Comment

North East Cambridge Area Action Plan Issues and Options 2019

Representation ID: 33792

Received: 25/03/2019

Respondent: Trinity College

Agent: Bidwells

Representation Summary:

The Cambridge Science Park [CSP]Plan shows a Mixed Use Local Centre to the southern boundary, where there are existing occupied buildings.

We propose the Mixed Use centre should be shown to the east, to the north of the Green Route entering the south east corner of CSP. This is where the planned 'Hub' a multiuse centre constructed, managed and developed by Trinity College) is proposed.

It should be noted that the existing pedestrian link to the Cambridge Guided Bus [CGB] at the south west corner of CSP; at the point the AAP boundary meets the CGB.

We support The Green connection running north east through CSP to cross Milton Road to increase connectivity east-west to the train station and may have to be delivered in a phased manner.

Full text:

Please see attached representation