Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168452

Received: 14/10/2019

Respondent: Pigeon Land Ltd

Agent: Savills

Representation Summary:

The document reports the position to 31 March 2019 and projects the requirement and supply from 1 April 2019. The 5YHLS period assessed is thus from 1 April 2019 (the base date) to 31 March 2024 - i.e. 2019/20 to 2023/24. The document states that it will be used when making decisions from September 2019 onwards. We would point out that the figures in the document will require updating as of 1 April 2020 and thus that the document should only be used until then (assuming it is correct).