each of the strategic spatial options. Natural England supports the proposal to identify specific mitigation as part of more detailed studies in locating and designing future development.

We are generally supportive of policies to protect and enhance the Cambridge Green Belt, achieve high quality development and establish high quality landscape and public realm.

Jobs
Natural England supports proposed policy J/AL: Protecting the best agricultural land. We welcome recognition of soil as a valuable resource and key element of the environmental ecosystem which requires protection, in accordance with paragraph 174 of the NPPF. We note that the protection of peat soils is addressed under the climate change theme discussed above.

Beyond the wider water resource / supply issue, discussed above, we have no substantive comments on the other proposed policies. However, policies will need to include appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Homes
Beyond the wider water resource / supply issue we have no specific comments to make on these proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity. Residential development should also contribute towards delivery of the Strategic GI Initiatives.

Infrastructure
Natural England supports proposed policy I/ST: Sustainable transport and connectivity for the environmental and health benefits this could achieve including reduced emissions, air quality and climate change benefits.

We have no substantive comments on the other proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Habitats Regulations Assessment (HRA)
Natural England supports preparation of the HRA Report by LUC (August 2021). We welcome that this incorporates a screening assessment and Appropriate Assessment. The Screening stage

identifies likely significant effects on European sites, either alone or in combination with other policies and proposals, for several plan policies. These include:
• Physical damage and loss (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Non-physical disturbance (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Recreation – in relation to Wicken Fen Ramsar SAC and Fenland SAC.
• Water Quantity and Quality – in relation to Ouse Washes SAC, SPA and Ramsar site, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC.
The Appropriate Assessment concludes no adverse effect on site integrity as follows: Eversden and Wimpole Woods SAC
Subject to the following safeguards and mitigation measures being implemented:
• Completion of bat surveys for site allocations identified with moderate or high potential to support barbastelle to determine the ecological value of these sites in relation to this bat species and to inform specific mitigation proposals.
• There is a commitment in the plan that proposed development will avoid key habitat features likely to be used by this species and to create and enhance suitable habitat for this species.
• It is also recommended that policy wording in the plan is strengthened to include specific inclusion of the safeguard measures detailed above and that Policy BG/BG Biodiversity and geodiversity is strengthened to include specific reference that mitigation provided should be suitable to the level of protection afforded to designated sites.

Wicken Fen Ramsar site and Fenland SAC
The Appropriate Assessment concludes no adverse effect on integrity as a result of increased recreational pressure provided that the following safeguards and mitigation measures are required by the plan and successfully implemented:
• A commitment in the plan to ensure that development within 20km of the Ramsar site and SAC to provide sufficient suitable alternative natural greenspace in line with advice from Natural England and that there should be specific detail on the policy on the appropriate quantity and quality of open spaces and how delivery and management in perpetuity will be secured.

The Appropriate Assessment is currently unable to conclude no adverse effect on the integrity of the Ouse Washes SAC, SPA and Ramsar, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC, with regard to water quantity and quality, pending the provision of further evidence through the Greater Cambridge IWMS and the WRE IWMP.

We welcome that the HRA has provided a detailed consideration of air quality impacts, associated with Plan development, for the relevant European sites. This is based on best practice Highways England Design Manual for Road and Bridges (DMRB) LA 105 Air quality guidance and considers the potential for traffic-related emissions on the affected road network based on traffic modelling data, in line with the advice provided by Natural England at the Issues and Options stage. Whilst the assessment has ruled out likely significant effects on all relevant European sites Natural England has been unable to carry out a detailed review of this information and will provide comments at the next stage of Plan consultation.

Please note that Natural England is reviewing the Impact Risk Zone (IRZ) for Eversden and Wimpole Woods SAC to take into account the findings of emerging SAC barbastelle tracking surveys being undertaken for major development schemes. It will also take into consideration the availability of suitable foraging resource which is considered to be quite scarce in the local area. In the meantime, until the IRZ is formally amended, and accompanying guidance prepared, we welcome application of a precautionary 20km buffer zone for SAC barbastelles in line with Natural England’s current local guidance.

Natural England is generally supportive of the interim findings of the HRA and will provide further

advice as the HRA is updated in line with the development of Plan policies and further evidence.

Sustainability Appraisal
Through the Sustainability Appraisal (LUC, October 2021) the preferred policy approaches for the Local Plan have been subject to appraisal against the SA objectives. A range of reasonable alternative options has also been assessed, including alternatives to the preferred policy approaches, Strategic Spatial Options and site options. We welcome that the findings of the HRA will be incorporated into the SA and will provide further insight into biodiversity impacts specifically at designated sites, presenting the opportunity to limit adverse impacts at these locations.

We support recognition of the over-abstraction of water in this region as a serious concern. We welcome acknowledgement that action is required now to ensure the availability of water for future uses without detrimental impact on the environment. Natural England agrees that water resource availability and water quality are inter-related and that these are likely to be exacerbated by the effects of climate change.

The new Local Plan presents the opportunity for new development to come forward at the most appropriate locations in order to avoid detrimental impacts on biodiversity assets. However, we support recognition of potential risks to the ecological network including statutorily designated sites, through degradation and other impacts associated with development.

We agree that the new Local Plan provides the opportunity to promote biodiversity gain and to improve the overall ecological network. Natural England also agrees that opportunities identified through the Green Infrastructure Study (2020) could support delivery of Natural England's Habitat Network nearby opportunity zones and support pollinator corridors. Robust plan policies will need to be developed to secure delivery of these enhancements through all relevant development.

The report concludes that overall, the proposed direction of the Local Plan performs well in sustainability terms with a strong focus on providing an appropriate amount of development and policies focused on minimising carbon emissions, particularly through minimising the need to travel, using land efficiently and making the most of existing and planned sustainable transport links. Natural England suggests this is a premature conclusion in the current absence of strategic water supply infrastructure and sustainable interim measures. Development through the adopted strategy is already being progress without these measures in place. Further development of the Green Infrastructure Initiatives is also required to ensure adequate GI to meet development needs and to alleviate recreational pressures on some of our most sensitive sites habitats. Robust plan policies, to secure timely delivery of this strategic green infrastructure, will be required to demonstrate the Plan’s sustainability.

We generally welcome the policy recommendations presented within Chapter 5 of the SA report including reference to the mitigation hierarchy within Policy BG/BG: Biodiversity and geodiversity and stronger commitments to protect and enhance biodiversity within this and the site allocation policies. However, in our view SA recommendations should focus on the urgent requirement for the identification of strategic and interim water resource/infrastructure solutions and further work to progress the GI Initiatives into real projects.

Natural England will provide further advice as the SA is updated in line with the development of Plan policies and further evidence.

We hope our comments are helpful. For any queries relating to the specific advice in this letter only please contact Janet Nuttall on […]. For any new consultations, or to provide further information on this consultation please send your correspondences to consultations@naturalengland.org.uk.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59990

Received: 08/12/2021

Respondent: Mr Jeremy Tanner

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of "levelling up", and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of "levelling up", and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59993

Received: 08/12/2021

Respondent: Mary Taylor

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59994

Received: 13/12/2021

Respondent: Mrs Hannah Thomas

Representation Summary:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing in a personal capacity to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60000

Received: 10/12/2021

Respondent: Ms Clara Todd

Representation Summary:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Full text:

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60037

Received: 06/12/2021

Respondent: Friends of the Cam Steering Group

Number of people: 10

Representation Summary:

Friends of the Cam strongly object to the level of growth proposed in the new Draft Local Plan on the following grounds:
Inadequate water supply;
Effect on national food security;
Failure to minimise climate change;
Likely irreparable damage to ecosystems;
Carbon emissions resulting from construction;
Lack of an integrated public transport system;
Undermining of the Government's policy of ‘levelling up’; and,
Democratic deficit in the process and evidence base.
We provide evidence for each of these reasons.

Request Draft Local Plan is rejected, rewritten and re-submitted for full public consultation.

Full text:

6th December 2021
To: Greater Cambridge Shared Planning Service
c/o Cambridge City Council,
PO Box 700,
Cambridge CB1 0JH
and
c/o South Cambridgeshire District Council,
South Cambridgeshire Hall,
Cambourne Business Park,
Cambourne,
Cambridge CB23 6EA
Ref: Consultation Response - Draft Local Plan
Friends of the Cam strongly object to the level of growth proposed in the new Draft Local Plan on the
following grounds: inadequate water supply, effect on national food security, failure to minimise climate
change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an
integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a
democratic deficit in the process and evidence base .
We provide evidence for each of these reasons below.
Inadequate Water Supply
Cambridge City and South Cambridgeshire already have an unsustainable supply of potable water. In August
2020, the Environment Agency, in response to a query on the viability of water supply to Northstowe Phase
3A wrote to Monica Hone that 'current levels of abstraction are causing environmental damage. Any
increase in use within existing licenced volumes will increase the pressure on a system that is already failing
environmental targets', and 'many waterbodies did not have the flow to support the ecology.'
On the 1st July 2021, DEFRA announced that chalk streams would be given enhanced environmental
protection, and published the Environment Agency document titled “Water stressed areas – final
classification 2021” which included the fact that the supply areas of Cambridge Water and Anglian Water are
areas of serious water stress, page 6.
According to Appendix 3, Cambridge Water needs to reduce abstraction by 22 megalitres per day from levels
current at 1st July 2021, and Anglian Water needs to reduce abstraction by 189 megalitres per day from
levels current at 1st July 2021.
Friends of the Cam
contact@friendsofthecam.org
Yet, one of Anglian Water’s proposed ‘solutions’ to this problem is to pump water from North Lincolnshire,
which is also classified by the Environment Agency in the above report as a water stressed area.
Inadequate Wastewater Infrastructure
Nearly all the growth suggested in the Draft Local Plan will lead to new building with an associated increase
in the area of artificial surfaces. Of course the developers will claim this can be off-set by the use of badly
designed Sustainable Drainage Systems, SuDS. These are often artificial bodies of pondwater constructed
close to developments. It is essential that safe and effective, design and implementation of SuDs is
adequately enforced.
The local sewage system is currently inadequate. The inadequacy of the sewage system is evidenced by the
number of sewage spills by smaller Anglian Water sewage works into the Cam Valley. Currently, there are no
plans to improve failing combined sewer overflows (csos), just promises to monitor them more accurately.
The Cam Valley upstream of Cambridge saw 622 hours of untreated waste water enter the rivers in 2020, yet
Anglian Water is proposing to move the one sewage works in the area which has been upgraded and has
sufficient capacity until 2050, the main Cambridge works, into the Green Belt and to spend at least £227
million of public money to do so.
To date there have been no upgrades at any of the smaller works in the area while more and more taps are
still being connected. The Environment Agency has already warned at least one Cambridgeshire local
planning authority, East Cambs District Council, that they must stop looking at the sewage requirements of
single planning applications and instead look at the cumulative effects.
Threat to National Food Security
According to the government the UK currently imports 45% of its food, however, some sources estimate this
to be as much as 8 0% . An accepted value used frequently in the press is 60%.
According to the NFU, the Fens produce one third of England’s fresh vegetables, 20% of England’s potatoes,
more than 20% of England’s flowers and bulbs, 20% of England’s sugar beet as well as a significant
percentage of the country’s cereal, oilseed rape and protein crops. Agriculture employs 80,000 people and
produces £3bn pa for the rural economy.
Farmers can only produce this food if there is water available for irrigation, if the land is protected for food
security and is not sold to developers or covered in solar panels. The national food supply will be severely
reduced and much of it completely lost if there is further inward migration to Cambridgeshire. Firstly, there
will be a tragic loss of the best and most versatile land due to building and secondly, there will be a further
demand on the available water supply. Both effects will be due to the proposed unsustainable growth as a
further 100,000+ people (based on the addition of 49,000 houses multiplied by average UK household of
2.4) are drawn to the area using a further 16 megalitres of water per day, (based on a realistic 140 litres per
person per day).
Furthermore, the Fens are at increasing risk of annual and eventually permanent flooding. See next section
below.
As can be seen from NFU figures, when the Fens do flood, the national food supply will be reduced by an
estimated 20 – 25%.
Sea level rise
Large areas of Cambridgeshire, including parts of the City of Cambridge, are subject to continuously
increasing flood risk. Indeed, not only is sea level rising, the rate of sea level rise is increasing rapidly. For
many years, since measurement began, sea level in the Wash was rising at a rate of 3mm per year. In 2019 it
was measured by the Environment Agency in the Wash, and confirmed by IPCC figures globally, that the
annual rate was now 3.3mm per year. In 2014, the IPCC report estimated a sea level rise of 1 metre by 2100.
In 2019, the IPCC increased this estimate to 1.1 metres by 2100. In 2021, the IPCC has increased its estimate
again, to a terrifying 2.4 metres by 2100. Meanwhile, the meteorological partnership Climate Central
estimates a 4.7 metre sea level rise by 2100 if global temperatures rise by 2°C. Both the IPCC 2021 and the
COP26 leadership have confirmed that the world is currently on track for a 2.4°C global temperature rise.
The other solution to Cambridgeshire’s water shortages being proposed by Water Resources East and
Anglian Water is to build two reservoirs in the Fens, one in South Lincolnshire, the other in Cambridgeshire
near the River Great Ouse. However, there is little point in building reservoirs in the Fens when it is clear
that there is a high risk they will be flooded by saline water within decades. This greenwash simply won’t
wash.
As flood risk increases, the Fens will initially be subject to occasional and then annual flooding caused by
water in its tidal rivers meeting increased volume of run-off from development. Eventually, the tidal inflow
will prevail and flooding will become permanent as the sea level inexorably increases. However, even the
first stage will have a significant negative effect on agriculture. The Treasury Green Book assumes loss of
cropping for one year if sea water inundation occurs. In fact, as was found in the 1947 and 1953 floods,
reduced crop yields last up to seven years due to the presence of a nematode in sea water.
Irreparable Damage to Ecosystems
Contrary to the widely touted propaganda that somehow 'development will help nature thrive', evidence
shows that any increase in artificial surfaces, such as buildings and roads, leads to a decrease in water in the
environment. Development also leads to a decrease in the amount of land that can absorb rainwater and
recharge water bodies. According to the Royal Horticultural Society, 70% of ponds have been lost from the
UK countryside since 1970. The River Cam has lost on average half its flow. In 2019, the River Granta dried
up completely. Freshwater biodiversity populations have declined by 84%.
Concepts such as 'doubling nature', Biodiversity Net Gain (BNG) and Natural Capital Accounting (NCA) are
being used as bargaining chips in the developers' casino that broadly amounts to saying, 'No development
means no funding for nature'. This is the antithesis of John Lawton's 2010 plea in 'Making Space for Nature'
of significant funding for Nature conservation without any strings attached.
The concept of doubling nature is ill-defined - doubling what, exactly? The Draft Local Plan needs to define
exactly how the concept will be understood and measured.
The global experience of Biodiversity Net Gain, reviewed by zu Ermgassen of DICE, University of Kent, is
that it fails twice as often as it succeeds, even though it had the lower bar of No Net Loss, NNL rather than
BNG.
The same group more recently showed that 95% of early-adopters of BNG practices in England are carrying
out on site offsetting (something not covered at all in the new Environment Law), where the developer is the
judge, jury and executioner of any offsetting plans. In any case, on site offsetting will not encourage many
forms of wildlife and will be prone to the dog-fouling and trampling that harms many wildlife areas, even
those remote from housing. Meanwhile, off-site off-setting is already damaging local communities in some
rural areas.
Natural Capital Accounting is an untested concept. The monetary assessment of ecosystem services (the
'yields') is recognised as being inadequate at present, while assessing the monetary value of ecosystem stocks
is more or less impossible (Ian Bateman, communicated to David Rogers). Yet the resulting monetary
assessments may be used to trade away environmental for economic assets with a greater yield, for example
a factory in a water meadow.
The natural environment is our vital life support system, and it is a dangerous delusion to imagine that it can
be rendered easily into any economic framework, let alone the pre Dasgupta framework that gives GDP/GVA
primacy over all other forms of stocks and yields.
Dasgupta defines wealth as the sum of natural, human and economic capitals and yields, and sustainability as
the condition where this sum is either stable or increasing. Economic growth at the expense of natural capital
and yields is therefore unsustainable.
We request that the Cambridge Local Plan adopts the Dasgupta definition of sustainability, i.e. definitely not
the NPPF's false definition of 'sustainability', with the caveats mentioned above, especially the false or
under-valuation of natural capital. This would provide a better starting point, and the Plan should be
reworked in this context.
Carbon Emissions arising from Development
The Draft Local Plan does not follow a 'brownfield first' approach. It is therefore not consistent with national
government policy as expressed repeatedly, recently by the Prime Minister.
Greenfield building maximises carbon emissions. The Local Plan should be encouraging Cambridge
businesses to move north where there are up to 1 million empty homes and space for 1.3 million more on
registered brownfield sites. Old airfields such as those being developed in Cambridgeshire are not true
brownfields; only their disused run-ways and any associated buildings are and the former could be easily
cleared and used as a source of recycled aggregate. Most of the former Bourn airfield is productive farmland.
The massive building and infrastructure programme contained in the Draft Local Plan breaches all
obligations for sustainable development.
Embodied carbon emissions are ignored in the Plan. Cement manufacture contributes 8% of global carbon
emissions which is more than three times the impact of aviation fuel. Iron and steel production accounts for
another 8%. Between them they account for more emissions than the USA and are second only to China as
greenhouse gas emitters.
According to the recent Cambridge and Peterborough Climate Commission report, at the present rate the
Region will have used up all of its carbon budget, allocated to meet its legal obligation to reach zero carbon
by 2050, in less than six years; due to the level of planned growth, emissions will accelerate further. The
obvious conclusion is that all unsustainable growth has to be curbed.
The Climate Change Committee has argued in its 2018, 2019 and 2020 Annual Reports to Parliament that
UK local and imported emissions arising from construction (the UK imports most of its building materials,
even the bricks are made in Belgium or Holland), must be reduced if the UK is to meet its now legal
emission targets.
No Plan for Integrated Public Transport
Climate change should be the single most important consideration in all aspects of transport planning and
operation, and the Draft Local Plan fails to do this.
Indeed, the current local government structure in Cambridge and South Cambridgeshire with four different
authorities claiming responsibility for some aspects of transport planning and delivery, coupled with the
divided responsibility for rail infrastructure between Network Rail and East West Rail Company Ltd, is an
impediment to any form of joined up thinking about transport.
Annual Reports to Parliament by the Climate Change Committee have consistently made the point that
‘Surface Transport’ is the greatest source of greenhouse gas emissions in the UK. Therefore, all transport
planning should:
(a) seek to minimise all forms of travel by discouraging commuting and leisure travel and encouraging
use of digital communications,
(b) where travel is essential, encourage active travel and/or use of public transport,
(c) provide carbon efficient forms of public transport, particularly light rail and heavy rail on the most
heavily used routes.
Road widening and road building proposals should be abandoned with immediate effect. The only
consideration for any road layout changes, other than road safety, should be the question “Will it reduce net
carbon emissions from construction and use?”. Clearly, some small schemes which ease traffic flow will
reduce emissions from acceleration, but those that increase road use will not.
Levelling Up
Major investment in the Cambridge area contradicts government policy to ‘level up’, even within
Cambridgeshire.
Whilst it is true that some of the most affluent areas include some of the most deprived communities, it is
disingenuous to claim that ‘levelling up’ should be about decreasing inequality within economically
successful areas, at the expense of other regions of the country where there is far more deprivation.
Re-using and upgrading the approximately 1 million empty homes, many of which are in deprived areas such
as the former industrial towns and cities in the North, and building another 1.3 million homes on the
registered brownfield sites across the country, will reduce carbon emissions from construction massively and
speed up delivery - on average by around six months for brownfield sites according to research by CPRE.
Democratic deficit in the process and evidence basis
Water Resources East have stated that their regional water plans align with the Government's plans for
growth. Sewage in rivers and chalk streams is a matter of national concern, yet Water Resources East say that
sewage is not part of their remit.
Meanwhile, the public consultation for the Draft Local Plan is taking place now, yet the consultation for the
Regional Water Plan is not due until summer 2022. The public and councillors are forced to respond to Local
Plan proposals with no idea whether, and if so, how, the water and sewage challenges can be resolved or
what trade-offs have been proposed.
South Cambs. MP Anthony Browne has rightly expressed concerns about the Local Plan process and about
water issues and transparency.
Water Resources East was established by Anglian Water which, is under investigation for sewage pollution.
Anglian Water is also promised £227 millions of tax-payers’ money to re-locate a fully functioning, recently
modernised, sewage treatment plant into the Green Belt. This move is not for operational reasons, but to
facilitate employment-led growth which requires taking the Green Belt from three medieval Cam Valley
villages. This will be the subject of only a partial public inquiry because it has been submitted as a National
Infrastructure project in order to minimise public scrutiny.
The Draft Local Plan has been prepared by the Greater Cambridge Shared Planning Service, but it appears to
be inordinately influenced by the unelected Greater Cambridge Partnership which has business interests and
ambitions represented on its board and but no counteracting residents’ interests.
Much of the text of the Draft Local Plan appears to be consistent with announcements made by the selfappointed
Arc Leaders Group promoting the so-called Ox-Cam Arc. This flawed concept has been criticised
for lack of transparency or accountability right across the five affected counties and one county,
Buckinghamshire, has withdrawn entirely from this completely undemocratic, self-selecting, body.
Conclusion
This is the wrong Plan at the wrong time. There are climate, biodiversity and water emergencies globally and
locally. Local government should not be planning more economic and population growth in this area or more
housing than current government targets require, but prioritising social housing and new water infrastructure
to reduce stress on our rivers and wildlife. It should be supporting the national ‘levelling up’ policy. It should
be consistent with the government’s ‘brownfield first’ objective which will deliver badly needed homes
faster. It should take into account the growing flood risk to large parts of the county and the consequences for
national food supply. It needs to take into account the as yet, unknown, long-term effects on employment and
travel behaviours of the COVID pandemic.
We request that this flawed Draft Local Plan is rejected, rewritten and re-submitted for full public
consultation.
Kind regards,
S teering Group of Friends of the Cam *
Monica Bijok Hone
Wendy Blythe
Prof Tony Booth
Prof Susan Buckingham
Daniel Fulton
Jean Glasberg
Dr Alan James
Terry Macalister
Ian Ralls
Jane Williams
*Friends of the Cam is a cross-political-party group which holds well-attended events and activities aimed at
raising public awareness of and involvement with, the problems facing the chalk river system that is the
Cam-Ouse and tributaries. We seek solutions to the problems faced by our precious river systems. We are
entirely independent of Councils, Water Companies or Business groups because we do not accept funding
from any other organisation.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60039

Received: 08/12/2021

Respondent: Anne Wilson

Representation Summary:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Kind regards,

Full text:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Kind regards,

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60041

Received: 08/12/2021

Respondent: Mr Mark Farrington

Representation Summary:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Kind regards,

Full text:

Dear Sir/ Madam,

I am writing to object to the Draft Local Plan on the grounds of inadequate water supply, effect on national food security, failure to minimise climate change, likely irreparable damage to ecosystems, carbon emissions resulting from construction, lack of an integrated public transport system, undermining of the Government's policy of ‘levelling up’, and a democratic deficit in the process and evidence base .

I support the letter of objection sent to you by Friends of the Cam, available here;

https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf

Please confirm that you have received my objection.

Kind regards,