A1. Evidence of Lead-In Times, Lapse Rates, Build Out Rates and Windfalls
Showing comments and forms 1 to 1 of 1
Comment
Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Annex
Representation ID: 168467
Received: 14/10/2019
Respondent: Pigeon Land Ltd
Agent: Savills
Representation Summary:
Appendix C to the Main Document is entitled 'Evidence of Lead-In Times, Lapse Rates and Build Out Rates'. Section A1 to the Annex is very similarly entitled 'Evidence of Lead-In Times, Lapse Rates, Build Out Rates and Windfalls'. The relationship between the two is unclear; however, the evidence appears to be the same.