Greater Cambridge Local Plan: Sustainability Appraisal of Issues and Options
Ended on the 24 February 2020
Adobe Acrobat Reader is required to view these files. Click the link to download it for free.
| Document | Size |
|---|---|
Sustainability
Appraisal Scoping Report: Non-Technical Summary
|
292 K |
Chapter 1.
Introduction
|
200 K |
Chapter 2.
Methodology
|
135 K |
(6)
Chapter 3.
Sustainability Appraisal Findings
|
287 K |
Chapter 4.
Conclusions
|
137 K |
For instructions on how to use the system and make comments, please see our help guide.
Sustainability
Appraisal Scoping Report: Non-Technical Summary