As a general comment, Historic England welcomes emerging plan and work undertaken to date. We have however identified below some of the key issues to be
addressed in progressing the next iteration of the Plan.

We therefore welcome your commitment to undertake Heritage Impact Assessments for site allocations. These should be prepared prior to the next draft of the Local Plan (detailed comments on approach provided in attached representation letter).

We welcome your intention to include a policy for the Historic Environment. You should also include a policy for Heritage at Risk and a policy for historic shopfronts.

Given the growth pressures that we would anticipate
Cambridge is likely to experience over the coming years, we are pleased to see that the matter of Tall buildings and the skyline will be addressed in policy (detailed comments on approach provided in attached representation letter).

We broadly welcome the Strategic Heritage Impact Assessment including the baseline study of the setting of Cambridge. However, we have expressed some concerns regarding some aspects of this baseline, in particular the weighting given to some of the key characteristics and aspects of setting of Cambridge including views. We welcome the evidence in relation to landscape character assessment. We do however continue to suggest that it would also be helpful to commission Historic Landscape Characterisation work for inform this Plan and future growth in the area.

Full text:

Thank you for consulting Historic England on the First Proposals Public Consultation for the Greater Cambridge Local Plan. As the Government’s adviser on the historic environment Historic England is keen to ensure that the protection of the historic environment is fully considered at all stages and levels of the local planning process.

Cambridge is a beautiful, compact and historic city. It is also an historic seat of learning with a very high concentration of highly graded heritage assets. Much of the city is covered by Conservation Area status. The river corridor, green fingers and open spaces, with cows grazing in meadows even at the heart of the city, shape the character of the townscape and landscape.

Although a relatively flat landscape, the elevated positions to the west and south of the Cambridge afford important views across the city skyline, which is one of extensive tree cover and emerging spires. The flatter Fens landscape to the north and east provides very long-distance views of the City and the big east Anglian skies.

The surrounding rural hinterland of South Cambridgeshire comprises over 100 villages, each with their own unique character and heritage. New settlements are an important feature of the district, with their own special identity and are growing rapidly.

We recognise the area faces intense pressure for growth, driven by both the economic success and the attractiveness of the area, in large part a consequence of

its rich architectural and cultural heritage. This growth must be carefully managed to ensure that the very things that contribute to its success are not harmed in the process.

It is for this reason that Historic England is keen to ensure that the emerging plan gives full consideration to the historic environment, both in the choice of site allocations and policy criteria for sites, as well as through a robust and clear suite of historic environment and other policies that seek to both protect but also enhance the historic environment.

We have reviewed the Draft Plan and consultation material with a view to providing advice on heritage matters.

As a general comment, Historic England welcomes emerging plan and work undertaken to date. We have however identified below some of the key issues to be addressed in progressing the next iteration of the Plan: This should be read in conjunction with Appendix A which provides more detailed comments on these and other more minor issues.

a) Site Assessment and the need for Heritage Impact Assessments

We are pleased to note that a degree of site assessment has already been undertaken in relation to the historic environment. These are set out in the HELAA Report, especially Appendix 4.

To date, the assessment of sites is fairly high level and brief but provides a useful starting point, in particular helping to identify immediate showstoppers. We note that many of the sites are shown as amber.

As we have discussed previously, the need for further assessment of heritage in terms of significance, impact on that significance, potential mitigation and enhancements etc will be needed for the site allocations. There is currently an insufficient evidence base in this regard. We therefore welcome your commitment to undertake Heritage Impact Assessments for site allocations. These should be prepared prior to the next draft of the Local Plan.

This further assessment, known as Heritage Impact Assessment (HIA) should follow the 5 step methodology set out in out in our advice note, HEAN 3 on Site Allocations in Local Plans https://historicengland.org.uk/images- books/publications/historic-environment-and-site-allocations-in-local-plans/.

HIAs should be proportionate (both to the scale of the site and the assets affected). All potential sites will need to be appraised against potential historic environment

impacts. It is imperative to have this robust evidence base in place to ensure the soundness of the Plan. We recommend that the appraisal approach should avoid merely limiting assessment of impact on a heritage asset to its distance from, or inter-visibility with, a potential site.

Site allocations which include a heritage asset (for example a site within a Conservation Area) may offer opportunities for enhancement and tackling heritage at risk, while conversely, an allocation at a considerable distance away from a heritage asset may cause harm to its significance, rendering the site unsuitable.

Impacts on significance are not just based on distance or visual impacts, and assessment requires a careful judgment based on site visits and the available evidence base. Cumulative effects of site options on the historic environment should be considered too.

The following broad steps might be of assistance in terms of assessing sites:

• Identify the heritage assets on or within the vicinity of the potential site allocation at an appropriate scale
• Assess the contribution of the site to the significance of heritage assets on or within its vicinity
• Identify the potential impacts of development upon the significance of heritage asset
• Consider how any harm might be removed or reduced, including reasonable alternatives sites
• Consider how any enhancements could be achieved and maximised
• Consider and set out the public benefits where harm cannot be removed or reduced

The HIAs should assess the suitability of each area for development and the impact on the historic environment. Should the HIA conclude that development in the area could be acceptable and the site be allocated, the findings of the HIA should inform the Local Plan policy including development criteria and a strategy diagram which expresses the development criteria in diagrammatic form.

Which sites require HIA?

Ideally all sites should have an HIA, albeit proportionate to the site and heritage sensitivities.

For existing allocations being carried forward into this Local Plan, the HIA is less about the principle of development (that has already been established through previous plan allocation) and more about exploring capacity, height, density and any heritage mitigation and enhancement opportunities so that these can then be

included in the updated policy wording.

For new allocations, the HIA will be a more holistic view and consider both the principle of development as well as the other matters identified above.

b) Policy Wording for sites

If, having completed the heritage impact assessments, it is concluded that a site is suitable for allocation, we would remind you to include appropriate policy criteria for the historic environment in the policy. Please refer to the advice we give on policy wording in the attached table.

It can be helpful to refer to an HIA in the policy wording. Concept diagrams can also be useful to include in the plan to illustrate key site considerations/ recommendations.

c) Edge of Cambridge sites

The Plan proposes carrying forward a number of partially built out allocations on the edge of the City as well as some minor extensions to these. The Plan also proposes revisiting the dwelling capacity/density for some of these sites e.g. Eddington.

Proposals for North East Cambridge are very high density and also quite tall.

The Plan also includes a very large new allocation at East Cambridge (previously released from the Green Belt and allocated in the 2006 Plan, although not in the 2018 Plan). The number of dwellings now being proposed represents a significant increase in density from the 2006 Plan.

We have some concerns regarding these densities and heights on edge of Cambridge sites. Development at very high densities/heights and the potential impact on the overall setting of this historic city. HIAs should give careful consideration to the issue of development and site capacity and height – we will be looking for evidence in this regard.

d) Historic Environment Policy

We welcome your intention to include a policy for the Historic Environment. This should cover both designated and non-designated heritage assets. Policy wording should be in line with the NPPF but we are also looking for a local flavour.

Policies should be spatially specific, unique to the area, describing the local characteristics of the area and responding accordingly with policies that address the local situation.

You should also include a policy for Heritage at Risk and a policy for historic shopfronts. For further detail see Appendix A.

e) Design Policy

We welcome the proposals for a design policy on the plan. We note that this policy is also intended to address tall buildings. We are concerned that the policy might become overly long and detailed, given it is covering such a wide and important range of issues and wonder whether separating out tall buildings into a separate policy might be helpful?

f) Tall Buildings Study and Policy

Related to the above, given the growth pressures that we would anticipate Cambridge is likely to experience over the coming years, we are pleased to see that the matter of Tall buildings and the skyline will be addressed in policy.

We had understood that you were commissioning a study in relation to tall buildings and the skyline policy. Is this still proposed to inform the policy in the next draft of the Local Plan?

See our advice note HEAN 4 and the consultation draft of HEAN 4. Any policy should indicate what considerations are needed for taller buildings, where buildings may or may not be appropriate etc. and in particular consider in the impact on the historic environment.

We broadly welcome policy 60 and Appendix F of the 2018 Cambridge City Local Plan. However, we consider that this could be further supplemented to indicate which areas may or may not be suited to taller buildings. Our advice note in relation to tall buildings provides further guidance in this respect

We have been having discussions with the team preparing The North East Area Action Plan in relation to tall buildings studies and have provided a detailed advice letter in that regard. Please refer to our advice letters in relation to NEA Action Plan and tall buildings for further information on our position.

g) Other Supporting Evidence

We welcome the preparation of the HELAA although consider that further, more detailed evidence is needed in relation to heritage impact and so welcome your intention to prepare HIAs for site allocations.

We broadly welcome the Strategic Heritage Impact Assessment including the baseline study of the setting of Cambridge. However, we have expressed some concerns regarding some aspects of this baseline, in particular the weighting given to some of the key characteristics and aspects of setting of Cambridge including views. Further detail is given in Appendix A.

We welcome the evidence in relation to landscape character assessment. We do however continue to suggest that it would also be helpful to commission Historic Landscape Characterisation work for inform this Plan and future growth in the area.

We welcome the production of the Sustainability Appraisal. We would comment however that since many of the site allocations are grouping together under particular policies, the different impacts for individual sites are not always drawn out in the assessment tables – this sometimes has the effect of neutralising the scoring.

Historic England – Ox Cam research work

Historic England has commissioned consultants to undertake some work looking at development in the OxCam Arc. ‘Measuring Impact: Managing Change’ looks at the question, ‘How should the form of growth in the Oxford-Cambridge arc positively respond to the Historic Environment’. This research is due to report in the next few months and we hope to be able to share this with you at that time as it may provide useful evidence to inform your Local Plan work.

Other comments

In preparation of the forthcoming Greater Cambridge Local Plan, we encourage you to draw on the knowledge of local conservation officers, archaeologists and local heritage groups.

Please note that absence of a comment on an allocation or document in this letter does not mean that Historic England is content that the allocation or document forms part of a positive strategy for the conservation and enjoyment of the historic environment or is devoid of historic environment issues. Where there are various options proposed for a settlement, identification of heritage issues for a particular

allocation does not automatically correspond to the support for inclusion of the alternative sites, given we have not been able to assess all of the sites.

Finally, we should like to stress that this opinion is based on the information provided by the Council in its consultation. To avoid any doubt, this does not affect our obligation to provide further advice and, potentially, object to specific proposals, which may subsequently arise where we consider that these would have an adverse effect upon the historic environment.

We trust that these comments are helpful to you in developing the Local Plan. Should you have any queries, please do not hesitate to contact us.

We suggest it might be helpful to set up a meeting to discuss our comments and, in particular, heritage impact assessments and policy wording for site allocations.
Please feel free to suggest some dates.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59698

Received: 13/12/2021

Respondent: Central Bedfordshire Council

Representation Summary:

Great Places
We support your aim for the delivery of great places through policies that sustain the unique character of Cambridge and South Cambridgeshire and compliment the area with beautiful and distinctive new development, creating a place where people will want to live, work and play.
The themes from the Cambridgeshire Quality Charter for Growth covering the four “Cs” of Community, Connectivity, Climate and Character is a sensible approach consistent with the National Model Design Code.

Full text:

Introduction
Thank you for consulting Central Bedfordshire Council (CBC) on the first proposals consultation for the Greater Cambridge Local Plan 2041. Please accept this letter as our formal response. We welcome the opportunity to respond to the proposals in this consultation and look forward to continuing the good working relations that CBC has already forged with the two substantive authorities. We have provided some comments below on the consultation documentation which we hope are useful. Please do not hesitate to contact us if you have any further questions.

General Comments on Strategy

Overall, the Council supports the approach you have taken in terms of undertaking a joint local plan to ensure a consistent approach to planning and building across both Cambridge City Council and South Cambridgeshire District Council up to 2041.

We support the proposed Vision for the Greater Cambridge Plan especially as it places climate impacts at the heart of key decisions. It states that Greater Cambridge will be a place where a big decrease in your climate impacts comes with a big increase in the quality of everyday life for all your communities. It also promotes new development minimising carbon emissions and reliance on the private car; creating thriving neighbourhoods with the variety of jobs and homes you need; increasing nature, wildlife and green spaces; and safeguarding your unique heritage and landscapes. CBC considers this to be a laudable, succinct overarching Vision that we hope you will be able to carry through to effective policy and decision-making on the ground.

CBC considers that the proposed strategy outlined within the First Proposals could help ensure that Greater Cambridge makes a valuable contribution to the Oxford to Cambridge Arc and to the overall delivery of the Government’s ambitious growth aspirations. However, the Council considers that it would be useful to include reference to the emerging Arc Spatial Framework, identifying that alongside the NPPF, this will set the overarching strategic framework for the area with which all local plans within the Arc must accord. CBC would be keen to understand the timescales for the delivery of the Greater Cambridge Plan and how the emerging Spatial Framework will be taken into consideration to inform future iterations of the plan.

We appreciate that the Plan is at an early stage of development, and at the current time you are considering locations that could be delivered alongside allocated sites being carried forward from the adopted 2018 Local Plans for Cambridge and South Cambridgeshire, as well as sites which already have planning permission.

We note that you are proposing to meet in full your objectively assessed needs of 44,400 new homes to 2041, which is supported by CBC and is necessary to ensure needs can be met across the area.

CBC recognises that Cambridge has seen significant economic and jobs growth in recent years and that there is an ambition to maintain this direction of growth as the impacts of the recent pandemic subside. As stated in our comments made in response to your Issues and Options Consultation in February 2020, we would not support a level of jobs growth that could detrimentally impact upon the ability of neighbouring authorities, such as Central Bedfordshire, to meet and deliver their own economic ambitions and growth aspirations. CBC therefore supports the housing numbers proposed to meet the OAN and the identified buffer and welcomes the move away from the higher job number which were put forward in your Issues and Options consultation. We agree that the higher jobs forecast previously considered would not be the most appropriate scenario to pursue. Overall, CBC considers that the proposed level of housing of 44,400 new homes and complementary economic growth of 58,500 new jobs across all sectors including business, retail, leisure, education and healthcare, is an appropriate level of growth to deliver for over the plan period.

The First Proposals have suggested 19 new possible locations that might be suitable for additional development to meet your needs across the Greater Cambridge area up to 2041. Overall, CBC supports the proposed approach taken to the geographical spread of these sites and welcomes the inclusion of sites in the most sustainable locations around the Cambridge urban area and on the outskirts of the City, where existing and future residents can take most advantage of the proximity to jobs and services using public transport and active travel options. The proposals to direct development to where it has the least climate impact, where active and public transport is the natural choice is logical and fully supported.

It is noted that the consultation material suggests that the majority of your objectively assessed need can be provided for in the core preferred strategic sites of North East Cambridge, Cambridge East and Cambourne. This approach is supported as the locations will reduce potential climate impacts through the delivery of well connected, sustainable, compact development where active and sustainable travel can be maximised.

CBC have not provided detailed comments on all of the proposed 19 sites included within the consultation material but note the proposals for new strategic scale development at Cambourne which lies in close proximity to Central Bedfordshire. It is noted that in total, there are 3 development sites proposed for Cambourne - two of these are existing allocations; Cambourne West which has capacity for 2,590 units and Bourn Airfield which has capacity for 2,460 units, alongside a new proposed broad location for growth at Camborne - expected to deliver 1,950 homes.

CBC recognises that whilst a final decision has not yet been announced, the preferred East West Rail route between Bedford and Cambridge will likely result in a new stopping station at Cambourne and that this will transform the area, maximising sustainable opportunities for growth. Whilst we support the opportunities that the proposed new station would potentially bring, CBC would suggest that any future transport impact assessments and traffic modelling associated with the proposals should consider the cumulative impacts of both existing and proposed development at Cambourne and any implications for the wider area, including potential impact upon the strategic and local road network within Central Bedfordshire. It is likely that there will be cumulative impacts from growth at Cambourne on communities within CBC related to an increase in demand on the A1, particularly if / when the A428 dualling and Black Cat works are carried out, and also the more minor roads through areas like Potton, Sandy, Biggleswade. Whilst outside of the Greater Cambridge plan area, the capacity of the A1 in this area is already a key concern that affects a much wider area and must be considered carefully and comprehensively when decisions are being made in relation to future growth.

We would, therefore, welcome further engagement to understand the scale of those impacts and their likely implications for Central Bedfordshire communities as the work on the local plan and the sites themselves, progresses. We would welcome being involved in early engagement with National Highways in relation to these impacts. We would also be keen to look at opportunities to secure sustainable links (via public transport) between CBC and the development areas to the west and south of the Greater Cambridgeshire area.

As noted above, whilst a formal decision is yet to be announced in relation to EWR between Bedford and Cambridge, or indeed the location of a new stopping station at either Tempsford or to the south of St Neots, CBC consider it essential that the Greater Cambridge Plan considers the wider context of strategic growth within the Arc, particularly in terms of future connectivity opportunities that will undoubtedly arise as proposals within neighbouring authority areas emerge. Your approach to enabling some development within smaller villages is supported as this will support rural services and the vitality and viability of villages and their shops and services contributing to overall sustainability. We appreciate that it is unsustainable to encourage high levels of growth where car travel predominates and that therefore, in smaller villages you will continue to support infill development and affordable housing on suitable sites only. This approach is supported, especially given the very rural nature of the areas close to the Central Bedfordshire border.

The 7 Themes
We welcome the approach taken in this consultation to identify 7 key themes and we have provided some high-level comments on each of them below. It is understood that each of the themes will influence how you will plan homes, jobs and infrastructure and ultimately where growth will be directed. In our previous response to the Issues and Options stage of consultation (February 2020) we suggested that “connectivity” both within and beyond the Greater Cambridge area should perhaps be considered as an additional theme. Whilst we note this suggestion has not been taken onboard, CBC considers that connectivity is the ‘golden thread’ that runs through all the key themes and could potentially be referenced as such within the Greater Cambridge Plan.

Climate Change
We support your aim to help Greater Cambridge to transition to net zero carbon by 2050 through a number of comprehensive measures including ensuring that development is sited in places that help to limit carbon emissions, is designed to the highest achievable standards for energy and water use and is resilient to current and future climate risks. It is clear that responding to climate change has influenced the shape of the plan as an important factor in determining where future development should be located and how it should be built. CBC would be keen to have future conversations to share experiences and to understand how net zero carbon can be achieved in terms of viability, and to explore how this can be monitored to ensure the approach is successful. In terms of detailed policy, Policy GP/QD could benefit by also referring to building orientation to maximise the opportunities for renewables.

Biodiversity and Green Spaces
We support your aim for biodiversity and green space policies to increase and improve your extensive network of habitats for wildlife and green spaces for people, ensuring that development leaves the natural environment better than it was before. We also welcome confirmation that the Oxford to Cambridge Arc Environmental Principles have informed your approach to this theme, in particular, we welcome and support the ambitious policy to require 20% Biodiversity Net Gain. As this will be an issue for all Local Authorities within the Arc, CBC would also be keen to discuss how this could be delivered and the impacts this might have not only on site viability, but
the delivery of other key services and facilities across the Arc .

Wellbeing and Social Inclusion
We support your aim of helping people in Greater Cambridge to lead healthier and happier lives ensuring everyone benefits from the development of new homes and jobs.

Great Places
We support your aim for the delivery of great places through policies that sustain the unique character of Cambridge and South Cambridgeshire and compliment the area with beautiful and distinctive new development, creating a place where people will want to live, work and play.
The themes from the Cambridgeshire Quality Charter for Growth covering the four “Cs” of Community, Connectivity, Climate and Character is a sensible approach consistent with the National Model Design Code.

Jobs
CBC supports the aim of your proposed jobs policies in terms of encouraging a flourishing and mixed economy which includes a wide range of jobs while maintaining the areas global reputation for innovation. The Council considers the policies are positive and forward thinking in the current climate in that they seek to reflect how the approach to working environments is changing, by supporting remote working and improving facilities on employment parks.
We support the inclusion of a remote working policy but consider that it could be strengthened to refer to the provision of home office space in new dwellings as the emphasis is currently on the delivery of external hubs or extensions of existing dwellings.

Homes
As commented above, the Council supports the proposed strategy to plan for and deliver enough housing to meet your objectively assessed needs, including significant amounts of affordable housing and a mix of tenures to suit your diverse community’s needs. The proposed policy requiring 40% affordable housing in new developments is particularly supported.

Infrastructure
We support the approach taken that the relationship between jobs and homes and sustainable transport opportunities has been a key consideration and influence of the development strategy proposed. Recognising that infrastructure is not limited to the provision of new roads, CBC also supports the recognition for the need to consider and plan for water, energy and digital networks, and health and education and cultural facilities in the right places and at the right times to ensure your growing communities are supported. Looking to the future, your policies on electric vehicle charging points and digital infrastructure will be key given the need to move away from carbon-based vehicle fuels and the shift to homeworking that has been accelerated by the pandemic. We also note that whilst there is an objective for Air Quality within the Sustainability Appraisal, there is no objective included for Transport and Access.

We welcome this opportunity to comment on this latest stage of your development plan proposals and largely offer our support to the approach you have taken. We also appreciate how you have digitally presented and structured the documentation in order to make it as accessible as possible to everyone. The use of maps and diagrams throughout the document is an effective way of setting out the context and portraying the information within the text. In addition, the ability to explore the documentation through the “themes” and “maps” is a particularly helpful way of organising the consultation.
I hope you find these comments useful and look forward to continued engagement as your plan progresses.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 59782

Received: 13/12/2021

Respondent: Mr Barrie Hunt

Representation Summary:

To the question “How does this intersect with the other themes?”, might “its residents feel ownership of local decisions that affect their lives” be added?

Full text:

) To the question “How does this intersect with the other themes?”, might “its residents feel ownership of local decisions that affect their lives” be added?
The proposals for Policy GP/QP: Establishing high quality landscape and public realm include “Ensure that new and existing public realm seamlessly connects”. It would be helpful for proposals for GB1/2 to be reviewed against this proposal.

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60202

Received: 13/12/2021

Respondent: John Preston

Representation Summary:

The Great Places paper refers to Heritage Assets, but completely fails to recognise that the city of Cambridge is a heritage asset of worldwide significance which meets UNESCO’s Outstanding Universal Value criteria for World Heritage status. The draft Plan also fails to recognise the historic relationships between Cambridge as a market town, its market, and its productive hinterland.

Cambridge’s special character has been, and continues to be, under severe threats from the quantum of already approved growth (built developments and pressures on both streets and green spaces).

Overall, the Evidence base for Great Places is inadequate, and the proposals are premature pending a thorough review of the success or failure of existing policies.

Full text:

Vision and development strategy
Vision and aims
THE VISION
The vision is contradictory, misconceived and undemocratic, unquestioning, unachievable, and based on inadequate evidence. The draft Plan and this whole consultation are premature.

It is contradictory in that the vision of a big decrease in climate impacts is totally undermined by blindness to fundamental incompatibilities between growth and carbon reduction. Its claims of sustainability and Net Zero are not credible given that the carbon costs of construction are not included in the Plan’s definition of a Net Zero Carbon building.

It is misconceived and undemocratic in that it claims to want “the variety of homes and jobs we need” when all the proposed options involve levels of growth dictated by a combination of Government fiat (through both imposed housing targets and four growth corridors led by the Ox Cam Arc) and the ambitions of a local oligarchy (exemplified by Cambridge Ahead) which is unrepresentative of the people of Greater Cambridge. The Arc proposals are in direct conflict with the “levelling up” agenda, will not deliver “levelling up” in terms of Cambridge’s inequalities (notably affordable housing) and should not be taken as justification for the level of growth being proposed (https://smartgrowthuk.org/wp-content/uploads/2021/09/The_Overheated_Arc_Part_3_September_2021.pdf).

The Plan’s “predict and provide” approach fails to even question the desirability or deliverability of this imposed growth. Nor does it begin to tackle the severe challenges arising from past and present growth, notably in terms of affordability (in the most unequal city in England), and transport capacity issues (first identified by Holford 70 years ago), both of which have been exacerbated by growth, and will be further exacerbated, not diminished, by the growth now proposed.

It is unachievable in that
a) it ignores environmental capacity limits, most immediately in relation to water issues, but also in relation to the physical character of Greater Cambridge, and the capacity challenges of accommodating the intense activity of a 21st century city within the built fabric and spaces of a historic University town and its hinterland.
b) its claims to increase nature, wildlife and green spaces rely on a quantum of development that, considered holistically, will have an opposite effect.
c) the Plan’s growth proposals will compound the damaging impacts of current growth on our unique heritage and landscapes.

Its evidence base is incomplete and inadequate. Inexcusably, it has no assessment whatever of environmental capacity (a fundamental issue for the Plan) other than in relation to water supply. The Climate change evidence is inadequate and misleading, notably because it uses a definition of Net Zero Building which omits the embodied carbon of construction. There is no review or assessment of the success or failure of current local plan or other policies. This is compounded by the woefully inadequate historic environment evidence base, which has no strategic consideration of Cambridge as a world famous historic city, and is so incomplete that it only mentions one Conservation Area Appraisal (the Historic Core) when all the city’s Conservation Areas are covered by Appraisals, and fails to use the readily available evidence contained within them.
The draft Plan and the whole consultation are premature pending
1) A thorough understanding and appreciation of the current character of Greater Cambridge and its environmental capacity
2) The forthcoming Water Resources East consultation on the Regional Water Plan, on which these proposals depend
3) Transport solutions which can be accommodated in the space available, including those currently and imminently out for consultation on transport capacity and links within and outside the city.

THE AIMS
The Plan’s aims do not include what is arguably the most vital: how to maintain, enhance, and provide more equitable access to what makes Cambridge special, in the face of the combined challenges of growth and Climate Change. This should be a key priority of the Historic Environment Strategy which is required by the NPPF, but absent from the First Proposals.

As someone from the Tech industry said in a meeting last year with Stephen Kelly, Director of Planning: “Malta has concrete high rises, no one goes there. The Tech sector comes here because it’s a nice place to be. If Cambridge takes a predict and provide approach, it will accelerate into catastrophe.”

How much development, and where – general comments
No more development allocations until issues arising from existing approved growth have been identified and tackled. This means waiting for the Regional Water Plan and coherent publicly-endorsed proposals for tackling existing congestion and capacity issues, challenging the assumptions underlying the Ox Cam Arc, and carrying out a holistic assessment of environmental capacity and the limits to growth. All in line with the principles of Doughnut Economics which the City Council says that it has adopted.

The evidence base is seriously inadequate in relation to environmental capacity. There is no evaluation of the success or failure of existing policies in maintaining the special character of Cambridge, an aim which the new Plan seeks to maintain. Such consideration needs to include not only impacts of the form, scale and location of new development, but also of the transport and other infrastructure required by it. Current growth is putting massive, and unresolved pressures on the capacity of existing transport links, and the physical capacity of Cambridge’s roads system and public realm.

The GCP’s Making Connections proposals, currently under consultation, attempt to resolve some of the challenges, but have no detailed assessment of the capacity of Cambridge’s streets to take the extra volumes of bus and cycle traffic being proposed. Given that Cambridge’s congestion problems are historic, and compounded by growth, this consultation on Local Plan proposals for additional growth is premature in the absence of credible and detailed proposals to tackle current capacity issues.
S/DS: Development strategy
How can the proposals aim for net zero with this sheer volume of proposed development (while whole-life costing of large new proposals is welcome, what about the carbon cost of developments in the pipeline? - see above and comments on CC/NZ below).
No mention of impacts of transport links required for these proposals. Need to ensure that these are brought forward in concurrently with the Local Plan proposals.
Cambridge urban area
Cambridge urban area - general comments

Massive environmental capacity issues, with inadequate space in City streets and public realm to cater for existing traffic, let alone approved growth already in the pipeline – even before considering these First Proposals. The capacity issues have to be tackled, with additional growth allowed only if they can be resolved.

No mention of Covid and opportunities for city centre residential / other uses resulting from potential radical changes in retail.
No new cultural or provision for other “city-scale” needs, so putting the city centre under even greater pressure.

S/NEC: North East Cambridge
Vividly illustrates the issues. Gross over development.
Edge of Cambridge
Edge of Cambridge - general comments
The Green Belt assessment is not fit for purpose, because it ignores historic environment designations and landscape character constraints.

This highlights a vital flaw of the Plan, its failure to take a holistic view of the combination of different elements (including historic and natural environment) which make up the character of Greater Cambridge. The Government may have tried to artificially separate the natural and built environment with its Environment Act, but that doesn’t mean this approach should be followed in Cambridge!

Climate change
Climate change - general comments

The definition of a Net Zero Carbon building set out in the Evidence Base does not include its embodied carbon: this is a very serious omission which undermines all claims made about the sustainability of new development, and raises questions about the claimed sustainability credentials of all the Growth options being proposed.

Already out of date in terms of Government targets (e.g. the Heat and Buildings Strategy, not mentioned in the draft Plan), and rapidly developing guidance and best practice.
Support regular reviews to keep pace with developing technology, standards, Government targets (e.g. the Heat and Buildings Strategy, not mentioned in the draft Plan), and rapidly developing guidance and best practice. There are also serious quality control challenges in relation to whether aspirational aims are actually delivered. How will this be done? Outline planning permissions must be subject to the aspirations articulated in draft local plan. How will this be done?
Projects proposed to help achieve net zero need to be both delivered and SAFEGUARDED, throughout the Plan period, to ensure that the aims are delivered (e,g, need to ensure that biodiversity / natural capital / “doubling nature” (sic) and any other such schemes are protected from subsequent inappropriate changes of use or management)
Agree that development should be located so that low carbon transport links can be accessed. However, such locations should not be chosen based on proposed busways – the delivery of these is uncertain and their construction generates carbon emissions through the embodied carbon in the building materials, tree felling reducing carbon capture, maintenance and serving works, and lighting, contrary to the Council’s net zero carbon agenda.

CC/NZ: Net zero carbon new buildings
The definition of a Net Zero Carbon building set out in the Evidence Base does not include its embodied carbon: this is a very serious omission which undermines all claims made about the sustainability of new development, and raises questions about the claimed sustainability credentials of all the Growth options being proposed.

Support recognition of embodied carbon, also whole life carbon (see CC/CE). build for future re-use, including requiring use of lime mortar not cement to enable re-use of fired and quarried materials.

Where possible, existing buildings should be re-used (“The greenest building is the one that already exists”– Carl Elefante https://www.architectsjournal.co.uk/news/opinion/the-greenest-building-is-the-one-that-already-exists quoted in the Architect’s Journal Retrofirst campaign https://www.architectsjournal.co.uk/news/opinion/join-our-retrofirst-campaign-to-make-retrofit-the-default-choice)

Require whole-life assessments whenever demolition of an existing building is proposed. (e.g. false net zero claims made for new Kings College development on Barton Rd – no mention of the embodied carbon of the buildings demolished to make way; same applies to the Flying Pig replacement) .

CC/CE: Reducing waste and supporting the circular economy
Support recognition of embodied carbon, also whole life carbon (see CC/CE). build for future re-use, including requiring use of lime mortar not cement to enable re-use of fired and quarried materials.

Where possible, existing buildings should be re-used (“The greenest building is the one that already exists”– Carl Elefante https://www.architectsjournal.co.uk/news/opinion/the-greenest-building-is-the-one-that-already-exists quoted in the Architect’s Journal Retrofirst campaign https://www.architectsjournal.co.uk/news/opinion/join-our-retrofirst-campaign-to-make-retrofit-the-default-choice)

Require whole-life assessments whenever demolition of an existing building is proposed. (e.g. false net zero claims made for new Kings College development on Barton Rd – no mention of the embodied carbon of the buildings demolished to make way; same applies to the Flying Pig replacement) .

Incredibly, no mention of retrofit in the Climate Change topic paper! The Council’s apparent view that retrofit is not within the scope of the Plan is mistaken. The only place in which retrofit is mentioned, and far too narrowly, is in policy GP/CC in the Great Places paper. This is one of several instances where a holistic approach should require read-across between Policies in different sections (e.g. also between historic environment and natural environment).

Retrofit will be within the direct scope of the Plan (guiding planning decisions) whenever it involves works which could potentially require planning permission or listed building consent.
[Case in point is the new Institute for Sustainability Leadership building (conversion of former telephone exchange) on Regent St. Major impact on appearance of building which makes (or made) a positive contribution to the Conservation Area, not a heritage asset but requiring planning permission. The submitted justification included every possible assessment criterion apart from townscape / heritage impact (shockingly not even considered by the applicants!). What has been approved and is now being built involved losing the window detailing which was a key part of the building’s character. Since that scheme was approved, PAS 2038 (non-domestic retrofit guidance) has come into force: it would have required a more comprehensive approach by the applicants, and might have led to a different decision. ]

Retrofit is also within the scope of the Sustainable Design and Construction SPD, which needs to be updated to include embodied carbon, over the whole life cycle of construction (including retrofit and refurbishment), as set out in British Standard BS EN 15978:2011:
SEE ATTACHED
(slide by Alice Moncaster)

This Climate Change section should include specific policies covering retrofit, which will feature ever more strongly as Govt targets for Band C etc bite. These targets present serious challenges now, and will get ever more serious during the Plan period, with high risks of carbon (and money) being wasted on inappropriate works. Yet Net Zero Carbon for existing buildings is mentioned only cursorily, on a single page (35) of the Local Plan’s Net Zero Carbon Evidence Base.

There is no mention whatsoever of the need for a different approach to buildings of traditional solid wall construction. These form at least a quarter of the existing stock; this proportion should have been considered and assessed as part of the Evidence Base. It could even be as high as 35%, the proportion quoted in the BRE study “Solid wall heat losses and the potential for energy saving” published by DECC in 2015.

The specific challenges of traditional buildings , and the risks of unforeseen consequences (and of consequent waste, rather than saving, of carbon and money) are highlighted in PAS2035, the Government’s guidance on domestic retrofit, which is referenced in Policy GP/CC. However the reference to PAS 2035 in the Policy is futile in its draft form because the PAS (although Government guidance) is not freely available, but published by the British Standards Institute, costing £190, and so is inaccessible to home owners and others who need the guidance.

The Climate Change section of the Plan should quote key principles and guidance* from PAS 2035 and its non-domestic counterpart PAS 2038 (and reference other freely available advice including from the STBA and IHBC as well as the Government’s own guidance to Private Sector Landlords) in sufficient detail to ensure that people dealing with ALL traditional buildings (not only heritage assets) have access to the appropriate advice and skills to ensure that their buildings are put in good repair, and then suitable retrofit measures are applied as appropriate. See https://stbauk.org/whole-house-approach/. This is essential to achieve the aims of the PASs and to minimise unintended consequences.
*including (e.g.) section 0.1.1 of PAS 2035:
SEE ATTACHED

Biodiversity and green spaces
Biodiversity and green spaces - general comments
Serious environmental capacity issues (see above), particularly in relation to intensification of pressures on green spaces..

BG/BG: Biodiversity and geodiversity
Projects proposed to help achieve net zero need to be both delivered and SAFEGUARDED, throughout the Plan period, to ensure that the aims are delivered (e,g, need to ensure that biodiversity / natural capital / “doubling nature” and any other such schemes are protected from subsequent inappropriate changes of use or management)

BG/GI: Green infrastructure
Flawed in that green infrastructure and historic environment re considered separately (see comments on Edge of Cambridge, River corridors, and Protecting open spaces). A holistic approach is essential – see NPPF definition of the historic environment..

BG/RC: River corridors
The River Cam Corridor initiative does not mention the historic environment, historic environment designations, or conservation area appraisals. High risks of more intensive use. no mention of environmental capacity issues or recognition that there may be capacity limits to growth or access by either/both local people and visitors (impacts of punt operators on Cam, etc). No mention of historic environment designations. No consideration of areas under particular threat. No consideration of historic / characteristic uses and land management. The whole river corridor from Byron’s Pool to Baits Bite, and its historic uses are vital parts of the historic and cultural as well as landscape character of Cambridge and should be safeguarded. Grantchester Meadows, one of the key river corridor historic and cultural spaces, is the only vital section of the corridor currently without Conservation Area designation; it is currently threatened by visitor pressures and by possible removal of the grazing cattle which play a vital part in traditional water meadow management.

BG/PO: Protecting open spaces
No mention that many open spaces are historic, and form part of the historic environment (see NPPF definition of the historic environment) need to consider their significance as a whole, not just in terms of green infrastructure. Historic environment and local identity are vital elements of the wellbeing identified here

BG/EO: Providing and enhancing open spaces
Open space is not just green space - what about the market square, Quayside etc etc? Need to manage existing pressures, and avoid harmful intensification of use, on all open spaces, and ensure that new development does not increase these pressures. The river corridor is particularly vulnerable.


Wellbeing and inclusion
Wellbeing and inclusion - general comments
There are no documents in the Document Library to support this theme. Why not?

The Topic Paper highlights the importance of place and space, but its text is focused on new developments, and does not mention the contribution made to wellbeing by the beauty and special character of existing places, including the city of Cambridge, the towns and villages, and valued countryside. The historic environment is a vital part of wellbeing.

Nor is Covid mentioned, even though the pandemic has highlighted the vital importance of access to local green space, and to local fresh food. Small local producers have continued to provide when the supermarkets supply chains fail. Cambridge market, and the local producers who sell from it, continues to provide a lifeline of health and wellbeing for many people, as well as providing vital opportunities for business start-ups including makers as well as food sellers.

There is no assessment of existing cultural activities, of current demands for space, or of demands for new space arising from either existing approved growth or that now proposed. Nor is there any assessment of related opportunities in terms of under-used retail space post-Covid. This is a totally inadequate baseline for a credible Plan.

The forthcoming Cultural Infrastructure Strategy for Greater Cambridge will need to recognise Cambridge’s international cultural significance in terms of both its historic environment (which meets UNESCO’s Outstanding Universal Value criteria for World Heritage sites), and its past and present cultural activities. The Local Plan should include policies to protect this significance, and specifically to support cultural activities, and to provide for, and safeguard, public and private spaces for arts and other activities.

Great places policies
Great places – general comments

The Great Places paper refers to Heritage Assets, but completely fails to recognise that the city of Cambridge is a heritage asset of worldwide significance which meets UNESCO’s Outstanding Universal Value criteria for World Heritage status. This significance derives from the combination of its built and natural heritage. The draft Plan fails to recognise the vital role which this special character plays in making Cambridge a great place to live in, work, study, and visit.

The draft Plan also fails to recognise the historic relationships between Cambridge as a market town, its market, and its productive hinterland.

The draft Plan’s approach involves a false separation between Landscape and Townscape (Objective 6) and Historic Environment (Objective 7), which for Cambridge has resulted in inadequate consideration and valuation of the historic city in its historic landscape setting, with historic landscape and open spaces considered as green infrastructure but not as historic environment.

Cambridge’s special character has been, and continues to be, under severe threats from the quantum of already approved growth (built developments and pressures on both streets and green spaces). There are severe environmental capacity issues in trying to accommodate the demands of a 21st century city within what remains the built fabric and spaces of a medieval market town. These fundamental conflicts between growth on the one hand and environmental capacity and special character on the other should have been recognised as a key challenge for the draft Local Plan. so why wasn’t the Historic Environment Baseline Study prioritised, and published as part of the Nov 2020 tranche?

But the draft Plan documents include no assessment of current pressures, let alone the impacts of the draft First Proposals.

Instead, para 3.2.4 of the Strategic Heritage Impact Assessment: baseline makes a totally unevidenced statement that:
“3.2.4 Future growth in Cambridge has the potential to strengthen and reinforce these characteristics, enabling the City to meet contemporary environmental, economic and social drivers without undermining its economic identity".

Overall, the Evidence base for Great Places is inadequate, and the proposals are premature pending a thorough review of the success or failure of existing policies.


GP/LC: Protection and enhancement of landscape character
Over-intensification of use is a major threat to landscape character.

GP/GB: Protection and enhancement of the Cambridge Green Belt
I strongly support protection of the Green Belt, but the Green Belt assessment is not fit for purpose, because it ignores historic environment designations and landscape character constraints.

The Council appears to have forgotten that the Green Belt was set up to protect the setting of the historic University city.

GP/QP: Establishing high quality landscape and public realm
Serious issues of street capacity.

GP/HA: Conservation and enhancement of heritage assets
A vital issue given totally inadequate consideration and priority. The historic environment (not just heritage assets) is a vital part of Cambridge, not just in terms of Great Places, but also for Wellbeing, and for the city’s prosperity.

The historic environment, and its capacity (or not) to withstand existing growth (let alone new growth proposed) should have been considered at the start of the Great Places chapter. Understand what you have, then consider its capacity for change
Fails to consider anything other than designated heritage assets. No consideration of heritage significance of Cambridge as a whole, or of the heritage significance of undesignated buildings, spaces, and intangible heritage –notably Cambridge’s market, which pre-dates the University, and Grantchester meadows.
The Heritage Impact Assessment is not fit for purpose, and clearly written by consultants who have limited knowledge of Cambridge, and of issues, policies, and initiatives relating to its historic environment. There is no mention of any Conservation Area appraisal apart from the Historic Core, and no cumulative assessment of significance and issues identified in these Appraisals.
.
The “Strategic Heritage Impact Assessment: baseline” is woefully inadequate in both its scope and its approach:
a) In its scope, because it confines itself to stages 1 (identify the historic assets” and 2 (“define and analyse the settings”) of Historic England’s ”Settings of Heritage Assets: Good Practice Guide”, without considering the dynamic of the city as a whole, what has been happening in its recent years, or the potential impacts of currently approved growth. It is almost as if the Council asked for an updated version of the 1971 publication “Cambridge Townscape”, whilst completely disregarding the award-winning conservation plan approach of the 2006 Historic Core Appraisal which sought to understand not just the physical character of Cambridge but its dynamic, and threats and opportunities, as part of shaping policies.

b) while the document references the Historic Core Conservation Area Appraisal, it does not even mention other Conservation Area Appraisals (ignoring the complete Appraisal coverage of the City's Conservation Areas) or issues and opportunities identified therein. Nor does it mention the Suburbs and Approaches Studies. It is all too clear that the consultants have taken only a superficial look at the baseline information.

c) I would have expected consultants preparing this “high level” document to consider the historic environment, and the extent of designations, strategically (a great opportunity for this combined Plan) - but the document does not even consider the extent to which Cambridge’s historic and cultural landscape (including the river corridor from Byron’s pool to Baits Bite Lock) is or is not protected.

d) The study completely fails to assess the significance of Cambridge as a whole. Dennis Rodwell’s “Conservation and Sustainability in Historic Cities” puts Cambridge on a similar level of international significance to Venice.

e) For the options involving development in and adjacent to Cambridge, it seems to assume that most problems can be resolved by Design, completely ignoring environmental capacity issues. At a most immediate level, what if any detailed assessment has been made of the wider visual impacts of tall buildings on the North-East Cambridge site?

There are fundamental environmental capacity issues in terms of pressures on the character and spaces of the historic core and surrounding landscape, due to not only the additional volumes of development, people and traffic being generated by the proposed additional growth, but all of these arising from existing approved growth plus the transport links required to enable it.

There is no assessment whatever of the cumulative impacts on landscape, townscape and environmental capacity of all the GCP and other proposals including busways, City Access, Greenways, Active Travel schemes etc.

A third-party, holistic overview is essential to identify and try to resolve some of these key strategic issues and balances, and consider to what extent further growth is viable. In relation to heritage, growth is seriously threatening what makes Cambridge Special. I suggest that Historic England’s Historic Places Panel are invited to visit Cambridge and provide strategic recommendations which can inform the Local Plan.

The flaws in the current approach are exemplified by a claim in the Strategic Heritage Impact Assessment: baseline:
“3.2.4 Future growth in Cambridge has the potential to strengthen and reinforce these characteristics, enabling the City to meet contemporary environmental, economic and social drivers without undermining its economic identity"
This statement can only be described as unevidenced, shockingly ignorant and ludicrously complacent.
Moving from strategic issues to safeguarding individual heritage assets and their settings, there are serious questions in relation to the effectiveness of existing policies which are proposed to be carried forward.

A case in point is the former Mill Road Library a grade II listed building of high public significance, which was recognised to be “at risk” but ignored by both the City and County Councils during the development and approval of the City’s Depot site redevelopment. This was a massive opportunity which would not have been missed had the City complied with its own Local Plan policy regarding heritage assets. While the County has belatedly refurbished the former Library, it has not been integrated as a public building within the new development. It appears that the County may now be offering this public building, built for the public, for private sale!

GP/CC: Adapting heritage assets to climate change
This policy is basically very good -but should relate to all buildings of traditional construction, and needs some updating. Needs direct read-across to CC/NZ. See my comments on CC/NZ.
Supporting documents on which we are consulting
Sustainability Appraisal (incorporating the requirements of the Strategic Environmental Assessment)

The Sustainability Appraisal fails to tackle the key environmental capacity issues arising from existing growth, let alone that now proposed.

The whole definition of “Sustainable Development” is too narrow given that since 2010 the UN has included Culture as the 4th pillar of Sustainable Development - and Cambridge's historic environment is a cultural asset of worldwide significance.

Within the current UK sustainability assessment process (dating from 2004 and excluding culture), there is a separation between Landscape and Townscape (Objective 6) and Historic Environment (Objective 7), which for Cambridge has resulted in inadequate consideration and valuation of the historic city in its historic landscape setting, with historic landscape and open spaces considered as green infrastructure but not as historic environment.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

Representation ID: 60779

Received: 13/12/2021

Respondent: Cambridge and South Cambridgeshire Green Parties

Representation Summary:

Great places have a blend of community, nature, and beauty, Cambridge is losing theirs.
No recognition Cambridge is a city heritage asset of worldwide significance meeting UNESCO’s Outstanding Universal Value criteria for World Heritage status.

Historic landscape and open spaces considered as green infrastructure not as historic environment.

Concern the evidence base for Great Places is inadequate, and the proposals are premature pending a
thorough review of the success or failure of existing policies.

Community
New neighbourhoods need additional community spaces to encourage cohesion and local friendships.

Nature
Concerns for availability and quality of spaces interacting with nature. New developments need to do better, people need space to walk in nature, to watch it, to rest in it.

Beauty
Cambridge's heritage of incredible architectural inheritance is being lost on it's central streets.

Full text:

Great places have a compelling blend of community, nature, and beauty. Cambridge is destroying all of
these, and rapidly creating naff spaces.
The Great Places paper refers to Heritage Assets, but completely fails to recognise that the city of Cambridge is a city heritage asset of worldwide significance which meets UNESCO’s Outstanding Universal Value criteria for World Heritage status.
This significance derives from the combination of its built and natural heritage. The draft Plan fails to recognise the vital role which this special character plays in making Cambridge a great place to live in, work, study, and visit.
The draft Plan’s approach involves a false separation between Landscape and Townscape (Objective 6)
and Historic Environment (Objective 7), which for Cambridge has resulted in inadequate consideration
and valuation of the historic city in its historic landscape setting, with historic landscape and open spaces
considered as green infrastructure but not as historic environment.
Cambridge’s special character has been, and continues to be, under severe threats from the quantum of already approved growth (built developments and pressures on both streets and green spaces). There are severe environmental capacity issues in trying to accommodate the demands of a 21st century city within what remains the built fabric and spaces of a medieval market town.
These fundamental conflicts between growth on the one hand and environmental capacity and special character on the other should have been recognised as a key challenge for the draft Local Plan.
But the draft Plan documents include no assessment of current pressures, let alone the impacts of the draft First Proposals.
Instead, para 3.2.4 of the Strategic Heritage Impact Assessment: baseline makes a totally unjustified statement that:
“3.2.4 Future growth in Cambridge has the potential to strengthen and reinforce these characteristics,
enabling the City to meet contemporary environmental, economic and social drivers without undermining
its economic identity”.
Overall, the Evidence base for Great Places is inadequate, and the proposals are premature pending a
thorough review of the success or failure of existing policies.
Community requires a degree of stable population, and works better when people are investing in a place they want to stay in. However, people often come to Cambridge for 5 years in a tech job or a research post and move on again. This benefits the diversity of our city but means that civic engagement is patchy and social networks are largely based on livelihood or interests, rather than place. New neighbourhoods need additional community spaces to encourage cohesion and local friendships.
Independent shops are a good place for community to build, we must do away with the assumption that new developments will orbit around a supermarket.
Nature is being annihilated globally, it is not a problem specific to Cambridge. It is necessary to have some spaces where humans can enjoy interacting with nature, and some spaces where nature can enjoy NOT interacting with humans. For a city, Cambridge is quite wealthy in green spaces, but lockdown and shortage of community facilities have given many green spaces the air of a festival in daytime and a fix room at nighttime. New developments must do better than a tree in a square metre of soil, or a rooftop garden, people need space to walk in nature, to watch it, to rest in it.
Beauty is part of our heritage in Cambridge, not only through the natural world but an incredible architectural inheritance. The narrative on many central streets is one of design and construction skills being lost - vulgar unworthy buildings which spoil the setting of the wonderful ones. Soulless concrete and glass, towers of it, and chain brands that welcome you to Clone Town, Anywhere. And public art that aspires to be vapid enough to fit right in.
We want to see this three-fold destruction paused, until the planning system is fit to support appropriate means to heal the damage.