We support all options in principle as long as they were designed and designed collaboratively to ensure it functioned appropriately. Specifically we view constarints as:

Option-A: May be difficult to do due to phasing. Brookgate have learnt that green spaces at a smaller scale are more effective in residential-led schemes to serve the surrounding local community.

OptionB: This would also have to be appropriately connected for infrastructure purposes

OptionC:Proper accessibility and connectivity requires appropriate connections to the broader network.

OptionD:We could support this, but it will require a review of specific proposals.

OptionE:Structured landscape edges can tend to act as buffers which separate parts of a district. Design needs to be taken to prevent reducing the level of perceived or actual connectivity across the district.