GP/PP: People and place responsive design

Showing comments and forms 1 to 30 of 40

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56513

Received: 15/11/2021

Respondent: Mrs Catherine Martin

Representation Summary:

This policy is contradicted in so many ways by the proposed relocation of the CWWTP to Green Belt at Honey Hill. It will totally dominate the subtle, open Fen landscape. It will have a negative impact on local communities who are very opposed to the development - impact on health, HGV traffic, pollution, fear about impact of sewage on health. Proximity to a school. Negative impact on route to school and into the city for many people. Blocking their route to health centres. Out of scale in the landscape, height and skyline. One poor quality design offered. Unacceptable.

Full text:

This policy is contradicted in so many ways by the proposed relocation of the CWWTP to Green Belt at Honey Hill. It will totally dominate the subtle, open Fen landscape. It will have a negative impact on local communities who are very opposed to the development - impact on health, HGV traffic, pollution, fear about impact of sewage on health. Proximity to a school. Negative impact on route to school and into the city for many people. Blocking their route to health centres. Out of scale in the landscape, height and skyline. One poor quality design offered. Unacceptable.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56633

Received: 25/11/2021

Respondent: Gamlingay Parish Council

Representation Summary:

Agree in principle-however community engagement through Parish Councils is required to take full account of residents views, and ensuring that village design guides and emerging Neighbourhood Plan policies are fully referenced.

Full text:

Agree in principle-however community engagement through Parish Councils is required to take full account of residents views, and ensuring that village design guides and emerging Neighbourhood Plan policies are fully referenced.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 56704

Received: 01/12/2021

Respondent: British Horse Society

Representation Summary:

Essential that non motorised user (walkers, cyclists and equestrian) access is included from the design concept. Developments should maximise opportunities to link to and enhance the existing PROW. Concepts should include peripheral bridleway / restricted byway (to cater for very poorly served carriage drivers) with loops and links to existing network including upgrading of footpaths for more inclusivity. Needs to comply with Cambs ROWIP strategies.

Full text:

Essential that non motorised user (walkers, cyclists and equestrian) access is included from the design concept. Developments should maximise opportunities to link to and enhance the existing PROW. Concepts should include peripheral bridleway / restricted byway (to cater for very poorly served carriage drivers) with loops and links to existing network including upgrading of footpaths for more inclusivity. Needs to comply with Cambs ROWIP strategies.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57101

Received: 09/12/2021

Respondent: Mrs Clare King

Agent: Cheffins

Representation Summary:

It is accepted that good design is highly subjective, yet, the planning system has allowed the steady homogenisation of built environments, with a dominance of bland, monotonous “identikit” housing estates from major housebuilders.

Additional measures should be introduced for strategic scale development to avoid monotony. However, design guides/codes should not be imposed on smaller scale developments where other mechanisms, including parameter plans, can adequately achieve similar and proportionate outcomes.

Full text:

It is accepted that good design is highly subjective. However, the planning system has allowed the steady homogenisation of built environments, with a dominance of bland, monotonous “identikit” housing estates from major housebuilders.

Design Guides/Codes are acceptable on large scale, strategic developments, but should not be imposed on smaller scale developments where other mechanisms, including parameter plans, can adequately achieve similar and proportionate outcomes. Local community input will also be as stated, and a robust consultation process will be needed since the ‘devil will be in the detail’; these documents must go beyond broad requirements for new homes to be ‘in keeping’ with the character and appearance of the area.

However, it will take time for these design guides to be drafted and adopted. In the interim, developers could be signposted towards an alternative framework, such as the National Design Guide, which includes 10 characteristics of a well-designed place: context, identity, built form, movement, nature, public spaces, uses, homes and buildings, resources, and lifespan. Schemes which can demonstrate a high standard of design should be fast-tracked through the application process.

Additional measures should be introduced for strategic scale development to avoid monotony. For example, the policy could introduce a minimum number of individual house types, appropriate to the scale of development.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57138

Received: 09/12/2021

Respondent: North Newnham Res.Ass

Representation Summary:

Conservation Area Appraisals must be updated.
CA’s must be better referenced in the LP as a primary source context built and natural Heritage.

• New development impacts needs to be accurately portrayed.

• Heights of trees must be accurately presented in drawings- to demonstrate impacts on neighbouring or surrounding built or natural context.
• Developers must not produce falsified artist impressions of tree heights against buildings.

• Where possible site visits should be undertaken by planners and decision makers


A critical analysis is needed with visuals of unsuccessful tall buildings skylines and eroded long views.

Full text:

Conservation Area Appraisals must be updated.
CA’s must be better referenced in the LP as a primary source context built and natural Heritage.

• New development impacts needs to be accurately portrayed.

• Heights of trees must be accurately presented in drawings- to demonstrate impacts on neighbouring or surrounding built or natural context.
• Developers must not produce falsified artist impressions of tree heights against buildings.

• Where possible site visits should be undertaken by planners and decision makers


A critical analysis is needed with visuals of unsuccessful tall buildings skylines and eroded long views.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57211

Received: 10/12/2021

Respondent: Abrdn

Agent: Deloitte

Representation Summary:

Abrdn supports the overarching ambitions of proposed policy GP/PP. However, Abrdn recommends that as the policy is developed consideration is given to ensuring there is sufficient flexibility for well-designed and high quality buildings to come forward even if they are taller than the surrounding townscape. High quality taller landmark buildings can have a positive impact on their setting by adding to the townscape and this should be allowed for within the policy.

Full text:

Abrdn supports the overarching ambitions of proposed policy GP/PP. However, Abrdn recommends that as the policy is developed consideration is given to ensuring there is sufficient flexibility for well-designed and high quality buildings to come forward even if they are taller than the surrounding townscape. High quality taller landmark buildings can have a positive impact on their setting by adding to the townscape and this should be allowed for within the policy.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57273

Received: 10/12/2021

Respondent: Universities Superannuation Scheme (Commercial)

Agent: Deloitte

Representation Summary:

USS supports the overarching ambitions of proposed policy GP/PP. However, USS recommends that as the policy is developed consideration is given to ensuring there is sufficient flexibility for well-designed and high quality buildings to come forward even if they are taller than the surrounding townscape. High quality taller landmark buildings can have a positive impact on their setting by adding to the townscape and this should be allowed for within the policy.

Full text:

USS supports the overarching ambitions of proposed policy GP/PP. However, USS recommends that as the policy is developed consideration is given to ensuring there is sufficient flexibility for well-designed and high quality buildings to come forward even if they are taller than the surrounding townscape. High quality taller landmark buildings can have a positive impact on their setting by adding to the townscape and this should be allowed for within the policy.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57306

Received: 10/12/2021

Respondent: Ms Charlotte Sawyer Nutt

Agent: Cheffins

Representation Summary:

It is accepted that good design is highly subjective, yet, the planning system has allowed the steady homogenisation of built environments, with a dominance of bland, monotonous “identikit” housing estates from major housebuilders.

Additional measures should be introduced for strategic scale development to avoid monotony. However, design guides/codes will take time to fully implement and should be responsive to the particular scale of development being proposed. In the interim, developers should be directed towards alternative design guidance (e.g. the National Design Guide).

Full text:

It is accepted that good design is highly subjective. However, the planning system has allowed the steady homogenisation of built environments, with a dominance of bland, monotonous “identikit” housing estates from major housebuilders.

The bold ambitions of draft policy GP/PP are supported, particularly the proposed use of design Guides/Codes to set out the design expectations for a particular area. Local community input will also be as stated, and a robust consultation process will be needed since the ‘devil will be in the detail’; these documents must go well beyond broad requirements for new homes to be ‘in keeping’ with the character and appearance of the area.

However, it will take time for these design guides to be drafted and adopted. In the interim, developers could be signposted towards an alternative framework, such as the National Design Guide, which includes 10 characteristics of a well-designed place: context, identity, built form, movement, nature, public spaces, uses, homes and buildings, resources, and lifespan. Developments which can demonstrate a high standard of design should be fast-tracked through the application process.

Additional measures should be introduced for strategic scale development to avoid monotony. For example, the policy could introduce a minimum number of individual house types, appropriate to the scale of development.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57413

Received: 10/12/2021

Respondent: Huntingdonshire District Council

Representation Summary:

Huntingdonshire District Council has no comment on this matter.

Full text:

Huntingdonshire District Council has no comment on this matter.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 57721

Received: 11/12/2021

Respondent: Bassingbourn-cum-Kneesworth Parish Council

Representation Summary:

Design needs to reflect existing character of the built environment especially in villages.
Design should seek to prevent and mitigate crime and anti-social behaviour.

Full text:

Design needs to reflect existing character of the built environment especially in villages.
Design should seek to prevent and mitigate crime and anti-social behaviour.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58011

Received: 12/12/2021

Respondent: Cambridge Doughnut Economics Action Group

Representation Summary:

The proposals focus mostly on features and characteristics of developments that respond to local context or specific functional needs of minority groups. These are aesthetic or function-specific interpretations of “people-responsive” and place.

By contrast, the broader human and psychological needs of communities are much more holistic, and are based on community needs of engagement and political agency: including integrated considerations of life needs, activities, and promotion of connected, coherent, participatory collective spaces.

With the current narrow focus of the proposals, the developments will continue to be heart-less, community-poor, and without a collective spirit of belonging: as most current developments are.

Full text:

The proposals focus mostly on features and characteristics of developments that respond to local context or specific functional needs of minority groups. These are aesthetic or function-specific interpretations of “people-responsive” and place.

By contrast, the broader human and psychological needs of communities are much more holistic, and are based on community needs of engagement and political agency: including integrated considerations of life needs, activities, and promotion of connected, coherent, participatory collective spaces.

With the current narrow focus of the proposals, the developments will continue to be heart-less, community-poor, and without a collective spirit of belonging: as most current developments are.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58033

Received: 12/12/2021

Respondent: Great and Little Chishill Parish Council

Representation Summary:

GP/PP: People and place responsive design - An initiative that needs ‘public’ consultation to gain an insight into what people want.

Full text:

See attached document.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58049

Received: 12/12/2021

Respondent: Histon & Impington Parish Council

Representation Summary:

High quality design is essential and Affordable homes should also be of a high quality. So many reports today in other areas of Affordable Houses been in a disgraceful position.

Full text:

High quality design is essential and Affordable homes should also be of a high quality. So many reports today in other areas of Affordable Houses been in a disgraceful position.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58076

Received: 12/12/2021

Respondent: Mr Bruce Marshall

Representation Summary:

My experience is that the design of access to new developments is poor.
I site as evidence the appalling pedestrian links between GB1/GB2 and the amenities in Queen Ediths

Full text:

My experience is that the design of access to new developments is poor.
I site as evidence the appalling pedestrian links between GB1/GB2 and the amenities in Queen Ediths

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58211

Received: 13/12/2021

Respondent: Universities Superannuation Scheme (Retail)

Agent: Deloitte

Representation Summary:

USS supports the overarching ambitions of proposed policy GP/PP. However, USS recommends that as the policy is developed consideration is given to ensuring that there is sufficient flexibility for well-designed and high quality buildings to come forward even if they are taller than the surrounding townscape. High quality taller landmark buildings can have a positive impact on their setting by adding to the townscape and this should be allowed for within the policy.

Full text:

USS supports the overarching ambitions of proposed policy GP/PP. However, USS recommends that as the policy is developed consideration is given to ensuring that there is sufficient flexibility for well-designed and high quality buildings to come forward even if they are taller than the surrounding townscape. High quality taller landmark buildings can have a positive impact on their setting by adding to the townscape and this should be allowed for within the policy.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58228

Received: 13/12/2021

Respondent: Countryside Properties

Agent: Bidwells

Representation Summary:

Countryside support the proposed direction of Policy GP/PP in seeking to set a strategic vision for achieving high quality design in Greater Cambridge across both urban and rural areas. Countryside support the inclusion of design criteria across the themes of community, connectivity, climate and character, reflecting the Cambridgeshire Quality Charter for Growth, which Countryside have a track record of delivering high quality proposals in accordance with.

Full text:

Countryside support the proposed direction of Policy GP/PP in seeking to set a strategic vision for achieving high quality design in Greater Cambridge across both urban and rural areas. Countryside support the inclusion of design criteria across the themes of community, connectivity, climate and character, reflecting the Cambridgeshire Quality Charter for Growth, which Countryside have a track record of delivering high quality proposals in accordance with. The proposed policy also accords with the NPPF which states that the planning process should achieve high quality, beautiful and sustainable buildings and places.

Land to the west of Cambridge Road, Melbourn addresses these design themes as follows:

● Community – Through delivering a landscape led development which responds to its context by retaining and reinforcing landscape buffers and delivering high quality open and green spaces. The proposed looped walking route will create a new recreation and landscape asset for the village. The proposals will also provide a range of house types within close proximity to services and facilities, and through applying their Building Communities strategy, Countryside will engage with and empower the community to ensure the development meets local needs;
● Connectivity – The site is in a sustainable location, whereby future residents would not be reliant on the private car for their daily needs. Melbourn is one of the largest villages in the District and has a wide range of services and facilities, including Meldreth station, which are within walking and cycling distance of the site. In addition, the proposals include for the delivery of a pedestrian route from the West of the site along ‘the Drift’ which links to Moat Lane. This will provide new residents with enhanced pedestrian connectivity to the adjacent Science Park and the Melbourn High Street, encouraging the use of sustainable modes of transport;
● Climate - Countryside has recently committed to becoming a net zero company by 2030 and have released a report ‘Pathfinder: Marking out the route to Net Zero’6 which sets out the principles that Countryside will follow to respond to the global call to arms for climate action. Land to the west of Cambridge Road, Melbourn will benefit from Countryside’s action plan to deliver on its commitments. To achieve their targets Countryside are examining their construction and manufacturing operations and also the design of their homes and development. Measures include improving fabric efficiency, installing renewable energy and recovery systems, switching from diesel to hydrotreated vegetable oil for on-site plant machinery, using suppliers with similar climate change targets, increasing tree planting and reducing embodied carbon by using timber frame homes.
● Character - a landscape-led approach is central to the design and layout of the scheme, as shown in the Illustrative Masterplan which shows how the site could come forward. Furthermore, the promoter, Countryside Properties, are a leading national housebuilder who have won numerous design awards and are committed to delivering a high quality development.

6 https://www.countrysideproperties.com/sites/default/files/2021-11/Pathfinder%20-%20Marking%20out%20the%20route%20to%20net%20zero.pdf

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58449

Received: 13/12/2021

Respondent: Linton Parish Council

Representation Summary:

Support aspirations

Full text:

Support aspirations

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58786

Received: 13/12/2021

Respondent: Trumpington Meadows Land Company (‘TMLC’) a joint venture between Grosvenor Britain & Ireland (GBI) and Universities Superannuation Scheme (USS)

Agent: Grosvenor Britain & Ireland

Representation Summary:

TMLC supports the overarching ambitions of proposed Policy GP/PP in that development should take into consideration the area in which it is located. However, TMLC recommends that as the policy is developed consideration is given to ensuring there is sufficient flexibility for well-designed and high-quality buildings to come forward even if they are taller than the surrounding townscape. High quality taller landmark buildings can have a positive impact on their setting by adding to the townscape and this should be allowed for within the policy.

Full text:

TMLC supports the overarching ambitions of proposed Policy GP/PP in that development should take into consideration the area in which it is located. However, TMLC recommends that as the policy is developed consideration is given to ensuring there is sufficient flexibility for well-designed and high-quality buildings to come forward even if they are taller than the surrounding townscape. High quality taller landmark buildings can have a positive impact on their setting by adding to the townscape and this should be allowed for within the policy.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58807

Received: 13/12/2021

Respondent: Wates Developments Ltd

Agent: Boyer Planning

Representation Summary:

The Draft Policy states that new development should positively contribute to their context, improve Greater Cambridge’s connectivity, support the climate emergency, and enhancing the character of Greater Cambridge.

Land West of London Road, Fowlmere will deliver a scheme that responds and supports the climate emergency through the introduction of sustainable construction methods, adopting renewable energy and maximising water efficiency. In so far as enhancing the character of Greater Cambridge, the Site proposes to include a Village Park, which will provide multifunctional benefits, promoting social cohesion and providing a biodiversity net gain.

Full text:

The Draft Policy states that new development should positively contribute to their context, improve Greater Cambridge’s connectivity, support the climate emergency, and enhancing the character of Greater Cambridge.

Land West of London Road, Fowlmere will deliver a scheme that responds and supports the climate emergency through the introduction of sustainable construction methods, adopting renewable energy and maximising water efficiency. In so far as enhancing the character of Greater Cambridge, the Site proposes to include a Village Park, which will provide multifunctional benefits, promoting social cohesion and providing a biodiversity net gain.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 58858

Received: 13/12/2021

Respondent: University of Cambridge

Representation Summary:

We support the intention to set a strategic vision for achieving high quality design in Greater Cambridge for both urban and rural areas, focussing on communities, connectivity, climate change mitigation and adaption, and character.

Full text:

We support the intention to set a strategic vision for achieving high quality design in Greater Cambridge for both urban and rural areas, focussing on communities, connectivity, climate change mitigation and adaption, and character.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59022

Received: 13/12/2021

Respondent: Metro Property Unit Trust

Agent: Turley

Representation Summary:

We support the policy direction. In line with the National Planning Policy Framework, the emerging policy should make reference to ‘Making effective use of land’ and the importance, as set out in paragraph 120 (d) of promoting and supporting the development of under-utilised land and buildings, especially if this would help to meet identified needs for housing where land supply is constrained and available sites could be used more effectively (for example… building on car parks).

Full text:

We support the policy direction. In line with the National Planning Policy Framework, the emerging policy should make reference to ‘Making effective use of land’ and the importance, as set out in paragraph 120 (d) of promoting and supporting the development of under-utilised land and buildings, especially if this would help to meet identified needs for housing where land supply is constrained and available sites could be used more effectively (for example… building on car parks).

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59172

Received: 13/12/2021

Respondent: Endurance Estates

Agent: Cheffins

Representation Summary:

It is accepted that good design is highly subjective, yet, the planning system has allowed the steady homogenisation of built environments, with a dominance of bland, monotonous “identikit” housing estates from major housebuilders.

Additional measures should be introduced for strategic scale development to avoid monotony. However, design guides/codes should not be imposed on smaller scale developments where other mechanisms, including parameter plans, can adequately achieve similar and proportionate outcomes.

Full text:

It is accepted that good design is highly subjective. However, the planning system has allowed the steady homogenisation of built environments, with a dominance of bland, monotonous “identikit” housing estates from major housebuilders.

Design Guides/Codes are acceptable on large scale, strategic developments, but should not be imposed on smaller scale developments where other mechanisms, including parameter plans, can adequately achieve similar and proportionate outcomes. Local community input will also be as stated, and a robust consultation process will be needed since the ‘devil will be in the detail’; these documents must go beyond broad requirements for new homes to be ‘in keeping’ with the character and appearance of the area.

However, it will take time for these design guides to be drafted and adopted. In the interim, developers could be signposted towards an alternative framework. For example, the National Design Guide, which includes 10 characteristics of a well-designed place: context, identity, built form, movement, nature, public spaces, uses, homes and buildings, resources, and lifespan. Schemes which can demonstrate a high standard of design should be fast-tracked through the application process.

Additional measures should be introduced for strategic scale development to avoid monotony. For example, the policy could introduce a minimum number of individual house types, appropriate to the scale of development.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59249

Received: 13/12/2021

Respondent: Cambourne Town Council

Representation Summary:

Cambourne Town Council understands the need for this policy as it addresses the aims contained in the vision.

Full text:

Cambourne Town Council understands the need for this policy as it addresses the aims contained in the vision.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59596

Received: 09/12/2021

Respondent: National Grid

Representation Summary:

To ensure that Policy GP/PP: People and place responsive design is consistent with
national policy we would request the inclusion of a policy strand such as:

“x. taking a comprehensive and co-ordinated approach to development including respecting existing
site constraints including utilities situated within sites.”

Full text:

National Grid has appointed Avison Young to review and respond to local planning authority Development Plan Document consultations on its behalf. We are instructed by our client to submit the following representation with regard to the current consultation on the above document.

About National Grid
National Grid Electricity Transmission plc (NGET) owns and maintains the electricity transmission system in England and Wales. The energy is then distributed to the electricity distribution network operators, so it can reach homes and businesses.

National Grid Gas plc (NGG) owns and operates the high-pressure gas transmission system across the UK. In the UK, gas leaves the transmission system and enters the UK’s four gas distribution networks where pressure is reduced for public use.

National Grid Ventures (NGV) is separate from National Grid’s core regulated businesses. NGV develop, operate and invest in energy projects, technologies, and partnerships to help accelerate the development of a clean energy future for consumers across the UK, Europe and the United States.

Utilities Design Guidance
The increasing pressure for development is leading to more development sites being brought forward through the planning process on land that is crossed by National Grid infrastructure.

National Grid advocates the high standards of design and sustainable development forms promoted through national planning policy and understands that contemporary planning and urban design agenda require a creative approach to new development around high voltage overhead lines, underground gas transmission pipelines, and other National Grid assets.

Therefore, to ensure that Policy GP/PP: People and place responsive design is consistent with national policy we would request the inclusion of a policy strand such as:



Avison Young (UK) Limited registered in England and Wales number 6382509. Registered office, 3 Brindleyplace, Birmingham B1 2JB. Regulated by RICS





“x. taking a comprehensive and co-ordinated approach to development including respecting existing site constraints including utilities situated within sites.”

Further Advice
National Grid is happy to provide advice and guidance to the Council concerning their networks.

Please see attached information outlining further guidance on development close to National Grid assets.

If we can be of any assistance to you in providing informal comments in confidence during your policy development, please do not hesitate to contact us.

To help ensure the continued safe operation of existing sites and equipment and to facilitate future infrastructure investment, National Grid wishes to be involved in the preparation, alteration and review of plans and strategies which may affect their assets. Please remember to consult National Grid on any Development Plan Document (DPD) or site-specific proposals that could affect National Grid’s assets.

National Grid is able to provide advice and guidance to the Council concerning their networks and encourages high quality and well-planned development in the vicinity of its assets.

Electricity assets
Developers of sites crossed or in close proximity to National Grid assets should be aware that it is National Grid policy to retain existing overhead lines in-situ, though it recognises that there may be exceptional circumstances that would justify the request where, for example, the proposal is of regional or national importance.

National Grid’s ‘Guidelines for Development near pylons and high voltage overhead power lines’ promote the successful development of sites crossed by existing overhead lines and the creation of well-designed places. The guidelines demonstrate that a creative design approach can minimise the impact of overhead lines whilst promoting a quality environment. The guidelines can be downloaded here: https://www.nationalgridet.com/document/130626/download

The statutory safety clearances between overhead lines, the ground, and built structures must not be infringed. Where changes are proposed to ground levels beneath an existing line then it is important that changes in ground levels do not result in safety clearances being infringed.
National Grid can, on request, provide to developers detailed line profile drawings that detail the height of conductors, above ordnance datum, at a specific site.

National Grid’s statutory safety clearances are detailed in their ‘Guidelines when working near National Grid Electricity Transmission assets’, which can be downloaded here: www.nationalgridet.com/network-and-assets/working-near-our-assets

Gas assets
High-Pressure Gas Pipelines form an essential part of the national gas transmission system and National Grid’s approach is always to seek to leave their existing transmission pipelines in situ. Contact should be made with the Health and Safety Executive (HSE) in respect of sites affected by High-Pressure Gas Pipelines.

National Grid have land rights for each asset which prevents the erection of permanent/ temporary buildings, or structures, changes to existing ground levels, storage of materials etc. Additionally, written permission will be required before any works commence within the National Grid’s 12.2m building proximity distance, and a deed of consent is required for any crossing of the easement.

National Grid’s ‘Guidelines when working near National Grid Gas assets’ can be downloaded here: www.nationalgridgas.com/land-and-assets/working-near-our-assets
How to contact National Grid
If you require any further information in relation to the above and/or if you would like to check if National Grid’s transmission networks may be affected by a proposed development, please visit the website: https://lsbud.co.uk/
For local planning policy queries, please contact: nationalgrid.uk@avisonyoung.com

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59675

Received: 13/12/2021

Respondent: Historic England

Representation Summary:

We welcome the proposals to include a policy on responsive design. We welcome references to the National Design Guide and National Model Design Code. We recognise the wide range of design guidance already in place across the Plan area. We welcome references to context, historic characteristics, setting, etc. The historic environment is a key aspect of Great Places. We strongly encourage provision for the historic environment throughout the plan, not solely within heritage focused policies. Most particularly, we seek a specific requirement for consideration of the historic environment within the design policies of the local plan which should seek to draw on opportunities offered by the historic environment and reflect local character and distinctiveness. This should not stymie contemporary development but should require an appreciation of the significance and character of the historic environment in producing a high standard of design.We highlight the recent publication Building Better Building Beautiful Commission report which may help shape your policy in this area. In respect of tall buildings, we had previously understood that you are completing some work to inform an updated policy. Is this still the intention? We broadly welcome policy 60 and Appendix F of the 2018 Cambridge City Local Plan. However, we consider that this could be further supplemented to indicate which areas may or may not be suited to taller buildings. The policy should be informed by a Tall Buildings and the Skyline study. Our advice note in relation to tall buildings provides further guidance
in this respect HE Advice Note 4 – tall buildings:
https://historicengland.org.uk/images-books/publications/tallbuildings-advice-note-4/ (10 December 2015). A revision to this guidance is due to be published imminently. The skyline of Cambridge is an important characteristic of the City. In a relatively flat landscape with long distance views both from the elevated land to the south and west, as well as from the flatter fenland to the north and east, particular care needs to be taken over building heights. We suggest that trying to use one policy to cover all aspects of design and tall buildings may prove to be ambitious. It may be helpful to have a separate policy for tall(er) buildings.

Full text:

Thank you for consulting Historic England on the First Proposals Public Consultation for the Greater Cambridge Local Plan. As the Government’s adviser on the historic environment Historic England is keen to ensure that the protection of the historic environment is fully considered at all stages and levels of the local planning process.

Cambridge is a beautiful, compact and historic city. It is also an historic seat of learning with a very high concentration of highly graded heritage assets. Much of the city is covered by Conservation Area status. The river corridor, green fingers and open spaces, with cows grazing in meadows even at the heart of the city, shape the character of the townscape and landscape.

Although a relatively flat landscape, the elevated positions to the west and south of the Cambridge afford important views across the city skyline, which is one of extensive tree cover and emerging spires. The flatter Fens landscape to the north and east provides very long-distance views of the City and the big east Anglian skies.

The surrounding rural hinterland of South Cambridgeshire comprises over 100 villages, each with their own unique character and heritage. New settlements are an important feature of the district, with their own special identity and are growing rapidly.

We recognise the area faces intense pressure for growth, driven by both the economic success and the attractiveness of the area, in large part a consequence of

its rich architectural and cultural heritage. This growth must be carefully managed to ensure that the very things that contribute to its success are not harmed in the process.

It is for this reason that Historic England is keen to ensure that the emerging plan gives full consideration to the historic environment, both in the choice of site allocations and policy criteria for sites, as well as through a robust and clear suite of historic environment and other policies that seek to both protect but also enhance the historic environment.

We have reviewed the Draft Plan and consultation material with a view to providing advice on heritage matters.

As a general comment, Historic England welcomes emerging plan and work undertaken to date. We have however identified below some of the key issues to be addressed in progressing the next iteration of the Plan: This should be read in conjunction with Appendix A which provides more detailed comments on these and other more minor issues.

a) Site Assessment and the need for Heritage Impact Assessments

We are pleased to note that a degree of site assessment has already been undertaken in relation to the historic environment. These are set out in the HELAA Report, especially Appendix 4.

To date, the assessment of sites is fairly high level and brief but provides a useful starting point, in particular helping to identify immediate showstoppers. We note that many of the sites are shown as amber.

As we have discussed previously, the need for further assessment of heritage in terms of significance, impact on that significance, potential mitigation and enhancements etc will be needed for the site allocations. There is currently an insufficient evidence base in this regard. We therefore welcome your commitment to undertake Heritage Impact Assessments for site allocations. These should be prepared prior to the next draft of the Local Plan.

This further assessment, known as Heritage Impact Assessment (HIA) should follow the 5 step methodology set out in out in our advice note, HEAN 3 on Site Allocations in Local Plans https://historicengland.org.uk/images- books/publications/historic-environment-and-site-allocations-in-local-plans/.

HIAs should be proportionate (both to the scale of the site and the assets affected). All potential sites will need to be appraised against potential historic environment

impacts. It is imperative to have this robust evidence base in place to ensure the soundness of the Plan. We recommend that the appraisal approach should avoid merely limiting assessment of impact on a heritage asset to its distance from, or inter-visibility with, a potential site.

Site allocations which include a heritage asset (for example a site within a Conservation Area) may offer opportunities for enhancement and tackling heritage at risk, while conversely, an allocation at a considerable distance away from a heritage asset may cause harm to its significance, rendering the site unsuitable.

Impacts on significance are not just based on distance or visual impacts, and assessment requires a careful judgment based on site visits and the available evidence base. Cumulative effects of site options on the historic environment should be considered too.

The following broad steps might be of assistance in terms of assessing sites:

• Identify the heritage assets on or within the vicinity of the potential site allocation at an appropriate scale
• Assess the contribution of the site to the significance of heritage assets on or within its vicinity
• Identify the potential impacts of development upon the significance of heritage asset
• Consider how any harm might be removed or reduced, including reasonable alternatives sites
• Consider how any enhancements could be achieved and maximised
• Consider and set out the public benefits where harm cannot be removed or reduced

The HIAs should assess the suitability of each area for development and the impact on the historic environment. Should the HIA conclude that development in the area could be acceptable and the site be allocated, the findings of the HIA should inform the Local Plan policy including development criteria and a strategy diagram which expresses the development criteria in diagrammatic form.

Which sites require HIA?

Ideally all sites should have an HIA, albeit proportionate to the site and heritage sensitivities.

For existing allocations being carried forward into this Local Plan, the HIA is less about the principle of development (that has already been established through previous plan allocation) and more about exploring capacity, height, density and any heritage mitigation and enhancement opportunities so that these can then be

included in the updated policy wording.

For new allocations, the HIA will be a more holistic view and consider both the principle of development as well as the other matters identified above.

b) Policy Wording for sites

If, having completed the heritage impact assessments, it is concluded that a site is suitable for allocation, we would remind you to include appropriate policy criteria for the historic environment in the policy. Please refer to the advice we give on policy wording in the attached table.

It can be helpful to refer to an HIA in the policy wording. Concept diagrams can also be useful to include in the plan to illustrate key site considerations/ recommendations.

c) Edge of Cambridge sites

The Plan proposes carrying forward a number of partially built out allocations on the edge of the City as well as some minor extensions to these. The Plan also proposes revisiting the dwelling capacity/density for some of these sites e.g. Eddington.

Proposals for North East Cambridge are very high density and also quite tall.

The Plan also includes a very large new allocation at East Cambridge (previously released from the Green Belt and allocated in the 2006 Plan, although not in the 2018 Plan). The number of dwellings now being proposed represents a significant increase in density from the 2006 Plan.

We have some concerns regarding these densities and heights on edge of Cambridge sites. Development at very high densities/heights and the potential impact on the overall setting of this historic city. HIAs should give careful consideration to the issue of development and site capacity and height – we will be looking for evidence in this regard.

d) Historic Environment Policy

We welcome your intention to include a policy for the Historic Environment. This should cover both designated and non-designated heritage assets. Policy wording should be in line with the NPPF but we are also looking for a local flavour.

Policies should be spatially specific, unique to the area, describing the local characteristics of the area and responding accordingly with policies that address the local situation.

You should also include a policy for Heritage at Risk and a policy for historic shopfronts. For further detail see Appendix A.

e) Design Policy

We welcome the proposals for a design policy on the plan. We note that this policy is also intended to address tall buildings. We are concerned that the policy might become overly long and detailed, given it is covering such a wide and important range of issues and wonder whether separating out tall buildings into a separate policy might be helpful?

f) Tall Buildings Study and Policy

Related to the above, given the growth pressures that we would anticipate Cambridge is likely to experience over the coming years, we are pleased to see that the matter of Tall buildings and the skyline will be addressed in policy.

We had understood that you were commissioning a study in relation to tall buildings and the skyline policy. Is this still proposed to inform the policy in the next draft of the Local Plan?

See our advice note HEAN 4 and the consultation draft of HEAN 4. Any policy should indicate what considerations are needed for taller buildings, where buildings may or may not be appropriate etc. and in particular consider in the impact on the historic environment.

We broadly welcome policy 60 and Appendix F of the 2018 Cambridge City Local Plan. However, we consider that this could be further supplemented to indicate which areas may or may not be suited to taller buildings. Our advice note in relation to tall buildings provides further guidance in this respect

We have been having discussions with the team preparing The North East Area Action Plan in relation to tall buildings studies and have provided a detailed advice letter in that regard. Please refer to our advice letters in relation to NEA Action Plan and tall buildings for further information on our position.

g) Other Supporting Evidence

We welcome the preparation of the HELAA although consider that further, more detailed evidence is needed in relation to heritage impact and so welcome your intention to prepare HIAs for site allocations.

We broadly welcome the Strategic Heritage Impact Assessment including the baseline study of the setting of Cambridge. However, we have expressed some concerns regarding some aspects of this baseline, in particular the weighting given to some of the key characteristics and aspects of setting of Cambridge including views. Further detail is given in Appendix A.

We welcome the evidence in relation to landscape character assessment. We do however continue to suggest that it would also be helpful to commission Historic Landscape Characterisation work for inform this Plan and future growth in the area.

We welcome the production of the Sustainability Appraisal. We would comment however that since many of the site allocations are grouping together under particular policies, the different impacts for individual sites are not always drawn out in the assessment tables – this sometimes has the effect of neutralising the scoring.

Historic England – Ox Cam research work

Historic England has commissioned consultants to undertake some work looking at development in the OxCam Arc. ‘Measuring Impact: Managing Change’ looks at the question, ‘How should the form of growth in the Oxford-Cambridge arc positively respond to the Historic Environment’. This research is due to report in the next few months and we hope to be able to share this with you at that time as it may provide useful evidence to inform your Local Plan work.

Other comments

In preparation of the forthcoming Greater Cambridge Local Plan, we encourage you to draw on the knowledge of local conservation officers, archaeologists and local heritage groups.

Please note that absence of a comment on an allocation or document in this letter does not mean that Historic England is content that the allocation or document forms part of a positive strategy for the conservation and enjoyment of the historic environment or is devoid of historic environment issues. Where there are various options proposed for a settlement, identification of heritage issues for a particular

allocation does not automatically correspond to the support for inclusion of the alternative sites, given we have not been able to assess all of the sites.

Finally, we should like to stress that this opinion is based on the information provided by the Council in its consultation. To avoid any doubt, this does not affect our obligation to provide further advice and, potentially, object to specific proposals, which may subsequently arise where we consider that these would have an adverse effect upon the historic environment.

We trust that these comments are helpful to you in developing the Local Plan. Should you have any queries, please do not hesitate to contact us.

We suggest it might be helpful to set up a meeting to discuss our comments and, in particular, heritage impact assessments and policy wording for site allocations.
Please feel free to suggest some dates.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59981

Received: 13/12/2021

Respondent: Natural England

Representation Summary:

Natural England supports the proposed Great Places policies. We welcome the establishment of a Place and Design Quality Panel to conduct a site typologies study to understand, protect, utilise and enhance the valued characteristics of different areas in the plan, with the intention of using this information to raise design standards to ensure development reflects and enhances Cambridge’s distinctive landscape and townscape character.

Full text:

Thank you for consulting Natural England on the above in your letter dated 1 November 2021.

Natural England is a non-departmental public body. Our statutory purpose is to ensure that the natural environment is conserved, enhanced, and managed for the benefit of present and future generations, thereby contributing to sustainable development.

Natural England’s key comments
We are pleased that many of our comments at the Issues and Options stage, in our letter dated 24 February 2020 (ref. 304246), are reflected in the First Proposals Plan, helping to strengthen the Plan’s approach to the ‘big themes’ including climate change, biodiversity and green spaces, wellbeing and social inclusion. Natural England supports the general thrust of the Plan in directing development to where it will have least environmental impact and provide opportunities for enhancements.

Natural England’s previous advice highlighted the need for the Plan to address uncertainties relating to water resources and infrastructure needed to support new growth, in light of evidence that current levels of abstraction are already damaging the natural environment. We also signalled the need for the establishment of a strategic green infrastructure network that is resilient to the scale of proposed Plan development, capable of meeting people’s needs and addressing adverse impacts to the natural environment. We therefore welcome that the First Proposals Plan recognises the challenges in identifying long-term and interim solutions to the current water resource crisis to enable sustainable development without further detriment to the natural environment. We support the Plan’s progress, through the Green Infrastructure Recommendations (LUC, September 2021), in presenting opportunities for the Plan to deliver /contribute towards delivery of strategic green infrastructure.

Notwithstanding the above, Natural England believes significant additional work is required through the next stages of Plan preparation to progress these ‘solutions’ and demonstrate that development can be delivered sustainably. We have major concerns with the scale of proposed Plan development, and the 2041 timeframe for delivery, given the damage already being inflicted on the natural environment and the lengthy lead-in time for identification and delivery of measures to address the water resource issue and to implement strategic green infrastructure. Some of this Plan development is already progressing, through the adopted strategy, prior to solutions being identified and implemented; the natural environment is already being impacted. The Plan should consider how these impacts and spiralling environmental deterioration can be retrospectively

mitigated.

The section on ‘Ensuring a Deliverable Plan – Water Supply’ recognises the challenge relating to water resources; however, the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions to ensure any level of proposed development is delivered sustainably. There are currently no measures in place to mitigate the adverse effects of current development on the natural environment i.e., more water is being abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat.

Potential solutions to address Greater Cambridge’s green infrastructure deficit, and the recreational pressure effects of development, lie within the Green Infrastructure Initiatives identified in LUC’s Opportunity Mapping Recommendations Report. Natural England fully supports the Initiatives identified; however, these aspirational areas must be progressed into real projects that are happening on the ground by the time the Plan is adopted. Robust Plan policy requirements should secure funding for the delivery and long-term management of these projects from all major development.

We have provided additional comments on the Plan’s key themes and policies below; however, reference should be made to the detailed advice provided in our response to the Issues and Options consultation.

Vision and aims
We support the Plan vision and aims for decreases in our climate impacts and increase in quality of life for communities, minimising carbon emissions and reliance on the private car, increases in nature, wildlife, greenspaces and safeguarding landscapes focusing on what is unique to Greater Cambridge embracing bold new approaches.

Natural England strongly recommends that the vision should advocate a more holistic approach to securing multi-functional benefits through the protection and enhancement of the natural environment. In accordance with paragraphs 17 and 109 of the National Planning Policy Framework (NPPF) the Plan should encourage multiple benefits from the use of land in urban and rural areas, recognising that land can deliver a wide range of ecosystem services required for sustainable development including climate change mitigation, flood management, improved water resources and water quality, biodiversity net gain, accessible high quality green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

The Plan should contribute to and enhance the natural and local environment by recognising the wider benefits of ecosystem services, considering a natural capital evidence approach and making strong links to the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

Development Strategy
The Plan will deliver around 44,400 new homes and provide for approximately 58,500 new jobs. We welcome that the new development strategy aims to meet our increased need for new homes in a way that minimises environmental impacts and improves the wellbeing of our communities.
The strategy proposes 19 additional sites for development, along with sites already allocated in the adopted 2018 Local Plans, along with associated infrastructure including green spaces.

We support proposals to direct development to where it has the least climate impact, where active and public transport is the natural choice, where green infrastructure can be delivered alongside new development, and where jobs, services and facilities can be located near to where people live. The vision includes creating new city neighbourhoods which have the critical mass of homes, jobs and services to create thriving communities, making best use of brownfield and safeguarded land and making the most of public transport links.

Natural England welcomes the use of evidence including the Employment Land and Economic Development Evidence Study and the Greater Cambridge Housing and Employment Relationships

Report to understand the relationship between future jobs and housing growth. We note that these studies found that planning for the standard method housing figure set by government would not support the number of jobs expected to arise between 2020 and 2041. Planning for this housing figure would risk increasing the amount of longer distance commuting into Greater Cambridge, with the resulting impacts on climate change and congestion. On this basis planning for a higher jobs figure and planning for government’s standard method local housing need figure have been rejected as reasonable alternatives.

We note that high-level consideration has been given to the potential impacts of COVID-19 on the economy of Greater Cambridge, to inform this First Proposals consultation. We support the proposal to gather evidence to consider the potential longer-term quantitative impacts of COVID- 19 prior to the Draft Plan stage to understand any implications for the objectively assessed need for jobs and homes for the plan.

Natural England has no objection in principle to the proposed Plan development strategy; however, this is subject to: 1) the identification of strategic water supply solutions and / or interim measures; and 2) development of deliverable strategic GI initiatives and developer requirements and funding mechanisms being secured through the Plan.

Policy S/DS: Development strategy
Figure 6: Map shows proposed sites to be included in the Plan including existing planning permissions alongside a limited number of new sites in the most sustainable locations. We welcome that the sustainability merits, opportunities and constraints for each of the nine potential strategy choices have been considered through the Sustainability Appraisal. Alongside considering the best locations for new homes and jobs, consideration has also been given to the best locations to restore the area’s habitat networks and provide more green spaces for people providing health and wellbeing benefits. Natural England fully supports the identification of 14 Strategic Green Infrastructure Initiatives, through the Green Infrastructure evidence, to help achieve this. We welcome the approach to preparing the preferred development strategy / draft allocations and green infrastructure initiatives in parallel.

We support the general policy direction to focus development where it will have the least climate impact, where it can be aligned with active and public transport, opportunities for delivery of green infrastructure and where jobs, services and facilities can be located nearby whilst ensuring all necessary utilities can be provided in a sustainable way. We support the approach to using less land for development to reduce carbon emissions and allow more space for nature and wildlife.
The strategy focuses on opportunities to use brownfield land and opportunities created by proposed major new infrastructure.

We note that delivery of the adopted strategy is progressing well with development permitted/underway /completed at the edge of Cambridge sites and new settlement sites including Northstowe and Waterbeach New Town. Natural England is aware that these schemes are being delivered in the absence of adequate sustainable water supply infrastructure to serve the development without adverse impact to the natural environment including statutorily designated sites. Many of these schemes are also unlikely to deliver sufficient level of accessible high quality green infrastructure to meet the needs of new residents without adverse recreational pressure impacts to the existing ecological network including statutorily designated sites. These issues need to be addressed urgently through further stages of Plan preparation as discussed in our advice above and below.

Ensuring a deliverable plan – water supply
We welcome the Councils’ recognition that water supply is a significant issue for the deliverability of the Local Plan and we fully support preparation of the Integrated Water Management Study: Outline Water Cycle (WCS) by Stantec (August 2021) to address this. The WCS has identified the need for new strategic water supply infrastructure, such as a new fens reservoir, to provide for longer term needs, and to protect the integrity of the chalk aquifer south of Cambridge, in addition to a range of interim demand management measures. The draft Sustainability Appraisal also identifies significant environmental impacts if the issue is not resolved. This is a major concern for

Natural England in light of proposed growth levels and the damaging effects that groundwater abstraction is already having on the natural environment including water-dependent designated sites and important chalk stream habitats. Natural England has provided its detailed advice on this matter, and highlighted the statutorily designated sites potentially affected, in our response to the consultation on the WCS. These ‘Designated Sites of Concern’ are listed in Appendix B of the August 2021 report.

We are aware that Water Resources East is currently preparing its Water Management Plan for the region and that this will help to identify long-term measures to address the issue. However, these strategic measures, including a new fens reservoir, are unlikely to be available until the 2030’s hence interim measures are required to enable some level of sustainable growth. We welcome the suggestion of including Plan policies to phase delivery of development that can be supported by a sustainable water supply until new strategic infrastructure is in place; however, it will need to be clearly demonstrated that interim solutions are sustainable and will not cause further environmental decline. The risk is that it may not be possible to demonstrate delivery of the full objectively assessed needs within the plan period.

Natural England appreciates that pressure on water supplies is a regional issue. We share the Councils’ aspirations that the water industry, supported by government, will set out its intentions for positively addressing this key infrastructure issue at an early point in the ongoing plan making process, to provide confidence that adequate water supply will be available to support delivery of the preferred options allocations, before the next stage of a full draft Local Plan. In our view the Councils need to act urgently, in collaboration with relevant stakeholders, to identify strategic and interim water resource/infrastructure solutions, including demand management measures, to ensure any level of proposed development is delivered sustainably.

We have serious concerns that Plan development is already being progressed, through the adopted strategy, without sustainable water supply measures in place. More water will be abstracted from the aquifer to serve this development, depleting groundwater resources and causing further declines in the condition of designated sites and supporting habitat. The Plan will need to consider the impacts of this development and identify measures to address adverse environmental impact.

Natural England fully supports the concerns raised by the Environment Agency, as lead authority on this matter, including the high degree of uncertainty as to whether sufficient sustainable water supplies can be provided for the proposed growth over the plan period without further detriment to the natural environment. Further development of the WCS, informed by evidence from regional and water company water resource plans, will need to demonstrate that appropriate deliverable mitigation measures can support sustainable growth until new strategic water supply infrastructure becomes operational. We agree with the Environment Agency that it in the face of current challenges it may be appropriate to consider an extended timeframe for delivery of Plan development to limit further environmental degradation until new strategic measures become available. This would allow further time for the identification of truly sustainable options that build in resilience to climate change and robust mitigation and monitoring measures to address impacts to the natural environment and restore habitat condition.

Duty to Cooperate
Natural England welcomes consideration of how the Plan fits with other plans and strategies including cross boundary projects such as the Ox Cam Arc. We support recognition of the Plan to be prepared within a wider regional context noting the Councils’ legal duty to cooperate with key stakeholders and surrounding areas of cross boundary issues. We agree that the development of a clear and positive vision for the future of the Greater Cambridge area can help to shape the proposals for the Ox Cam Arc, noting that the outcome of the Oxford-Cambridge framework is currently awaited.

We particularly support the Councils’ recognition that the water supply challenge discussed above is a serious issue to be resolved.

Natural England will be pleased to engage with the Councils in the preparation and development of a draft Statement of Common Ground.

Transport Strategy
Natural England welcomes that the proposed strategy is heavily informed by the location of existing and committed public transport schemes. We support the use of transport modelling to understand whether additional infrastructure and policies are required to address the transport impacts of the preferred development strategy.

Transport policies should include requirements for projects to undertake robust ecological impact assessment and application of the ecological mitigation hierarchy.

Site allocation policies
Proposed site allocation policies are described through sections 2.2 – 2.5. Natural England has no objection in principle to the existing and new allocations, areas of major change or opportunity areas being taken forward for development. However, this is subject to:
• identification of strategic water supply infrastructure and/or feasible interim solutions to demonstrate that development can be delivered sustainably and without adverse impact to the natural environment;
• establishment of a framework and robust plan policies to deliver the 14 Strategic Green Infrastructure initiatives ahead of development, to meet development needs and to address the effects of recreational pressure on sensitive sites and habitats.

The site allocation policies will need to include robust requirements to secure delivery of biodiversity net gain and on-site accessible green infrastructure to meet people’s need and to contribute towards the Plan’s 20% BNG targets and delivery of the Nature Recovery Network / Cambridge Nature Network. Our advice is that major allocation policies should set a framework for development to maximum opportunities for environmental gains.

Climate Change
We welcome the proposed policies relating to net zero carbon and water efficiency, designing for climate change, flooding and integrated water management, renewable energy projects, reducing waste and supporting land-based carbon sequestration. We particularly support the proposed requirement for residential developments to be designed to achieve a standard of 80 litres/person/ day; however, we support the Environment Agency’s concerns as to whether the Plan is likely to achieve the reductions in demand required to support sustainable growth. As indicated above the WCS will need to demonstrate how water, to meet growth needs, will be supplied sustainably without adverse impact to the natural environment.

Proposed requirements for developments to provide integrated water management, including sustainable drainage systems (SuDS) where possible and for SuDS and green /brown roofs to provide multiple benefits (including biodiversity and amenity) are welcomed.

We support requirements for renewable energy projects to consider impacts on biodiversity, geodiversity, landscape and water quality.

Natural England welcomes a proposed policy to support the creation of land and habitats that play a role as carbon sinks and protect existing carbon sinks from development, particularly peatlands such as those remaining in the north of South Cambridgeshire district. We welcome recognition of the importance of peatlands as a carbon store and the role of other habitats such as woodlands and grasslands, noting loss and degradation of natural habitats results in the direct loss of carbon stored within them.

As indicated above we recommend that the Plan takes a more holistic approach to securing multi- functional benefits for climate change, flood management, water resources and water quality through the protection and enhancement of the natural environment. Natural solutions can achieve significant additional benefits for biodiversity, green infrastructure and associated health and wellbeing benefits, enhanced landscapes and soil resources.

Biodiversity and green spaces
We strongly support the proposed biodiversity and green spaces policies and the inclusion of Figure 53 depicting the existing Greater Cambridge green infrastructure network including designated sites.

We welcome that these policies will help to deliver the aims of the Ox Cam Arc of doubling the area of land managed primarily for nature and to deliver a minimum 20% biodiversity net gain on development sites, beyond the mandatory 10% biodiversity net gain requirements of the Environment Act 2021. We agree that Greater Cambridge has a relatively low level of designated sites and priority habitats, highlighting the need for development to deliver net gains beyond the 10% proposed nationally, hence we are fully supportive of minimum 20% BNG ambitions. Our advice is that the Councils, working with key partners, should identify BNG opportunities through the next phases of Plan preparation. This should take the form of a BNG opportunities / requirements map building on the foundations of the Nature Recovery Network and the Cambridge Nature Network. National Habitats Network mapping is available to view at www.magic.defra.gov.uk.

The Councils should also set a landscape / GI framework for the Site Allocations to maximise opportunities for delivery of GI and BNG within the development sites.

BG/BG: Biodiversity and geodiversity
Natural England fully supports this policy and requirements for development to achieve a minimum 20% biodiversity net gain, delivered on site where possible and calculated using the Defra Metric
3.0 or its successor. Requirements for off-site measures to be consistent with the strategic aims of the Greater Cambridge green infrastructure network strategic initiatives are welcomed.

The policy should take a natural capital evidence approach and recognise the wider benefits of ecosystem services for climate change, flood risk management, green infrastructure and health and wellbeing, in addition to biodiversity. They main thrust of this policy should be the Plan’s contribution to the Nature Recovery Network / Cambridge Nature Network and the establishment of a framework for the development of a Local Nature Recovery Strategy.

We support proposed requirements for development to avoid adverse impact to site of biodiversity or geological importance and development to mitigate recreational pressure on statutorily designated sites, applying Natural England’s SSSI Impacts Risk Zones (IRZs). The Plan’s biodiversity policy should recognise the hierarchy of international, nationally and locally designated sites across Greater Cambridge. This should be accompanied by a map of the existing ecological network and enhancement opportunity areas to guide site allocations / development away from more sensitive areas and to identify opportunities for developers to deliver net biodiversity gain enhancements.

We welcome that the policy will seek wider environmental net gains. These should focus on measures to restore ecological networks, enhance ecological resilience and provide an overall increase in natural habitat and ecological features.

Reference should be made to the detailed advice provided in our response to the Issues and Options consultation with regard to protecting and enhancing biodiversity including designated sites, priority habitats, ecological networks and priority and/or legally protected species populations. This includes additional detailed advice on embedding biodiversity net gain into the Greater Cambridge Local Plan policies.

BG/GI: Green infrastructure
We welcome the comprehensive and thorough approach taken in developing the GI evidence base for the Greater Cambridge Local Plan, including the Opportunity Mapping and the identification of 14 Strategic GI initiatives. The multifunctional benefits of GI are fully recognised, as well as the links between GI provision and the delivery of other strategic policy areas including the wider natural environment, sustainable transport and social inclusion. These threads/links

should continue through future drafts to ensure the value of GI for people and the natural environment is fully reflected in the Local Plan.

The Strategic GI initiatives are comprehensive and capture a wide variety of GI opportunities within the 14 proposals; this range of GI elements and habitats will help to maximise benefits for people and nature through the strategic planning and delivery of GI across Greater Cambridge. We support the emphasis given to blue infrastructure in Strategic Initiatives 1 and 2 given the considerable pressures on Cambridgeshire’s chalk streams and aquifer from agriculture and development. The Chalk Stream Strategy Report1 recently published by CaBA identifies a number of recommendations to protect/restore chalk stream habitats, including those in areas of high population density such as Cambridge. This report may be a useful reference in planning and progressing strategic blue infrastructure initiatives as part of the Greater Cambridge Local Plan.

We support the proposed approach to have a distinct GI policy within the Local Plan, rather than a stand-alone SPD. As noted in the Topic Paper, we agree that the policy should require all developments to contribute towards GI and that it should be incorporated into design from an early stage and through all phases of development, with a longer-term plan in place for its management and maintenance. As well as a GI policy, Green Infrastructure should be integrated into other strategic policy areas and Local Plan themes where relevant. This will give weight to the multifunctional role of GI and demonstrate where it can contribute to policy delivery and outcomes (e.g., in climate change adaptation, supporting healthy communities etc). It will also support the role of GI in implementing other mechanisms and tools, such as Biodiversity Net Gain, and may help in targeting and prioritising opportunities for GI creation and enhancement.

In addition to securing GI within individual developments, the Local Plan should also provide a framework for proposals to contribute to / link up with the wider Strategic Initiatives, including the ‘dispersed initiatives’ 10-14 (e.g., ‘Expanding the Urban Forest’). Consideration should also be given to potential join-ups on cross-boundary projects and, in time, how the strategic GI network in Greater Cambridge may contribute to greenspace at the regional level (as one of the 5 Ox-Cam counties). There may also be overlaps with other initiatives, such as the Nature Recovery Network, where Cambridgeshire’s GI resource can make an important contribution (such as that highlighted in Strategic Initiative 3 for the Gog Magog Hills and Chalkland fringe).

We note from the Part 2 Recommendations Report that there are several points for further consideration, including the funding mechanisms required to ensure that all developments include GI and contribute towards the strategic initiatives. Funding mechanisms (e.g., developer contributions) should be embedded in policy where required and should be identified as early as possible to ensure that benefits are secured long-term. For example, the policies for major allocations will need to include specific requirements for the funding / delivery of the strategic GI ahead of the developments being occupied so that these are clear from the outset. The report presents a number of potential funding sources, including land use planning obligations (e.g., S106) agri-environment streams (such as ELMS) and any ad-hoc opportunities that may arise through partnership working. The increasing emphasis on nature-based solutions may also bring in new revenue streams to support strategic projects, given that many NBS will require a landscape scale / ‘ecosystem’ approach. The costings for the delivery of the GI and biodiversity aspects of the Local Plan could be included in the IDP so that the investment required to bring about delivery is clear and transparent from an early stage and factored into development proposals. Given the significant scale of the work required, consideration should also be given to how the land will be secured to deliver the GI initiatives, whether through direct purchase, lease or management agreements. A long-term approach to the management and maintenance of GI (ideally in perpetuity) also needs to be factored in from an early stage.

Alongside its value for natural capital and placemaking, green infrastructure provides alternative natural greenspaces that can help alleviate and buffer recreational pressures on protected sites. We welcome the recognition of the recreational pressure impacts across Greater Cambridge, and

1 1 Catchment Based Approach (October 2021) Chalk Stream Restoration Strategy: Main Report. See: New strategy launched to protect chalk streams - GOV.UK (www.gov.uk)

the Strategic Initiatives aimed at addressing these (e.g., the Coton corridor and multifunctional GI corridors, Strategic Initiatives 7-8). We support the development of clear policy requirements to address these significant pressures (as suggested in the Topic Paper).

Given the Local Plan’s strong emphasis on GI and the widespread benefits that it can achieve, we feel there is clear value in having a recognised GI standard in place. A standard would help to guide and inform GI planning and delivery and provide a consistent benchmark on quality across different scales/locations of development. It would also support the recommendation in the report for a GI-led design approach to new development. A standard could be supported by other documents, e.g., Local Design Guides, to ensure that nature is fully built into design through the provision of high-quality green infrastructure. Natural England is currently developing a Green Infrastructure Framework to set standards for green space and access to natural greenspaces, as well as a Design Guide and mapping data2 to support this work. We would encourage the use of these resources to guide and inform development of strategic Green Infrastructure and policies for Greater Cambridge. The Framework of GI Standards and products are due for launch in summer/autumn 2022, with a pre-release of the beta mapping and the principles of good green infrastructure in December 20213.

Natural England fully supports the proposed inclusion of policies to improve tree canopy cover, enhance river corridors and protect and enhance open spaces. We advise that robust policy requirements should be included to secure delivery of enhancements through development to ensure the achievement of multi-functional benefits for climate change, biodiversity, water quality, access. As indicated in our comments at the Issues and Options stage tree planting needs to be targeted in appropriate locations and considered in the context of wider plans for nature recovery. Consideration should be given to ecological impacts and the opportunities to create alternative habitats that could deliver better enhancements for people and wildlife, and store carbon effectively. Where woodland habitat creation is appropriate, consideration should be given to natural regeneration, and ‘rewilding’ for the economic and ecological benefits this can achieve.
Any tree planting should use native and local provenance tree species suitable for the location. Natural England advocates an approach which seeks to increase biodiversity and green infrastructure generally, not simply planting of trees, and protecting / enhancing soils, particularly peat soils.

For further advice and guidance on green infrastructure please refer to our comments at the Issues and Options consultation stage.

Wellbeing and inclusion
Natural England is fully supportive of the proposed policies including WS/HD: Creating healthy new developments. Our advice is that the policy should include strong links to the importance of adequate level and quality of accessible green infrastructure for people’s physical and mental health and wellbeing.

Great places
Natural England supports the proposed Great Places policies. We welcome the establishment of a Place and Design Quality Panel to conduct a site typologies study to understand, protect, utilise and enhance the valued characteristics of different areas in the plan, with the intention of using this information to raise design standards to ensure development reflects and enhances Cambridge’s distinctive landscape and townscape character.

We support Policy GP/LC Protection and enhancement of landscape character. Natural England is pleased to see that the Greater Cambridge landscape character assessments have been updated and will provide an up-to-date evidence base for the development of policy GP/LC. Existing retained policies form the South Cambridgeshire Local Plan NH/1, NH/2 and NH/13 and policy 8 of the Cambridge Local Plan should be reviewed and updated in the light of these updated landscape

2 See the GI Framework Mapping Portal: https://designatedsites.naturalengland.org.uk/GreenInfrastructure/Home.aspx 3 How Natural England’s Green Infrastructure Framework can help create better places to live - Natural England (blog.gov.uk)

character assessments to ensure they reflect the most recent baseline evidence.

Policy GP/LC seeks to identify, protect and enhance locally valued landscapes. Any locally designated landscapes, e.g., Areas of Greater Landscape Value, should be identified within the plan and given appropriate policy protection to protect and enhance them and to ensure that development reflects their distinctive character. It is not the role of Natural England to define locally valued landscapes – this is for LPAs and their communities. However, it should be noted that NE considers World Heritage Sites designated for their natural interest, local landscape designations and Inheritance Tax Exempt land to be locally valued. Therefore, these areas should be identified and included on policy maps showing locally designated landscapes along with any ‘Protected views’.

The Strategic Spatial Options Assessment appears to have considered a wide range of options based on up-to-date evidence on landscape and townscape character considerations. We support this approach which is useful in identifying and considering key landscape issues early in the Plan- making process, to feed into the Sustainability Appraisal. We note that the appraisal of the strategic spatial options is based on the interim draft findings of the emerging Landscape Character Assessment. We trust that the preliminary conclusions will be updated following completion of this work. The analysis also notes that recommendations are provided for strategic landscape mitigation and enhancement for each of the strategic spatial options. Natural England supports the proposal to identify specific mitigation as part of more detailed studies in locating and designing future development.

We are generally supportive of policies to protect and enhance the Cambridge Green Belt, achieve high quality development and establish high quality landscape and public realm.

Jobs
Natural England supports proposed policy J/AL: Protecting the best agricultural land. We welcome recognition of soil as a valuable resource and key element of the environmental ecosystem which requires protection, in accordance with paragraph 174 of the NPPF. We note that the protection of peat soils is addressed under the climate change theme discussed above.

Beyond the wider water resource / supply issue, discussed above, we have no substantive comments on the other proposed policies. However, policies will need to include appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Homes
Beyond the wider water resource / supply issue we have no specific comments to make on these proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity. Residential development should also contribute towards delivery of the Strategic GI Initiatives.

Infrastructure
Natural England supports proposed policy I/ST: Sustainable transport and connectivity for the environmental and health benefits this could achieve including reduced emissions, air quality and climate change benefits.

We have no substantive comments on the other proposed policies subject to the inclusion of appropriate requirements to ensure that all development avoids adverse impact to the natural environment and delivers net gains for biodiversity in accordance with the requirements of policy BG/BG: Biodiversity and geodiversity.

Habitats Regulations Assessment (HRA)
Natural England supports preparation of the HRA Report by LUC (August 2021). We welcome that this incorporates a screening assessment and Appropriate Assessment. The Screening stage

identifies likely significant effects on European sites, either alone or in combination with other policies and proposals, for several plan policies. These include:
• Physical damage and loss (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Non-physical disturbance (offsite) – in relation to Eversden and Wimpole Woods SAC.
• Recreation – in relation to Wicken Fen Ramsar SAC and Fenland SAC.
• Water Quantity and Quality – in relation to Ouse Washes SAC, SPA and Ramsar site, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC.
The Appropriate Assessment concludes no adverse effect on site integrity as follows: Eversden and Wimpole Woods SAC
Subject to the following safeguards and mitigation measures being implemented:
• Completion of bat surveys for site allocations identified with moderate or high potential to support barbastelle to determine the ecological value of these sites in relation to this bat species and to inform specific mitigation proposals.
• There is a commitment in the plan that proposed development will avoid key habitat features likely to be used by this species and to create and enhance suitable habitat for this species.
• It is also recommended that policy wording in the plan is strengthened to include specific inclusion of the safeguard measures detailed above and that Policy BG/BG Biodiversity and geodiversity is strengthened to include specific reference that mitigation provided should be suitable to the level of protection afforded to designated sites.

Wicken Fen Ramsar site and Fenland SAC
The Appropriate Assessment concludes no adverse effect on integrity as a result of increased recreational pressure provided that the following safeguards and mitigation measures are required by the plan and successfully implemented:
• A commitment in the plan to ensure that development within 20km of the Ramsar site and SAC to provide sufficient suitable alternative natural greenspace in line with advice from Natural England and that there should be specific detail on the policy on the appropriate quantity and quality of open spaces and how delivery and management in perpetuity will be secured.

The Appropriate Assessment is currently unable to conclude no adverse effect on the integrity of the Ouse Washes SAC, SPA and Ramsar, Wicken Fen Ramsar site, Chippenham Fen Ramsar site, Fenland SAC and Portholme SAC, with regard to water quantity and quality, pending the provision of further evidence through the Greater Cambridge IWMS and the WRE IWMP.

We welcome that the HRA has provided a detailed consideration of air quality impacts, associated with Plan development, for the relevant European sites. This is based on best practice Highways England Design Manual for Road and Bridges (DMRB) LA 105 Air quality guidance and considers the potential for traffic-related emissions on the affected road network based on traffic modelling data, in line with the advice provided by Natural England at the Issues and Options stage. Whilst the assessment has ruled out likely significant effects on all relevant European sites Natural England has been unable to carry out a detailed review of this information and will provide comments at the next stage of Plan consultation.

Please note that Natural England is reviewing the Impact Risk Zone (IRZ) for Eversden and Wimpole Woods SAC to take into account the findings of emerging SAC barbastelle tracking surveys being undertaken for major development schemes. It will also take into consideration the availability of suitable foraging resource which is considered to be quite scarce in the local area. In the meantime, until the IRZ is formally amended, and accompanying guidance prepared, we welcome application of a precautionary 20km buffer zone for SAC barbastelles in line with Natural England’s current local guidance.

Natural England is generally supportive of the interim findings of the HRA and will provide further

advice as the HRA is updated in line with the development of Plan policies and further evidence.

Sustainability Appraisal
Through the Sustainability Appraisal (LUC, October 2021) the preferred policy approaches for the Local Plan have been subject to appraisal against the SA objectives. A range of reasonable alternative options has also been assessed, including alternatives to the preferred policy approaches, Strategic Spatial Options and site options. We welcome that the findings of the HRA will be incorporated into the SA and will provide further insight into biodiversity impacts specifically at designated sites, presenting the opportunity to limit adverse impacts at these locations.

We support recognition of the over-abstraction of water in this region as a serious concern. We welcome acknowledgement that action is required now to ensure the availability of water for future uses without detrimental impact on the environment. Natural England agrees that water resource availability and water quality are inter-related and that these are likely to be exacerbated by the effects of climate change.

The new Local Plan presents the opportunity for new development to come forward at the most appropriate locations in order to avoid detrimental impacts on biodiversity assets. However, we support recognition of potential risks to the ecological network including statutorily designated sites, through degradation and other impacts associated with development.

We agree that the new Local Plan provides the opportunity to promote biodiversity gain and to improve the overall ecological network. Natural England also agrees that opportunities identified through the Green Infrastructure Study (2020) could support delivery of Natural England's Habitat Network nearby opportunity zones and support pollinator corridors. Robust plan policies will need to be developed to secure delivery of these enhancements through all relevant development.

The report concludes that overall, the proposed direction of the Local Plan performs well in sustainability terms with a strong focus on providing an appropriate amount of development and policies focused on minimising carbon emissions, particularly through minimising the need to travel, using land efficiently and making the most of existing and planned sustainable transport links. Natural England suggests this is a premature conclusion in the current absence of strategic water supply infrastructure and sustainable interim measures. Development through the adopted strategy is already being progress without these measures in place. Further development of the Green Infrastructure Initiatives is also required to ensure adequate GI to meet development needs and to alleviate recreational pressures on some of our most sensitive sites habitats. Robust plan policies, to secure timely delivery of this strategic green infrastructure, will be required to demonstrate the Plan’s sustainability.

We generally welcome the policy recommendations presented within Chapter 5 of the SA report including reference to the mitigation hierarchy within Policy BG/BG: Biodiversity and geodiversity and stronger commitments to protect and enhance biodiversity within this and the site allocation policies. However, in our view SA recommendations should focus on the urgent requirement for the identification of strategic and interim water resource/infrastructure solutions and further work to progress the GI Initiatives into real projects.

Natural England will provide further advice as the SA is updated in line with the development of Plan policies and further evidence.

We hope our comments are helpful. For any queries relating to the specific advice in this letter only please contact Janet Nuttall on […]. For any new consultations, or to provide further information on this consultation please send your correspondences to consultations@naturalengland.org.uk.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60011

Received: 08/12/2021

Respondent: Steeple Morden Parish Council

Representation Summary:

Support

Full text:

FORM RESPONSE

Vision and development strategy
Section / Policy Your comments
Vision and aims
How much development, and where – general comments Support the approach to contain any development to major clusters.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support Steeple Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support tightly drawn development boundaries are important to reduce encroachment into the countryside and particularly for linear villages protecting their character. Also assists in delivering exception sites.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity so do we have an obligation to consider where we might generate this locally? There should be clear comments on how and where solar PV farms and windfarms are going to be planned
CC/NZ: Net zero carbon new buildings Should not be specific about not connecting a gas pipe to new housing. This might prevent the future distribution of Hydrogen. Should keep this option open
CC/WE: Water efficiency in new developments Absolutely necessary.
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation. Especially managing hard surface run off.
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding.
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedialaction if required.
BG/GI: Green infrastructure Support for recognition of Pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support particularly providing enhanced protection to existing mature trees.
BG/RC: River corridors Support Steeple Morden has an important tributary of the Cam flowing through the Parish – The Rhee. There should also be recognition enhancement and protection for the brooks which emanate from the aquifer spring line and help feed the river system.
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety Support

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character particularly those villages with a predominantly linear form.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support Need to complete Conservation Area Assessments for villages
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support but condition included that if part of Pub is agreed for another use the marketing policy remains.

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Strongly support particularly in the light of grade I peat soil requiring remedial action and the need for increased food security.
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support but would stress the importance of ensuring that structures are sound.
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support and encouraged where there is no conflict with exception site policy.

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.

Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff from hard surfaces to minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but Improvements required to rural public transport and the last mile congestion into Cambridge City.
I/EV: Parking and electric vehicles Support for rural public charging points at community facilities
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support. Should also include disused railway lines with potential for future use.
I/AD: Aviation development Airfields are an important resource and difficult to replace. Local Plan should recognise the need for National Network of General Airfields.Government National Planning Policy Framework section 106.f, to ensure that planning decisions have regard to the importance of the national network of General Aviation airfields is clear. Environmental health concerns should be taken into account when deciding on housing location to avoid new occupants stress, disappointment and possible conflict.
I/EI: Energy infrastructure masterplanning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Supporting documents on which we are consulting
Policy Your comments
Sustainability Appraisal (incorporating the requirements of the Strategic Environmental Assessment)
Habitats Regulations Assessment

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60088

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60134

Received: 14/12/2021

Respondent: Christopher Blakeley

Representation Summary:

Support the requirement of inclusion of a comprehensive design and access statement and recognise the importance of good design tailored to the local area and involving local communities and Parish Councils particularly in villages.

Full text:

Vision and aims
I support the vision and aims of the Local Plan and the general direction of the development strategy, but am concerned about the overall scale of development and the continuing high levels of growth which are driven by technical economic growth forecasts.

How much development, and where – general comments
I recognise that Greater Cambridge has a strong and nationally important economy, but I do not support the continuing pace and scale of high levels of growth that has increasing cumulative impacts on the environment, water supply, heritage and carbon emissions.
I would argue that the growth of the Cambridge and the impacts of that level of growth on South Cambridgeshire are disproportionately high (a third higher than the government targets) compared with other Local Plans, because the scale of growth is driven by technical economic forecasts studies and the desire to continue to stoke the engine of growth yet again.
The area over the last 30 years has absorbed major levels of development which has brought many benefits and disbenefits.
But the time has come with this Plan, in a new era having to seriously address the causes and impacts of climate change and net zero carbon goals to set t Cambridge on a different course.
The development strategy should with this Plan start to reduce the scale of growth to more manageable levels, perhaps towards the Low option so as to set the direction of travel for the next planning round in the era of climate change .

S/JH: New jobs and homes
The level of new homes proposed in the Plan is driven by the need to enhance economic growth, so much so that it is 37% higher than the Government targets for the area.
This proposes larger amounts of housing growth in the surrounding South Cambridgeshire District to serve Cambridge and the surrounding area.
A large amount of new development proposed in the housing pipeline is already allocated to known sites. A moderated target would lessen the uncertainty of deliverability, ease of the identified water supply issue and give time to for water companies to decide and implement sound options, and reduce climate impacts.
Even a moderate reduction in the housing target, which goes so far beyond what the Government requires, could provide more reserve housing sites, providing flexibility to maintain a five year housing supply, reduce pressure on villages and start to slow the pace of change in an area, which has seen so much cumulative change over the recent decades.

S/DS: Development strategy
I generally support the Development Strategy that supports sustainable development and proposes compact active neighbourhoods in Cambridge, development and /or expansion of new towns connected by good public and active transport and the proposals for very limited new development in the rest of the rural area.

S/SH: Settlement hierarchy
I support the proposed Settlement hierarchy policy area as a means of planning and directing new development towards the most suitable and sustainable locations.
In my comment on the rest of rural area, I am concerned about the impact of unallocated housing windfalls being used by possible speculative planning applications contrary to the development strategy to direct development to the most sustainable locations.
I would suggest that the word indictive in the proposed policy SS/SH is omitted to strengthen and add clarity to the proposed policy in the light of the revised annual windfall target.
Support the reclassification of Cottenham and Babraham villages to provide locations for development and new jobs on good public transport routes.

S/SB: Settlement boundaries
I support the work on the development of Settlement boundaries, especially to protect the open countryside from gradual encroachment around villages and on high quality agricultural land.
The work on settlement boundaries should include the involvement of Parish Councils at an appropriate stage in the development of the Policy because of their local data and knowledge of past development.

Cambridge urban area - general comments
Support in Cambridge urban area for good designed, active compact new developments, reuse of brownfield land and continued development of larger neighbourhoods where possible.

S/NEC: North East Cambridge
Support the development of NE Cambridge as a sustainable neighbourhood with good public transport and active transport into Cambridge

Edge of Cambridge - general comments
Support edge of Cambridge planned new neighbourhoods and new sustainable developments and settlements of sufficient size to cater for daily needs and with good access to public and active transport

New settlements - general comments
Support for new settlements of substantial size to cater for more than local needs. I particularly support the growth of Cambourne which can provide good rail access into Cambridge and to the West in the mid-term from new East West rail infrastructure.

S/BRC: Babraham Research Campus
Support the release of land from the Green Belt to support nationally important R and D and life science jobs located near to public transport routes and active transport.

S/RSC: Village allocations in the rural southern cluster
NB, Policy has different name on map page.
In accordance with reducing carbon emissions, and supporting access to the existing rail network the villages of Shelford and Whittlesford could be locations for more sustainable development, despite Green Belt locations

S/SCP: Policy areas in the rural southern cluster
Support existing site allocations to be carried forward including the expansion of Babraham research campus using Green Belt land

Rest of the rural area - general comments
I support the development strategy approach which directs new development to a limited number of sites in the most sustainable development locations supporting the sustainability of villages.
There is still the matter of the unallocated housing windfall development identified in the strategy Topic Paper of 5345 homes for 2021-2041 which is not included in the additional allocated land target of the 11596.
The anticipated dwellings per year for SCDC is between 240 and 255 dwellings a year. Notwithstanding the proposed policy SS/SH, there is a risk that developers will seek speculative permission in the open countryside greenfield sites contrary to the development strategy using the windfalls allocation and I have made a comment on this on Policy SS/SH.

Climate change - general comments
All new development will have impacts relating to increasing carbon emissions and require adaptation responses. A Local Plan can only seek to mitigate these impacts and by far the most impacts are from the existing development, their use and getting around using carbon fuelled transport.
The rate of change in and around Cambridge over the past 30 years has been significantly greater than for just local needs, mainly to develop nationally important economic development. This Plan continues this approach despite the issue of climate change and water supply and large amounts on new development still to be implemented from current Local Plans.
I would argue that the time has now come to step back from this direction of travel and begin to reduce the scale of growth around Cambridge using the Low option as a first step.
I was hoping, given the aims of the Plan and the input of the Net Zero Carbon study for a more radical Plan which addressed climate change and zero carbon targets through aiming to reduce the total amount of new development to meet local needs need and move to a position which is in line with Government targets in the next planning round.

CC/NZ: Net zero carbon new buildings
Support in general
Although I have concerns about how for example heat pump technology can be installed and used at reasonable cost in new development.

CC/WE: Water efficiency in new developments
Support, important given the water supply issues coming forward up to 2041

CC/DC: Designing for a changing climate
Support especially with regards balancing insulation and overheating with increasing hot to very hot summers risk brought about through a changing climate.
Site wide approaches should include appropriate lower densities through good design which allow for beyond minimum garden space and space for Suds and open space and greening.

CC/FM: Flooding and integrated water management
Support
Especially permeable surfaces and integration of water management with enhancements to biodiversity and greening.

CC/CS: Supporting land-based carbon sequestration
Support the creation of land for use as carbon sinks through the development process. Perhaps a suitable use of land in the Green Belt or on lower grade agricultural land.

Biodiversity and green spaces - general comments
Support the identification of 14 strategic GI initiatives and enhancing the linkages between GI and open spaces to provide corridors for wildlife.

BG/BG: Biodiversity and geodiversity
Support delivery of a minimum 20% biodiversity net gain.
I would comment that funding for long term management of biodiversity assets is key for the long-term benefits from such a policy.
I could also emphasis the creation of winter wet areas, water space and Suds designed to benefit enhanced biodiversity should be planned in to developments at an early stage

BG/GI: Green infrastructure
Support the use of a GI standard, particularly on larger developments.
In particular early identification of GI and biodiversity assets and potential gains as an early part of the design process and /or planning brief

BG/TC: Improving Tree canopy cover and the tree population
Support increasing tree and woodland cover, ensuring right tree(s) in right places and species futureproofed for lifetime changing climate adaptation.
A particular opportunity is the rural field margins of agricultural land to help increase the linkages and biodiversity gains and in specific places the creation of woodland belts in the open countryside, green belt land and around villages.
In Cambridge urban areas, where there are existing trees there is a need to plan their replacement with adaptation species to gradually adapt to a changing climate.
Also, to provide sufficient future tree cover to mitigate the urban heat island effect, provide shade and mitigate microclimatic effects.

BG/RC: River corridors
Support the protection and enhancement of river corridors and restoration of natural features and use of GI to support the alleviation of flooding risk.
Support the delivery of the continuous Cam Valley Trail.

BG/PO: Protecting open spaces
Support the protection of the wide variety of open spaces and use of Local Green Space designation in appropriate locations

BG/EO: Providing and enhancing open spaces
Support the provision of open space and recreation provision, including appropriate play space.

WS/HD: Creating healthy new developments
Support the use of health impact assessments in proposals.
I would comment that with the increase in ride on electric vehicles and increasing older communities there are opportunities to coordinate with transport professional the delivery of smooth pathways with minimal dropped kerbs which gives smoother access to local centres and bus stops linked to older persons housing and also can prevent falls.

GP/PP: People and place responsive design
Support the requirement of inclusion of a comprehensive design and access statement and recognise the importance of good design tailored to the local area and involving local communities and Parish Councils particularly in villages.

GP/LC: Protection and enhancement of landscape character
Support the use of landscape character assessment to enhance the setting of Cambridge and protect and enhance the setting of villages.

GP/GB: Protection and enhancement of the Cambridge Green Belt
National guidance places great importance on Green Belt policy and sets out how planning proposals should be considered.
I support the use of GI and other opportunities to provide access and increase tree and woodlands where appropriate in the Green Belt.
But I think where there are locations where there is good public transport especially rail access or future rail access there is a good case to consider the special circumstances judgment.
I think it is time to question if this national policy is still relevant to the situation Greater Cambridge in the period up to the middle of the century. Further Green Belt assessments may be better served by considering sustainable development and the extension of the Green Belt to prevent coalescence around villages beyond the current Green Belt boundary which was made before most of the new development (over 70%) is beyond the current outside boundary or further modification of this policy to enable growth to be planned for the 21st century rather than the conditions which related to the last century.

Jobs – general comments
I am concerned about the scale of economic growth in the area and its use to drive large amounts of housing growth well about what would be required in other planning areas.
However, I support the life science sector and its national importance and the appropriate development in science parks including their expansion using Green Belt land

J/AL: Protecting the best agricultural land
Support the restriction of development on the best agricultural land as supported in the Sustainability Appraisal.

Homes – general comments
Support the objective for planning enough housing to meet our needs, including affordable housing to rent or buy.
I object to needs being directly driven by future economic assessments, the direction of travel of the plan should be as much balanced by the climate change as future economic demand.

H/HD: Housing density
Support design led approach to determine optimum capacity of sites and appropriate density to respond to local character, especially in villages.

H/GL: Garden land and subdivision of existing plots
Support for controlling the use of gardens for new development.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60213

Received: 11/12/2021

Respondent: Dr J. Valerie Neal

Representation Summary:

The Friends of St Matthew’s Piece also seek for the provisions of existing Policy 60 (on tall buildings) in the New Local Plan to be fully retained and also strengthened so that the wording of the Policy can be fully enforced by Planning Officers.

Full text:

I have looked at your short tick-box ‘survey’ and your ‘detailed response’ mechanisms and find both wholly unsatisfactory. The former leads me by the nose without permitting any opportunity to express my views; the latter is too cumbersome. Options to use phones, apps etc. are of zero benefit to me; I do not own a smart phone. Per the Gunning Principles emphasised in your department’s Webinar on 4 November 2021, please confirm that the content of my following brief comments will be:
• noted;
• recorded;
• counted; and
• conscientiously taken into account with other public feedback.

On water issues, I fully endorse the Consultation Response of the Friends of the Cam on the Draft Local Plan (see https://www.friendsofthecam.org/sites/default/files/ObjectiontoNext%20LocalPlan_0.pdf)
On trees, I draw to your attention the very recent report by the Forestry Commission (see https://www.forestresearch.gov.uk/research/valuing-the-mental-health-benefits-of-woodlands/) regarding the vital importance of improving, enhancing, protecting and preserving tree cover. This must be delivered everywhere in and around Cambridge, but especially where tree canopy cover falls below the already meagre average for our area – in order to reduce entrenched disadvantage (per the well established principles of ‘Doughnut economics’; see https://doughnuteconomics.org/principles-of-practice).

Focussing on my immediate area, north Petersfield in Cambridge, as an active supporter of the Friends of St Matthew’s Piece, I stress the need to both retain and strengthen the provisions of the existing 2018 Local Plan Policies 23 and 60 (see https://tiny.cc/FoSMP23and60). Petersfield is the most densely populated ward in Cambridge, and the ward with both the poorest tree canopy cover and worst open-space provision (see https://tiny.cc/FoSMPtrees4 & https://tiny.cc/FoSMPappsIV-V).

The Friends of St Matthew’s Piece therefore seek for the provisions of existing Policy 23 in the New Local Plan to explicitly protect and preserve the northern half of St Matthew’s Piece and its invaluable trees. Although partly ‘Protected Open Space’, and not designated as a potential development site under the 2018 Local Plan, this area still lies within the boundary of the ‘Eastern Gate Opportunity Area’. Any possible ambiguity must be explicitly removed for both for the northern half of St Matthew’s Piece and also Abbey Ward's New Street Allotments (there are no allotments at all within Petersfield).

The Friends of St Matthew’s Piece also seek for the provisions of existing Policy 60 (on tall buildings) in the New Local Plan to be fully retained and also strengthened so that the wording of the Policy can be fully enforced by Planning Officers, as explained very briefly here: https://tiny.cc/FoSMP23and60.

Many local residents hold strong views on the First Proposal's inclusion of a possible development site on St Matthew’s Street – for 12 houses to be constructed in place of the existing garages. I wish here to stress the fundamental needs to both:
• protect and fully preserve the magnificent mature tree at the eastern edge of the site; and
• take full account of any increased stress to water and drainage/sewerage systems in evaluating any future proposals.